Skip to content

Building Structural study guideStructure

Renovation compliance alternatives and Division C design and review

Compliance alternatives, and the Division C items on design and general review by architects and engineers, permits, occupancy, notices and as constructed plans, alternative solutions and rulings.

chapters in this guide
14 of 14
chapters in this guide
to read
5 min
to read
code articles cited
17
code articles cited

Last updated

Values this chapter turns on

of Part 3 sizes for existing heavy timber to pass
90%
of Part 3 sizes for existing heavy timber to pass
tent area needing an engineer for framing
225 m²
tent area needing an engineer for framing
projecting sign weight needing a designer
115 kg
projecting sign weight needing a designer
roof sign face area needing a designer
10 m²
roof sign face area needing a designer

The last section of the syllabus is administrative, but each item has a structural angle. It covers who may design a foundation or a rack system, who must review it, which inspections the permit holder must call, and how a renovation can relax structural requirements. Questions here are mostly lookups and short scenarios.

Compliance alternatives for existing buildings (11.5)

Section 11.5 offers compliance alternatives, listed in Tables 11.5.1.1.-A to -F, that may replace Division B requirements in existing buildings OBC Div. B 11.5.1.1.OBC Div. B 11.5.1.1. Compliance Alternatives(1) A compliance alternative shown in Table 11.5.1.1.-A, 11.5.1.1.-B, 11.5.1.1.-C, 11.5.1.1.-D/E or 11.5.1.1.-F may be substituted for a requirement contained in Part 3, 4, 6 or 8 where the chief building official is satisfied that compliance with the requirement is impracticable because, (a) of structural or…. How you can use one depends on the Part:

Requirement in May the alternative be used?
Part 3, 4, 6 or 8 Only if the chief building official is satisfied compliance is impracticable, because of structural or construction difficulties or harm to a heritage building
Part 9 or 12 Yes, with no impracticability finding needed

Some structural alternatives for residential occupancies are in Table 11.5.1.1.-COBC Div. B Table 11.5.1.1-C. Compliance Alternatives for Residential Occupancies — Forming Part of Article 11.5.1.1.Table 11.5.1.1.-C Compliance Alternatives for Residential Occupancies — Forming Part of Article 11.5.1.1. C.A. Number | Division B Requirements | Compliance Alternative C1 | 3.1.4.7. | Existing heavy timber construction acceptable where construction is within 90% of member sizes listed in Part 3. C2 | 3.1.5.2. to…:

No. Requirement Alternative
C1 3.1.4.7 heavy timber existing heavy timber accepted if within 90% of the Part 3 member sizes
C94 4.1.8 earthquake the requirements of the Subsection do not apply
C189 9.20.12.1 corbelling may match existing details if structurally adequate
C192 9.23 wood framing existing acceptable

Practice this topic

Design by architects and engineers (Division C 1.2)

Division C names structural work that only a professional engineer may design OBC Div. C 1.2.1.2.OBC Div. C 1.2.1.2. Design by Architect or Professional Engineer(1) A foundation of a building shall be designed by a professional engineer where, (a) the foundation is to be constructed below the level of the footings of an adjacent building and within the angle of repose of the soil, as drawn from the bottom of the footings, or (b) underpinning of a foundation is to be…:

  • a foundation below the footings of an adjacent building and within the soil's angle of repose, or any underpinning;
  • a sprinkler-protected glazed wall assembly;
  • a shelf and rack storage system under Section 3.16;
  • the framing and anchorage of a tent over 225 m².

Signs attached to a building need an architect, an engineer or both where the sign is either:

  • a projecting sign over 115 kg; or
  • a roof sign with any face over 10 m².

Any projecting sign on a parapet also needs one. Article 1.2.1.1 links these rules to the Architects Act and the Professional Engineers Act OBC Div. C 1.2.1.1.OBC Div. C 1.2.1.1. Application(1) Article 1.2.1.2. applies with respect to a building described in clause 11(3)(a) or (b) of the Architects Act or subsection 12(4) or clause 12(5)(a) of the Professional Engineers Act..

Practice this topic

General review (Division C 1.2.2)

The owner must retain an architect, an engineer or both for general review where Table 1.2.2.1.OBC Div. C Table 1.2.2.1. General Review — Forming Part of Sentence 1.2.2.1.(1)Table 1.2.2.1. General Review — Forming Part of Sentence 1.2.2.1.(1) Forming Part of Sentence 1.2.2.1.(1) Building Classification by Major Occupancy[5] | Building Description | General Review by: Assembly occupancy only | Every building | Architect and professional engineer[1] Assembly occupancy and any other major… requires it. The reviewer checks that construction is in general conformity with the permit documents and sends written reports to the chief building official or registered code agency OBC Div. C 1.2.2.1.OBC Div. C 1.2.2.1. General Review by Architect or Professional Engineer(1) The construction, including, for greater certainty, enlargement or alteration, of every building or part of it described in Table 1.2.2.1. shall be reviewed by an architect or a professional engineer or a combination of both as set out in Column 3 of the Table. (2) A person who intends to construct or have….

Building General review by
Assembly, care or detention (any size) architect and engineer
Business or mercantile, over 600 m² gross area or over 3 storeys architect and engineer
Industrial or agricultural only, over 600 m² or over 3 storeys architect or engineer (engineering work by an engineer only)

Some items need engineering review whatever the building:

  • the adjacent-footing foundations and underpinning above;
  • shelf and rack storage systems;
  • tents over 225 m²;
  • demountable stages.

Signs need review in these cases:

  • a ground sign over 7.5 m high;
  • a projecting sign over 115 kg;
  • a roof sign with any face over 10 m²;
  • any projecting sign on a parapet.

Review follows design: only an architect reviews an architect's design, and only an engineer reviews an engineer's OBC Div. C 1.2.2.2.OBC Div. C 1.2.2.2. Restriction for General Review(1) Only an architect may carry out or provide the general review of the construction of a building, (a) that is constructed in accordance with a design prepared or provided by an architect, or (b) in relation to services that are provided by an architect in connection with the design in accordance with which the….

Practice this topic

Permits, notices and as constructed plans

No permit is needed for three kinds of work OBC Div. C 1.3.1.1.OBC Div. C 1.3.1.1. Requirement for Permits(1) A person is exempt from the requirement to obtain a permit under section 8 of the Act, (a) for the demolition of a farm building located on a farm, (b) subject to Sentence (2), for the construction or demolition of a building in territory without municipal organization, or (c) for the construction of a Class 1…:

  • demolishing a farm building on a farm;
  • building a Class 1 sewage system;
  • most work in unorganized territory.

Exempt from both the permit and the Code:

  • a shed of 15 m² or less, one storey, detached, storage only and without plumbing;
  • tents up to 60 m² in total that are not attached and stand more than 3 m from other structures.

Prescribed notices the permit holder must give OBC Div. C 1.3.5.1.OBC Div. C 1.3.5.1. Prescribed Notices(1) This Article sets out the notices that are required under section 10.2 of the Act. (2) The person to whom a permit under section 8 of the Act is issued shall notify the chief building official or, where a registered code agency is appointed under the Act in respect of the construction to which the notice relates…. The structural ones are:

  1. readiness to construct footings;
  2. substantial completion of footings and foundations before backfilling;
  3. substantial completion of structural framing. For Part 9 this is combined with heating and air-conditioning ductwork and piping; otherwise it is combined with HVAC rough-in.

Additional notices a municipality may add by by-law OBC Div. C 1.3.5.2.OBC Div. C 1.3.5.2. Additional Notices(1) A by-law, resolution or regulation made by a principal authority under clause 7(1)(e) of the Act may require that notice of one or more of the following stages of construction be given by the person to whom a permit is issued under section 8 of the Act: (a) commencement of construction of the building, (b)…. These include structural framing for each storey of non-Part 9 buildings, masonry fireplaces and chimneys, and the availability of as constructed drawings.

Occupancy of houses. Before a house-type residential building is occupied, its structure must be substantially complete. That house-type building is one of 3 storeys or less and 600 m² or less, with no unit above another OBC Div. C 1.3.3.4.OBC Div. C 1.3.3.4. Occupancy Permit — Certain Buildings of Residential Occupancy(1) No person shall occupy or permit to be occupied a building described in Sentence (3), or part of it, unless the chief building official or a person designated by the chief building official has issued a permit authorizing occupation of the building or part of it in accordance with Sentence (4). (2) This Article….

As constructed plans. These are plans and specifications that show the building, and its location on the property, as built OBC Div. A 1.4.1.2.OBC Div. A 1.4.1.2. Defined Terms(1) The words and terms in italics in this Code shall have the following meanings: (a) the same meaning as in subsection 1(1) of the Act, if not defined in Clause (b) or (c), (b) the same meaning as in each of the following provisions for the purposes described in the provision: (i) Sentences 1.4.1.3.(1) and (2) of…. The chief building official may require them where a by-law under clause 7(1)(g) of the Act exists OBC Div. C 1.3.6.1.OBC Div. C 1.3.6.1. Application(1) Where a by-law, resolution or regulation has been made by a principal authority under clause 7(1)(g) of the Act, the chief building official may require that as constructed plans for the whole of, or any part or system of, a building or any class of buildings be provided by the persons responsible for the….

Practice this topic

Alternative solutions and rulings

An alternative solution is a substitute for an acceptable solution. The proposer must document four things for the chief building official or registered code agency OBC Div. C 2.1.1.1.OBC Div. C 2.1.1.1. Documentation(1) The person proposing the use of an alternative solution shall provide documentation to the chief building official or registered code agency that, (a) identifies applicable objectives, functional statements and acceptable solutions, and (b) establishes on the basis of past performance, tests described in Article…:

  • the objectives, functional statements and acceptable solutions involved;
  • evidence from past performance, tests or other evaluation that the required level of performance is met;
  • the assumptions and limits behind it;
  • any commissioning and maintenance needs.

If no published test exists, the tests must simulate or exceed service conditions, or compare against a known acceptable product OBC Div. C 2.1.1.2.OBC Div. C 2.1.1.2. Tests(1) Where no published test method to establish the suitability of an alternative solution proposed under Article 2.1.1.1. exists, then the tests used for the purposes of that Article shall be designed to simulate or exceed anticipated service conditions or shall be designed to compare the performance of the material….

Minister's rulings. A Minister's ruling approving an alternative material, system or design must be consistent with one of three things OBC Div. C 2.4.2.1.OBC Div. C 2.4.2.1. Criteria(1) Sentence (2) sets out criteria to be followed by the Minister when making a ruling under clause 29(1)(c) of the Act to approve the use of an alternative material, system or building design. (2) The Minister’s approval of the use of an alternative material, system or building design referred to in Sentence (1) may…:

  • a Building Code Commission decision;
  • an approval in the whole of another province or territory;
  • a CCBFC-approved revision of the 2020 National Building Code or National Plumbing Code.

Ministerial interpretations are posted publicly OBC Div. C 2.4.3.1.OBC Div. C 2.4.3.1. Interpretations By Minister(1) Every interpretation issued by the Minister under section 28.1 of the Act shall be made available to the public, (a) by posting the interpretation on the Building Code website, and (b) by providing a written copy of the interpretation on receipt of a request for it..

Practice this topic

Chapter review

Chapter at a glance

One line per section: the idea to carry into the exam. Then the answers that most often catch candidates out.

Practice this chapter

Questions on Renovation and Division C design and review, in the exam format, every answer explained and cited to its article. Sign in to start; a free account gets the free questions.

Code cited in this chapter

Based on the official 2024 Building Code Compendium on ontario.ca.

© King's Printer for Ontario, 2024. Reproduced with permission.

  • OBC Div. B 11.5.1.1. Compliance Alternatives

    (1)A compliance alternative shown in Table 11.5.1.1.-A, 11.5.1.1.-B, 11.5.1.1.-C, 11.5.1.1.-D/E or 11.5.1.1.-F may be substituted for a requirement contained in Part 3, 4, 6 or 8 where the chief building official is satisfied that compliance with the requirement is impracticable because,

    (a)of structural or construction difficulties, or

    (b)it is detrimental to the preservation of a heritage building.

    (2)A compliance alternative shown in Table 11.5.1.1.-A, 11.5.1.1.-B, 11.5.1.1.-C, 11.5.1.1.-D/E or 11.5.1.1.-F may be substituted for a requirement contained in Part 9 or 12 without satisfying the chief building official that compliance with the requirement is impracticable.

    Open OBC Div. B 11.5.1.1. in the code viewer
  • OBC Div. B Table 11.5.1.1-C. Compliance Alternatives for Residential Occupancies — Forming Part of Article 11.5.1.1.

    Table 11.5.1.1.-C Compliance Alternatives for Residential Occupancies — Forming Part of Article 11.5.1.1. C.A. Number | Division B Requirements | Compliance Alternative C1 | 3.1.4.7. | Existing heavy timber construction acceptable where construction is within 90% of member sizes listed in Part 3. C2 | 3.1.5.2. to 3.1.5.4.; 3.1.5.8. | Existing acceptable. C3 | 3.1.5.9. to 3.1.5.12. | Except for exposed foamed plastics, existing acceptable. To match existing, materials may be added from on or off site. C4 | 3.1.5.18. to 3.1.5.20.; 3.1.5.21. | Existing acceptable. C5 | 3.1.7.1. | Fire-resistance ratings may also be used where they are based on: (a) HUD Rehabilitation Guidelines, "Guideline on Fire Ratings of Archaic Materials and Assemblies". (b) DBR Technical Paper No. 194, "Fire Endurance of Protected Steel Columns and Beams". (c) DBR Technical Paper No. 207, "Fire Endurance of Unit Masonry Walls". (d) DBR Technical Paper No. 222, "Fire Endurance of Light-Framed and Miscellaneous Assemblies". C6 | 3.1.7.5.(3) | Existing assemblies required to be of noncombustible construction may be supported by combustible construction having at least the same fire-resistance rating as that supported. C7 | 3.1.8.1.(2); 3.1.8.6.(1) and (2) | Existing functional closures are acceptable and may be relocated within the same existing Fire separation. C8 | 3.1.8.5.(2) | (a) Existing functional and sound doors in existing buildings that are either hollow metal or kalamein and containing wired glass at least 6 mm thick and conforming to Sentence 3.1.8.16.(2) are permitted in lieu of doors not required to exceed 45 min. (b) All existing functional and sound hollow metal or kalamein doors which carry existing 1.5 h labels are acceptable in lieu of current 1.5 h labels and may contain wired glass panels not exceeding 0.0645 m², at least 6 mm thick and conforming to Sentence 3.1.8.16.(2). (c) Every fire door, window assembly or glass block used as a closure in a required Fire separation shall be installed in conformance with good engineering practice. C9 | 3.1.8.7. to 3.1.8.10. | Except for hotels, Fire dampers or fire stop flaps are not required to be installed in existing ducts at penetrations of existing Fire separations. C10 | 3.1.8.12.(1) | For existing unlabeled doors in existing buildings, at least 45 mm solid core wood or metal clad are acceptable. Except for residential occupancies, existing closure rating of 20 min will not be required where the entire floor area is sprinklered. C11 | 3.1.8.14.(1) and (2) | In retirement homes, between a suite and a public corridor, existing 'pause' type self-closing devices may be used as hold-open devices where functionally operable. C12 | 3.1.8.15. | Existing functionally operable latching devices, excluding draw bolts, are acceptable. C13 | 3.1.8.16. | Existing transoms or sidelights located in Fire separations not required to be greater than 1 h may be retained if wired glass, at least 6 mm thick, is securely fixed to a wood frame of at least 50 mm thickness with steel stops. Operable transoms shall be fixed closed. C14 | 3.1.8.17. to 3.1.8.19. | Existing acceptable. C15 | 3.1.11. | Where the concealed space is being materially altered, provide smoke or heat detection in that space in lieu of fire blocks and tie into fire alarm system. C16 | 3.2.3. | Existing windows. (a) Existing windows in walls may be relocated to another part of the wall, provided the existing opening is blocked up to provide the same fire rating for the wall, and the projection of the new opening, at a right angle to the property line onto another building, lies not closer than 300 mm from a window in such other building, where the "opposite" window is less than 2,400 mm from the opposite new opening. (b) Except relocation of units, shall be restricted to the same fire compartment and shall conform to the requirements of Article 3.2.3.14. or 9.10.12.3. where applicable. (c) Where a building does not satisfy the requirements of Subsection 3.2.3. for the amount of openings facing a yard or space that does not have sufficient limiting distance, such existing openings are allowed to be relocated provided: (i) Such openings are not increased in size and they are protected with wired glass in steel frames conforming to Sentence 3.1.8.16.(2). (ii) The building is sprinklered. C17 | 3.2.3.6.(3) | Existing roof soffit projections acceptable. C18 | 3.2.4. | (a) Existing fire alarm system may remain except that Article 3.2.4.5. does not apply where the fire safety plan (as described in the Fire Code made under the Fire Protection and Prevention Act, 1997) for the building addresses the intent of Subsection 3.2.4. (i.e. "stage" system, electrical supervision, detection as required, Fire Department connection, and emergency power supply). (b) Extension of an existing system must ensure continuity and compatibility, and integrity of the system. C19 | 3.2.4.8.(2)(e) | Does not apply to existing installations in buildings. C20 | 3.2.4.9.(5)(c) | Does not apply to existing installations in buildings. C21 | 3.2.4.20. | Except for retirement homes, such smoke alarms may be battery operated. C22 | 3.2.5.1.; 3.2.5.2. | Existing acceptable. C23 | 3.2.5.3.(1) | Existing access acceptable. C24 | 3.2.5.3.(2) | Existing acceptable. C25 | 3.2.5.4. to 3.2.5.6. | (a) For buildings 6 storeys and less, existing access to existing occupancy is acceptable. (b) Where existing building is changed to a "C" occupancy, an access route shall be provided, or the existing access is acceptable provided the building is sprinklered. C26 | 3.2.5.7. | Existing water supply and hydrants are acceptable in buildings up to 6 storeys in building height. C27 | 3.2.5.8. to 3.2.5.11. | Does not apply to buildings 4 storeys and less. For existing buildings over 4 storeys in building height, existing standpipe and hose systems water supply is acceptable provided it can deliver a minimum flow rate of 265 L/min for 30 min at 345 kPa (gauge) at the two highest and most remote hose valves, with not less than 132 L/min from each of the two simultaneously. C28 | 3.2.5.12. | Existing sprinkler systems in existing buildings that do not conform to NFPA 13 may be altered, added to, or extended from the existing system without complying with NFPA 13, provided the system is operational and adequate with respect to coverage, water supply and controls, and provided the system is evaluated by a qualified designer. C29 | 3.3.1.4.(1); 3.3.4.2.(1) | 30 min is acceptable to separate corridors or exits in buildings not exceeding 6 storeys in building height, except that 45 min is required for exits in buildings exceeding 3 storeys in building height. For buildings exceeding 6 storeys in building height, 30 min is acceptable where smoke detectors are installed in corridors, except 1 h is required in exits. 30 min is acceptable to separate public corridors, exits or suites in hotels, provided fire detectors are installed in every room in a suite and in every room not located in a suite, other than corridors, washrooms, closets in suites, saunas, refrigerated areas and swimming pools. C30 | 3.3.1.5.(1)(c); Tables 3.3.1.5.-A and 3.3.1.5.-B | In Column 2, maximum area of room or suite to be unlimited. C31 | 3.3.1.9. | Existing width of public corridors of not less than 914 mm is acceptable. C32 | 3.3.1.11.; 3.3.1.12. | Existing door swings may remain in heritage buildings, existing or being restored, with no change in major occupancy and with occupant load no greater than 100. C33 | 3.3.1.13. | Existing doors acceptable, provided not less than 600 mm wide. C34 | 3.3.1.14. | Existing curved or spiral stairs acceptable. C35 | 3.3.1.17. | Existing non-conforming capacities of access to exits are acceptable, provided that the excessive capacity is no greater than 15% and: (a) Corridor Fire separations are rated to Code plus early warning system provided. (b) There are sprinklers, plus smoke alarms in suites. C36 | 3.3.1.18. | Does not apply to heritage buildings. C37 | 3.3.1.20. | Existing stained, etched, bevelled, leaded or figured glass acceptable. C38 | 3.3.4.2.(3)(b)(i) 3.3.4.2.(3)(b)(ii), (iii) | 30 min Fire separation acceptable. 45 min Fire separation acceptable. C39 | 3.3.4.4.(4) and (5) | For buildings 6 storeys and less, doorway from dwelling unit will be permitted to open directly into exit stairway or interior corridor served by a single exit if a fire alarm system complying with Subsection 3.2.4. is installed and the dwelling unit has a second and separate means of egress. C40 | 3.3.5.4.(1) and 3.3.5.7.(4) | Need not comply where a gasketed door and self closer are provided in the existing Fire separation. C41 | 3.4.1.4. | Except for hotels and retirement homes, the following types of exits may also be used for buildings not over 6 storeys in building height: (a) Connected balconies, which connect across firewalls, or connect to another exit, or with access to ground level. (b) Areas of refuge where fire service rescue is possible and that comply with Measure L of Sentences (4) to (10), (18) and Clauses (20)(a), (b) and (d) in MMAH Supplementary Standard SB-4, "Measures for Fire Safety in High Buildings". C42 | 3.4.1.8. | Existing stained, etched, bevelled, leaded or figured glass acceptable. C43 | 3.4.2.5.(1) | Existing travel distance acceptable where floor area is sprinklered and provided fire separations comply with Part 3. C44 | 3.4.3.2.(7) | Existing width of exits acceptable provided the occupant load is not more than 15% above the exit capacity. C45 | 3.4.3.3. | Except for heritage buildings, existing acceptable, provided not less than 800 mm. C46 | 3.4.3.4. | Existing headroom clearance of not less than 1,980 mm is acceptable. C47 | 3.4.4.1.(1) | Except for exits, no rating required where floor areas are sprinklered. C48 | 3.4.4.1. | Fire separations of exits permitted in buildings: (a) 30 min, up to 3 storeys in building height. (b) 45 min, in hotels up to 3 storeys in building height. (c) 45 min, up to 6 storeys in building height. (d) 1 h, over 6 storeys in building height. C49 | 3.4.4.4.(8) | Existing washrooms opening directly into an exit stairwell shall be separated from the exit stairwell by a 45 min closure. C50 | 3.4.5.1.(2) and (9) | Existing illuminated legible exit signs are acceptable. C51 | 3.4.6.1. | Existing acceptable. C52 | 3.4.6.2. | Existing acceptable, if visually apparent. C53 | 3.4.6.3.(1) | Existing acceptable with rise no greater than 3.7 m. C54 | 3.4.6.4.(1) to (3) | Existing acceptable. C55 | 3.4.6.4.(4) and (5) | Existing acceptable. C56 | 3.4.6.5.(3) to (13) | Existing acceptable. C57 | 3.4.6.6.(2) to (4) | Existing acceptable. C58 | 3.4.6.7.(1) | Existing acceptable. C59 | 3.4.6.8. | Existing acceptable. C60 | 3.4.6.9. | (a) Except for retirement homes, existing acceptable. (b) For retirement homes, existing acceptable provided there is no change in major occupancy or increase in occupant load greater than 15%. C61 | 3.4.6.10.(2) to (6) | Existing acceptable. C62 | 3.4.6.11.(1) to (3) | Existing acceptable. C63 | 3.4.6.12. | Existing acceptable in heritage buildings provided the occupant load is not more than 60. C64 | 3.4.6.16.(1) to (4) | Existing functionally operable panic hardware acceptable. C65 | 3.4.7.2. | Except for retirement homes, combustible fire escapes which are protected from fire in accordance with Sentence 3.2.3.13.(2) are permitted or may be reconstructed or recreated (as in the case of a heritage building). C66 | 3.5.1. | Existing acceptable except where building is classified under Subsection 3.2.6. C67 | 3.6.2.1.(7) | 45 min Fire separation acceptable. C68 | 3.6.2.2. | Existing acceptable where explosion-resistant construction or venting is provided. C69 | 3.6.2.6. | Existing acceptable. C70 | 3.6.2.7.(1) | 2 h Fire separation acceptable. C71 | 3.6.3.1.(1) to (5) | 45 min Fire separation acceptable up to 6 storeys. C72 | 3.6.3.3.(2) | Where 2 h Fire separation is required, 1 h is acceptable. Except for linen discharge rooms where 1 h Fire separation is required, 45 min is acceptable. C73 | 3.6.3.3.(4) and (5) | Existing sizes acceptable. C74 | 3.6.3.3.(9) | Where 2 h Fire separation is required, 1 h is acceptable. C75 | 3.6.4.2. | Except for retirement homes, ceiling Fire separation need not have a fire-resistance rating where sprinklering, subject to C.A. C27, of fire compartments on both sides of vertical Fire separation is provided and where such Fire separation is not required to exceed 1 h. C76 | 3.6.4.3.(1) | Existing to meet flame-spread rating of 25 or to be sprinklered. C77 | 3.6.4.4. to 3.6.4.6. | Existing access acceptable. C78 | 3.7.1.1.(2) | Minimum room height shall be not less than 1,950 mm over the required floor area and any location that would normally be used as a means of egress. C79 | 3.7.2.1. | (a) Where windows are not used as means of egress and where they do not conflict with ventilation requirements, the minimum glass areas as shown in Table 9.7.2.3. may be reduced by 50%. (b) An existing room converted to an interior room, created by an addition, shall not require a window, provided there is an opening in a dividing wall occupying not less than 30% of the separating plane to an adjoining room, where the adjoining room has a minimum of 5% window area of the combined floor areas, and provided the required ventilation for the combined room is maintained. C80 | 3.7.4. | Where the occupant load is increased by more than 15% above the capacity of the existing facilities, facilities to be added to accommodate the increase. C81 | 3.8.1.2. | Existing accessible entrance acceptable. (see C.A. C88) Existing curb ramp conforming to Sentence 3.8.3.2.(3) is acceptable. Existing principal entrance acceptable, provided at least one barrier-free entrance is available. C82 | 3.8.1.3.(1) | Existing unobstructed width of 920 mm minimum is acceptable. C83 | 3.8.1.3.(4) | Existing unobstructed space not less than 1,500 mm in width and 1,500 mm in length located not more than 30 m apart is acceptable. C84 | 3.8.3.2.(3)(b) | Existing curb ramp acceptable, provided width not less than 1,200 mm. C85 | 3.8.3.3.(1) | Existing doorway acceptable, provided not less than 800 mm wide. C86 | 3.8.3.3.(11)(a) | Existing distance acceptable, provided not less than 1,200 mm plus the width of any door that swings into the space in the path of travel. C87 | 3.8.3.4.(1)(a) | Existing ramp acceptable, provided not less than 870 mm between handrails. C88 | 3.8.3.8.(5) | Existing grab bar is acceptable. C89 | 3.8.3.12. | Existing universal washroom acceptable. C90 | 3.8.3.13.(2) (g) | Existing grab bar is acceptable. C91 | 3.8.3.16. | Existing drinking fountain conforming to Clauses 3.8.3.16.(2)(a) and (b) acceptable. C92 | 3.11.3.1.(9) | Existing clear width acceptable, provided not less than 900 mm. C93 | 3.11.3.1.(14) | Existing painted line acceptable. C94 | 4.1.8. | The requirements under this Subsection do not apply. C95 | 6.3.1.1.(2) | Required outdoor air rates may be provided by mechanical, natural or combination of natural and mechanical means. C96 | 6.3.2.3.; 6.3.2.6.; 6.3.2.6A.; 6.3.2.10. | Existing acceptable. C97 | 6.3.2.7.(1) | In a building containing not more than four dwelling units or residential suites, the existing heating or air-conditioning system may be altered to serve more than one dwelling unit or suite, provided smoke alarms are installed in each dwelling unit or suite and provided a smoke detector is installed in the supply or return air duct system serving the entire building which would turn off the fuel supply and electrical power to the heating system upon activation of such detector. C98 | 6.3.2.9. | Existing openings, grilles and diffusers acceptable. C99 | 6.3.3. | Existing acceptable, provided products of combustion are safely vented. C100 | 6.5.1.1. | Existing acceptable. C101 | 6.9.4.4.(1) | Carbon monoxide alarms may be battery operated or plugged into an electrical outlet. C102 | 8.2.1.4. | Existing clearances acceptable where a sewage system is replaced with another sewage system within the same class and the capacity of the replacement sewage system does not exceed the capacity of the existing sewage system. C103 | 8.2.1.4. | Existing clearances are acceptable where a replacement sewage system requires lesser clearances than those required in Part 8 for the existing sewage system. C104 | 9.3.2.1. | Sound used lumber may be acceptable for reuse without a grade stamp provided that: (a) Visual examination shows no excessive weakening by holes, notches, nail splits or other damage. (b) Where the grade or species is unknown, the minimum grade shall apply for span table use. (c) Lumber has not been subjected to termite infestation. C105 | 9.5.3.1. | Except for secondary suites, in a dwelling unit: (a) Minimum room height shall not be less than 1,950 mm over the required floor area and in any location that would normally be used as a means of egress. (b) Minimum room height shall not be less than 2,030 mm over at least 50% of the required floor area, provided that any part of the floor having a clear height of less than 1,400 mm shall not be considered in computing the required floor area. C106 | 9.5.11.1. | Doors may be lesser heights to suit ceiling heights. C107 | 9.5.11.2. | Existing acceptable, provided not less than 600 mm. C108 | 9.6.1.2.(2) and (3); 9.6.1.4.(1) and (2) | Existing doors and sidelights being reused or relocated need not conform if identified or protected. C109 | 9.6.1.4.(3) | Existing acceptable, if marked to indicate their existence and position. C110 | 9.7.2.3. | (a) Where windows are not used as a means of egress and where they do not conflict with ventilation requirements, the minimum glass areas as shown in Table 9.7.2.3. may be reduced by 50%. (b) An existing room converted to an interior room, created by an addition, shall not require a window, provided there is an opening in a dividing wall occupying not less than 30% of the separating plane to an adjoining room, where the adjoining room has a minimum of 5% window area of the combined floor areas, and provided the required ventilation for the combined room is maintained. C111 | 9.7.4. | Existing acceptable. C112 | 9.8.1. to 9.8.4. | Replacement or extension of existing stair systems shall be exempt from the provisions of these Subsections, except that they shall have: (a) A minimum width between wall faces of 700 mm. (b) A minimum clear height over tread nosing or landing of 1,800 mm. C113 | 9.8.4.3. and 9.8.4.7. | Existing curved or spiral stairs are acceptable. C114 | 9.8.4.5. | Where a stair complies with Subsection 9.8.4., an extension to a stair may contain two sets of winders provided that they are separated by at least three treads or a landing. C115 | 9.8.5.1.(2) | Existing ramps acceptable, where practical. C116 | 9.8.7. | Existing handrails acceptable, unless considered unsafe by chief building official. C117 | 9.8.8. | Existing guards acceptable, unless considered unsafe by chief building official. C118 | 9.8.9.6.(4) | Existing acceptable. C119 | 9.9.2.1.(1) to (2.1) | Except for hotels, the following types of exits may also be used: (a) Connected balconies, which connect across firewalls, or connect to another exit, or with access to grade. (b) Areas of refuge approved by the chief building official, where fire service rescue is possible. (c) Combustible or noncombustible exterior stairways or fire escapes which are protected in accordance with Sentence 3.2.3.13.(2). These may be reconstructed or recreated (as in the case of a heritage building). C120 | 9.9.2.1.(4) | Except for hotels, existing acceptable. C121 | 9.9.3.2. | (a) In a building containing not more than four dwelling units, the width of every exit facility may be as the existing, but not less than 800 mm. (b) In a building containing more than four dwelling units, the width of every exit facility may be as the existing, but not less than 900 mm. C122 | 9.9.3.3. | (a) In a building containing not more than four dwelling units, the minimum width of a public corridor may be 800 mm. (b) In a building containing more than four dwelling units, the minimum width of a public corridor may be 900 mm. C123 | 9.9.3.4. | Existing clear height of not less than 1,950 mm is acceptable. C124 | 9.9.4.2. | Except as permitted in C.A. C136, in a building containing not more than four dwelling units or suites, one exit need not be separated from the remainder of the building at the first storey where there are one or more other exits complying with C.A. C122. C125 | 9.9.4.2.(1) and (2) | 30 min Fire separation acceptable. C126 | 9.9.5.4. | Existing acceptable. C127 | 9.9.5.8. | Existing acceptable provided minimum 45 min Fire separation and where explosion-resistant construction or venting is provided. C128 | 9.9.5.9. | Existing acceptable, provided that the enclosure has a 45 min fire-resistance rating. C129 | 9.9.6.1. | Except for hotels, existing acceptable. C130 | 9.9.6.2. | Existing clear opening height of not less than 1,950 mm is acceptable. C131 | 9.9.6.3. | Existing door widths are acceptable, provided exit widths conform to C.A. C117. C132 | 9.9.6.5. | Existing door swings acceptable. Existing acceptable in public heritage buildings, where approved by chief building official. C133 | 9.9.6.6.(1) | Where exit doors open onto a landing, they shall not extend beyond the face of the first riser. C134 | 9.9.6.8. | Existing functionally operable passage or panic hardware acceptable. C135 | 9.9.7.4.(1)(a) | Maximum area of existing room or suite does not apply. C136 | 9.9.7.5. | Except as provided in C.A. C139, in a single dwelling unit or a house with a secondary suite, the Code requirement applies. C137 | 9.9.8.2.(1) | Existing travel distance acceptable where floor area is sprinklered and provided fire separations comply with Part 9. C138 | 9.9.8.5. | In a building containing not more than four dwelling units or suites, existing glazed solid wood doors to lobby may remain in lieu of new 20 minute doors, provided the Fire separations for the floor above or below are provided as per C.A. C154, and a second means of egress from the dwelling units complies with the Code requirements. C139 | 9.9.9 | In a single dwelling unit or a house with a secondary suite, exit requirements are acceptable if at least one of the following conditions exists: (a) A door, including a sliding door, that opens directly to the exterior from a dwelling unit, serves only that dwelling unit and has reasonable access to ground level, and the dwelling units are equipped with smoke alarms installed in conformance with Subsection 9.10.19. (b) An exit that is accessible to more than one dwelling unit and provides the only means of egress from each dwelling unit, provided that the means of egress is separated from the remainder of the building and common areas by a Fire separation having a 30 min fire-resistance rating and provided further that the required access to exit from any dwelling unit cannot be through another dwelling unit, service room or other occupancy, and both dwelling units and common areas are provided with smoke alarms that are installed in conformance with Subsection 9.10.19. and are interconnected. (c) Access to an exit from one dwelling unit which leads through another dwelling unit where: (i) An additional means of escape is provided through a window that conforms to the following: (A) The sill height is not more than 1,000 mm above or below adjacent ground level. (B) The window can be opened from the inside without the use of tools. (C) The window has an individual unobstructed open portion having a minimum area of 0.38 m² with no dimension less than 460 mm. (D) The sill height does not exceed 900 mm above the floor or fixed steps. (E) Where the window opens into a window well, a clearance of not less than 1,000 mm shall be provided in front of the window. (F) Smoke alarms are installed in every dwelling unit and in common areas in conformance with Subsection 9.10.19. and are interconnected. (ii) An additional means of escape is provided through a window that conforms to the following: (A) The window is a casement window not less than 1,060 mm high, 560 mm wide, with a sill height not more than 900 mm above the inside floor. (B) The sill height of the window is not more than 5 m above adjacent ground level. (C) Smoke alarms are installed in every dwelling unit and in common areas in conformance with Subsection 9.10.19. and are interconnected. (iii) The building is sprinklered and the dwelling units are equipped with smoke alarms installed in conformance with Subsection 9.10.19. C140 | 9.9.10.1. | In a single dwelling unit or a house with a secondary suite, existing acceptable, where there is direct access to the exterior. C141 | 9.9.11. | In a single dwelling unit or a house with a secondary suite, the requirements under this Subsection do not apply. C142 | 9.9.11.3. | Existing illuminated legible signs are acceptable for exit signs, if approved by chief building official. C143 | 9.9.12. | In a single dwelling unit or a house with a secondary suite, the requirements under this Subsection apply only where the condition described in (b) of C.A. C139 exists. C144 | 9.10.1.1. | Assemblies required to be of noncombustible construction may be supported by combustible construction having at least the same fire-resistance rating as that supported. C145 | 9.10.1.3.(8) to (10) | Existing installations acceptable subject to C.A. C26, C27 and C28. C146 | 9.10.3. | Fire-resistance ratings may also be used where they are based on: (1) HUD Rehabilitation Guidelines, "Guideline on Fire Ratings of Archaic Materials and Assemblies". (2) DBR Technical Paper No. 194, "Fire Endurance of Protected Steel Columns and Beams". (3) DBR Technical Paper No. 207, "Fire Endurance of Unit Masonry Walls". (4) DBR Technical Paper No. 222, "Fire Endurance of Light-Framed and Miscellaneous Assemblies". C147 | 9.10.5.1. | (a) Existing openings in existing wall or ceiling membranes to remain. (b) Existing openings may be moved to another location in the same wall or ceiling, provided the aggregate area of openings does not increase and are not cumulative, and the existing opening is blocked up to provide the same rating as the existing wall or ceiling assembly. C148 | 9.10.6.2. | Existing heavy timber construction acceptable where construction is within 90% of member sizes listed in Part 3. C149 | 9.10.7. | Existing acceptable for heritage buildings, subject to approval of chief building official. C150 | 9.10.8.1.; 9.10.8.3.; 9.10.8.8. | (a) Except as provided in (b) and (c), 30 min rating is acceptable. (b) In a house with a secondary suite, 15 min horizontal Fire separation is acceptable where: (i) Smoke alarms are installed in every dwelling unit and in common areas in conformance with Subsection 9.10.19. (ii) Smoke alarms are interconnected. (c) In a house with a secondary suite, the fire-resistance rating of the Fire separation is waived where the building is sprinklered throughout. C151 | 9.10.8.4. | Assemblies required to be of noncombustible construction may be supported by combustible construction having at least the same fire-resistance rating as that supported. C152 | 9.10.9.7.; 9.10.9.11. | Existing acceptable in existing Fire separations. C153 | 9.10.9.12.(1) | Ceiling Fire separation need not have a fire-resistance rating where sprinklering, subject to C.A. C27, of fire compartments on both sides of vertical Fire separation is provided and where such Fire separation is not required to exceed 1 h. C154 | 9.10.9.13.(1) | Except for hotels, 30 min Fire separation acceptable. C155 | 9.10.9.13.(2) | In lieu of the 2 h Fire separation, sprinklers may be used in the mercantile occupancy or medium-hazard industrial occupancy, with a 1 h Fire separation. C156 | 9.10.9.16.(1) and (3); 9.10.9.17.(1) | (a) Except as provided in (b) and (c), 30 min Fire separation is acceptable. (b) In a house with a secondary suite, 15 min horizontal Fire separation is acceptable where: (i) Smoke alarms are installed in every dwelling unit and in common areas in conformance with Subsection 9.10.19. (ii) Smoke alarms are interconnected. (c) In a house with a secondary suite, the fire-resistance rating of the Fire separation is waived where the building is sprinklered throughout. C157 | 9.10.10.3. | (a) Except as provided in (b) and (c) and in Articles 9.10.10.5. and 9.10.10.6., 30 min Fire separation is acceptable. (b) In a house with a secondary suite, the fire-resistance rating of the vertical Fire separation is waived where: (i) Smoke alarms are installed in every dwelling unit and in common areas in conformance with Subsection 9.10.19. (ii) Smoke alarms are interconnected. (c) In a house with a secondary suite, the fire-resistance rating of the vertical Fire separation is waived where service rooms are sprinklered. C158 | 9.10.11.2.(1) | In an individual dwelling unit or a house with a secondary suite, a party wall with 1 h fire-resistance rating is acceptable. C159 | 9.10.13.1 | Existing functional closures are acceptable subject to C.A. C8 and C160. C160 | 9.10.13.2.(1) | In an individual dwelling unit or a house with a secondary suite, existing unlabelled doors at least 45 mm solid core wood or metal clad are acceptable. For existing closures, ratings of 20 min will not be required where the entire floor area is sprinklered. C161 | 9.10.13.2.(1) | In a building containing not more than four dwelling units or suites, existing glazed solid wood doors to corridors may remain in lieu of new 20 min doors, provided they are not located in a dead-end corridor. C162 | 9.10.13.3. | Existing acceptable provided that wood door frames are secured with hinge screws going through frame into the stud. C163 | 9.10.13.5. | Existing wired glass acceptable. Existing transoms or sidelights located in required Fire separations may be retained if wired glass, at least 6 mm thick, is securely fixed to a wood frame of at least 50 mm thickness with steel stops. Operable transoms shall be fixed closed. C164 | 9.10.13.6. | Existing steel door frames acceptable. C165 | 9.10.13.7. | Existing glass block acceptable. C166 | 9.10.13.8. | Existing sizes acceptable. C167 | 9.10.13.9. | Existing operable latches acceptable. C168 | 9.10.13.10.(1) | Existing functionally operable self-closing devices acceptable. C169 | 9.10.13.11. | Existing operable self-releasing electromagnetic hold-open device acceptable, and except for hotels, fusible link hold-open devices acceptable. C170 | 9.10.13.12. | Existing swings acceptable. C171 | 9.10.13.13.(1) | Except as permitted in C.A. C172, in a building containing not more than four dwelling units, the existing heating or air-conditioning system may be altered to serve more than one dwelling unit, provided smoke alarms are installed in each dwelling unit and provided a smoke detector is installed in the supply or return air duct system serving the entire building which would turn off the fuel supply and electrical power to the heating system upon activation of such detector. C172 | 9.10.13.13.(1) | In detached houses, semi-detached houses, townhouses and row houses containing not more than two dwelling units, or houses with a secondary suite, existing acceptable. C173 | 9.10.13.14.; 9.10.5.1. | Except as permitted in C.A. C174, in a building containing not more than four dwelling units, the existing heating or air-conditioning system may be altered to serve more than one dwelling unit, provided smoke alarms are installed in each dwelling unit and provided a smoke detector is installed in the supply or return air duct system serving the entire building which would turn off the fuel supply and electrical power to the heating system upon activation of such detector. C174 | 9.10.13.14.; 9.10.5.1. | In an individual dwelling unit or a house with a secondary suite, existing acceptable. C175 | 9.10.14.2.(2) and (3); 9.10.14.4.(2); 9.10.15.2.(3) and (4); 9.10.15.4.(9) | Where an addition to an existing residential building has its exposing building face further distant from the line than the existing exposing building face and the limiting distance is at least 1,200 mm, the total area of allowable unprotected openings may be determined under Sentence 9.10.14.2.(2) or 9.10.15.2.(3) for the combined new and existing exposing building faces and: (a) Where the existing exposing building face has no unprotected openings, or the existing unprotected openings are to be filled in, the total allowable area of unprotected openings may be installed in the new exposing building face. (b) Where the existing unprotected openings are to remain: (i) Their area shall be deducted from the total allowable area of unprotected openings, and the balance may be installed in the new exposing building face. (ii) Sentences 9.10.14.2.(3) and 9.10.14.4.(2) or Sentences 9.10.15.2.(4) and 9.10.15.4.(9) apply only to the new exposing building face. C176 | 9.10.14.4.; 9.10.15.4. | Existing windows. (a) Existing windows in walls may be relocated to another part of the wall, provided the existing opening is blocked up to provide the same fire rating for the wall, and the projection of the new opening, at a right angle to the property line onto another building, lies no closer than 300 mm from a window in such other building, where the "opposite" window is less than 2,400 mm from the opposite new opening. (b) Except relocation of units, to be restricted to the same fire compartment and shall conform to the requirements of Article 3.2.3.14. or 9.10.12.3. where applicable. (c) Where a building does not satisfy the requirements of Subsection 3.2.3. for the amount of openings facing a yard or space that does not have sufficient limiting distance, such existing openings are allowed to be relocated provided: (i) Such openings are not increased in size and they are protected with wired glass in steel frames conforming to Sentence 3.1.8.16.(2). (ii) The building is sprinklered. C177 | 9.10.16.2.(1) | Where balloon framing is exposed during renovation, fire blocks shall be provided. C178 | 9.10.18. | (a) Subject to approval by the chief building official, existing fire alarm system may remain where the fire safety plan (as described in the Fire Code made under the Fire Protection and Prevention Act, 1997) for the building addresses the intent of Subsection 3.2.4. (i.e. "stage" system, electrical supervision, detection as required, Fire Department connection, and emergency power supply). (b) Extension of an existing system must ensure continuity and compatibility, and integrity of the system. C179 | 9.10.19.4. | Smoke alarms may be battery operated. C180 | 9.10.20. | Existing access acceptable. C181 | 9.11.1.1. | Where a house contains a secondary suite, each dwelling unit shall be separated from every other space in the house in which noise may be transmitted by: (a) Construction: (i) Whose joist spaces are filled with sound-absorbing material of not less than 150 mm nominal thickness. (ii) Whose stud spaces are filled with sound-absorbing material. (iii) Having a resilient channel on one side of the separation spaced 400 or 600 mm o.c. (iv) Having not less than 12.7 mm thick gypsum board on ceilings and on both sides of walls. (b) Construction providing an STC rating of not less than 43. (c) A separating assembly and adjoining constructions, which together provide an ASTC rating of not less than 40. C182 | 9.14.2.1.(1.1) | Existing acceptable. C183 | 9.18.2. | Existing access acceptable. C184 | 9.18.3. | Existing vents and ventilation acceptable. C185 | 9.19. | Existing acceptable. C186 | 9.20.2.2. | Used masonry may be reused for patching and filling openings to match adjacent work. Used interior brick may not be used for exterior applications. C187 | 9.20.3. | Archaic mortars may be used to match existing jointing. C188 | 9.20.4.1. | Sound jointing techniques may be employed to match existing archaic joints. C189 | 9.20.12.1. | Corbelling may be constructed to match existing or original details, provided that it is structurally adequate for the proposed use. C190 | 9.21. | Existing acceptable, provided the products of combustion are safely vented and provided no fire hazard is created. C191 | 9.22.1. to 9.22.7. | Sound period materials, designs and techniques may be employed in recreated fireplaces, provided no fire hazard is created. Existing need not comply with Article 9.22.1.4. C192 | 9.23. | Existing acceptable. C193 | 9.24. | Existing acceptable. C194 | 9.25. | A vapour barrier may consist of paint or other coating with specified perm rating such as two coats of leafing aluminum pigmented paint. C195 | 9.26. | Existing acceptable, except when removing and replacing shingles, comply with the eave protection requirements of Subsection 9.26.5. C196 | 9.27. | Existing acceptable. C197 | 9.28. | All replacement or recreation of existing stucco may be compatible with the existing materials and application. C198 | 9.29.4. | Existing acceptable. All replacement or recreation of existing plaster may be compatible with the existing materials and application. C199 | 9.32. | In an individual dwelling unit or a house with a secondary suite, rooms or spaces shall be ventilated by natural means in accordance with Subsection 9.32.2. or by providing adequate mechanical ventilation. C200 | 9.32.3.9C. | Carbon monoxide alarms may be battery operated or plugged into an electrical outlet. C201 | 9.33.1.1. | In a building containing not more than four dwelling units, the existing heating or air-conditioning system may be altered to serve more than one dwelling unit, provided smoke alarms are installed in each dwelling unit and provided a smoke detector is installed in the supply or return air duct system serving the entire building which would turn off the fuel supply and electrical power to the heating system upon activation of such detector. C202 | 9.33.5.3. | Sound, used or antique appliances are acceptable, provided that: (a) Visual examination shows no excessive weakening by corrosion or other damage. (b) No structural parts are missing. (c) No cracks are present in the components intended to support the appliance or enclose the fire. (d) Loading and ash removal door latches and hinges hold the door closed. C203 | 9.33.6.5.(1); 9.33.6.6.(1) to (3), (5), (11) and (12) | Existing acceptable. C204 | 9.33.6.6.(8) | Where the duct system is being altered, lesser amounts and extent of insulation will be permitted. C205 | 9.33.6.13.(7.1) | In a building containing not more than four dwelling units or residential suites, the existing heating or air-conditioning system may be altered to serve more than one dwelling unit or suite, provided smoke alarms are installed in each dwelling unit or suite and provided a smoke detector is installed in the supply or return air duct system serving the entire building which would turn off the fuel supply and electrical power to the heating system upon activation of such detector. C206 | 9.38. | Sound used materials shall be acceptable for reuse, subject to the following limitations: (a) Visual examination shows no excessive weakening by holes, notches, nail splits or other damage. (b) Logs have not been subjected to termite infestation. C207 | 12.2.1.2.(3) | (a) Where the framing systems are being altered to match the existing framing, lesser amounts and extent of insulation and vapour barrier is acceptable. (b) Existing acceptable for Article 2.1.1.9. of MMA Supplementary Standard SB-12, "Energy Efficiency for Housing". (c) Existing previously occupied log houses that are dismantled and reconstructed are exempt from Article 3.1.1.6. of MMA Supplementary Standard SB-12, "Energy Efficiency for Housing".

    Open OBC Div. B Table 11.5.1.1-C. in the code viewer
  • OBC Div. C 1.2.1.2. Design by Architect or Professional Engineer

    (1)A foundation of a building shall be designed by a professional engineer where,

    (a)the foundation is to be constructed below the level of the footings of an adjacent building and within the angle of repose of the soil, as drawn from the bottom of the footings, or

    (b)underpinning of a foundation is to be undertaken.

    (2)A sprinkler protected glazed wall assembly described in Article 3.1.8.20. of Division B shall be designed by a professional engineer.

    (3)A shelf and rack storage system described in Section 3.16. of Division B shall be designed by a professional engineer.

    (4)The time-based egress analysis for a shelf and rack storage system described in Sentence 3.16.1.7.(7) of Division B shall be prepared or provided by an architect or a professional engineer or a combination of both.

    (5)The supporting framing structure and anchorage system for a tent occupying an area greater than 225 m² shall be designed by a professional engineer.

    (6)A sign structure attached in any manner to a building shall be designed by an architect or a professional engineer or a combination of both where it is,

    (a)a projecting sign that weighs more than 115 kg, or

    (b)a roof sign that has any face that is more than 10 m².

    (7)A projecting sign attached in any manner to a parapet wall shall be designed by an architect or a professional engineer or a combination of both.

    Open OBC Div. C 1.2.1.2. in the code viewer
  • OBC Div. C 1.2.1.1. Application

    (1)Article 1.2.1.2. applies with respect to a building described in clause 11(3)(a) or (b) of the Architects Act or subsection 12(4) or clause 12(5)(a) of the Professional Engineers Act.

    Open OBC Div. C 1.2.1.1. in the code viewer
  • OBC Div. C Table 1.2.2.1. General Review — Forming Part of Sentence 1.2.2.1.(1)

    Table 1.2.2.1. General Review — Forming Part of Sentence 1.2.2.1.(1) Forming Part of Sentence 1.2.2.1.(1) Building Classification by Major Occupancy[5] | Building Description | General Review by: Assembly occupancy only | Every building | Architect and professional engineer[1] Assembly occupancy and any other major occupancy except industrial | Every building | Architect and professional engineer[1] Care, care and treatment or detention occupancy only | Every building | Architect and professional engineer[1] Care, care and treatment or detention occupancy and any other major occupancy except industrial | Every building | Architect and professional engineer[1] Residential occupancy only, other than retirement homes | Every building that exceeds 3 storeys in building height | Architect and professional engineer[1] Residential occupancy only, other than retirement homes | Every building that exceeds 600 m² in gross area and that contains a residential occupancy other than a dwelling unit or dwelling units | Architect[2] Residential occupancy only, other than retirement homes | Every building that exceeds 600 m² in gross area and contains a dwelling unit above another dwelling unit | Architect[2] Residential occupancy only, other than retirement homes | Every building that exceeds 600 m² in building area, contains 3 or more dwelling units and has no dwelling unit above another dwelling unit | Architect[2] Residential occupancy, other than retirement homes, and any other major occupancy except assembly, care, care and treatment, detention or industrial occupancy | Every building that exceeds 600 m² in gross area or 3 storeys in building height | Architect and professional engineer[1] Retirement home only | Every building | Architect and professional engineer[1] Retirement home and any major occupancy except industrial | Every building | Architect and professional engineer[1] Business and personal services occupancy only | Every building that exceeds 600 m² in gross area or 3 storeys in building height | Architect and professional engineer[1] Business and personal services occupancy and any other major occupancy except assembly, care, care and treatment, detention or industrial occupancy | Every building that exceeds 600 m² in gross area or 3 storeys in building height | Architect and professional engineer[1] Mercantile occupancy only | Every building that exceeds 600 m² in gross area or 3 storeys in building height | Architect and professional engineer[1] Mercantile occupancy and any other major occupancy except assembly, care, care and treatment, detention or industrial occupancy | Every building that exceeds 600 m² in gross area or 3 storeys in building height | Architect and professional engineer[1] Industrial occupancy only and where there are no subsidiary occupancies | Every building that exceeds 600 m² in gross area or 3 storeys in building height | Architect or professional engineer[3] Industrial occupancy and one or more other major occupancies where the portion of the area occupied by one of the other major or subsidiary occupancies exceeds 600 m² | The non-industrial portion of every building | Architect and professional engineer[1] Industrial occupancy and one or more other major occupancies where the portion of the area occupied by one of the other major or subsidiary occupancies exceeds 600 m² | The industrial portion of every building | Architect or professional engineer[3] Industrial occupancy and one or more other major occupancies where no portion of the area occupied by one of the other major or subsidiary occupancies exceeds 600 m² | Every building that exceeds 600 m² in gross area or 3 storeys in building height | Architect or professional engineer[3] Agricultural occupancy only and where there are no subsidiary occupancies | Every building that exceeds 600 m² in gross area or 3 storeys in building height | Architect or professional engineer[3] Agricultural occupancy and one or more other major occupancies where the portion of the area occupied by one of the other major or subsidiary occupancies exceeds 600 m² | The non-agricultural portion of every building | Architect and professional engineer[1] Agricultural occupancy and one or more other major occupancies where the portion of the area occupied by one of the other major or subsidiary occupancies exceeds 600 m² | The agricultural portion of every building | Architect or professional engineer[3] Agricultural occupancy and one or more other major occupancies where no portion of the area occupied by one of the other major or subsidiary occupancies exceeds 600 m² | Every building that exceeds 600 m² in gross area or 3 storeys in building height | Architect or professional engineer[3] Column 1 | Column 2 | Column 3 Notes to Table 1.2.2.1.: (1) An architect shall provide general review services within the practice of architecture and a professional engineer shall provide general review services within the practice of professional engineering. (2) An architect may engage a professional engineer to provide general review services within the practice of professional engineering. (3) Only a professional engineer may provide general review services within the practice of professional engineering. (4) Requirements for general review by an architect or a professional engineer or a combination of both for the construction, including, for greater certainty, enlargement or alteration, of a building are set out in the Architects Act and the Professional Engineers Act. (5) For purposes of Table 1.2.2.1., a retirement home is deemed to be a separate major occupancy.

    Open OBC Div. C Table 1.2.2.1. in the code viewer
  • OBC Div. C 1.2.2.1. General Review by Architect or Professional Engineer

    (1)The construction, including, for greater certainty, enlargement or alteration, of every building or part of it described in Table 1.2.2.1. shall be reviewed by an architect or a professional engineer or a combination of both as set out in Column 3 of the Table.

    (2)A person who intends to construct or have constructed a building or part of it required by Sentences (1) and (4) to (9) to be reviewed by an architect or a professional engineer or a combination of both, shall ensure that an architect, professional engineer or both are retained to undertake the general review of the construction of the building in accordance with the performance standards of the Ontario Association of Architects or the Association of Professional Engineers of Ontario, as applicable, to determine whether the construction is in general conformity with the plans, sketches, drawings, graphic representations, specifications and other documents that form the basis for the issuance of a permit under section 8 of the Act or any changes to it authorized by the chief building official.

    (3)The architect, professional engineer or both who have been retained to undertake the general review of the construction of a building, shall forward copies of written reports arising out of the general review to the chief building official or registered code agency, as the case may be.

    (4)The construction of a foundation of a building shall be reviewed by a professional engineer where,

    (a)the foundation is to be constructed below the level of the footings of an adjacent building and within the angle of repose of the soil, as drawn from the bottom of the footings, or

    (b)underpinning of a foundation is to be undertaken.

    (5)The construction of a sprinkler protected glazed wall assembly described in Article 3.1.8.20. of Division B shall be reviewed by a professional engineer.

    (6)The construction of a shelf and rack storage system described in Section 3.16. of Division B shall be reviewed by a professional engineer.

    (7)The construction of a supporting framing structure and anchorage system for a tent occupying an area greater than 225 m² shall be reviewed by a professional engineer.

    (8)The construction of a sign structure shall be reviewed by an architect or a professional engineer or a combination of both, where the sign is,

    (a)a ground sign that exceeds 7.5 m in height above the adjacent finished ground,

    (b)a projecting sign that weighs more than 115 kg, or

    (c)a roof sign that has any face that is more than 10 m².

    (9)The construction of a projecting sign attached in any manner to a parapet wall shall be reviewed by an architect, professional engineer or a combination of both.

    (10)The construction of a demountable stage or demountable support structure regulated by Section 3.17. of Division B shall be reviewed by a professional engineer.

    Open OBC Div. C 1.2.2.1. in the code viewer
  • OBC Div. C 1.2.2.2. Restriction for General Review

    (1)Only an architect may carry out or provide the general review of the construction of a building,

    (a)that is constructed in accordance with a design prepared or provided by an architect, or

    (b)in relation to services that are provided by an architect in connection with the design in accordance with which the building is constructed.

    (2)Only a professional engineer may carry out or provide the general review of the construction of a building,

    (a)that is constructed in accordance with a design prepared or provided by a professional engineer, or

    (b)in relation to services that are provided by a professional engineer in connection with the design in accordance with which the building is constructed.

    Open OBC Div. C 1.2.2.2. in the code viewer
  • OBC Div. C 1.3.1.1. Requirement for Permits

    (1)A person is exempt from the requirement to obtain a permit under section 8 of the Act,

    (a)for the demolition of a farm building located on a farm,

    (b)subject to Sentence (2), for the construction or demolition of a building in territory without municipal organization, or

    (c)for the construction of a Class 1 sewage system.

    (2)The exemption in Clause (1)(b) from the requirement to obtain a permit does not apply to the construction of a sewage system in territory without municipal organization.

    (3)The application for a permit respecting the demolition of a building to which Sentence 1.2.2.3.(1) applies shall include descriptions of the structural design characteristics of the building and the method of demolition of the building.

    (4)No person shall commence demolition of a building or any part of a building before the building has been vacated by the occupants except where the safety of the occupants is not affected.

    (5)A tent or group of tents is exempt from the requirement to obtain a permit under section 8 of the Act and is exempt from compliance with the Code provided that the tent or group of tents are,

    (a)not more than 60 m² in aggregate ground area,

    (b)not attached to a building, and

    (c)constructed more than 3 m from other structures.

    (6)A shed is exempt from the requirement to obtain a permit under section 8 of the Act and is exempt from compliance with this Code, provided that the shed,

    (a)is not more than 15 m² in gross area,

    (b)is not more than one storey in building height,

    (c)is not attached to a building or any other structure,

    (d)is used only for storage purposes ancillary to a principal building on the lot, and

    (e)does not have plumbing.

    (7)A demountable stage or demountable support structure not regulated by Section 3.17. of Division B is exempt from the requirement to obtain a permit under section 8 of the Act and is exempt from compliance with this Code.

    Open OBC Div. C 1.3.1.1. in the code viewer
Show all 17 articles
  • OBC Div. C 1.3.5.1. Prescribed Notices

    (1)This Article sets out the notices that are required under section 10.2 of the Act.

    (2)The person to whom a permit under section 8 of the Act is issued shall notify the chief building official or, where a registered code agency is appointed under the Act in respect of the construction to which the notice relates, the registered code agency of,

    (a)readiness to construct footings,

    (b)substantial completion of footings and foundations prior to commencement of backfilling,

    (c)substantial completion of structural framing and ductwork and piping for heating and air-conditioning systems, if the building is within the scope of Part 9 of Division B,

    (d)substantial completion of structural framing and roughing-in of heating, ventilation, air-conditioning and air-contaminant extraction equipment, if the building is not a building to which Clause (c) applies,

    (e)substantial completion of insulation and vapour barriers,

    (f)substantial completion of air barrier systems,

    (g)substantial completion of all required fire separations and closures and all fire protection systems including standpipe, sprinkler, fire alarm and emergency lighting systems,

    (h)substantial completion of fire access routes,

    (i)readiness for inspection and testing of,

    (i)building sewers and building drains,

    (ii)water service pipes,

    (iii)fire service mains,

    (iv)drainage systems and venting systems,

    (v)the water distribution system, and

    (vi)plumbing fixtures and plumbing appliances,

    (j)readiness for inspection of suction and gravity outlets, covers and suction piping serving outlets of an outdoor pool described in Clause 1.3.1.1.(1)(j) of Division A, a public pool or a public spa,

    (k)substantial completion of the circulation / recirculation system of an outdoor pool described in Clause 1.3.1.1.(1)(j) of Division A, a public pool or public spa and substantial completion of the pool before it is first filled with water,

    (l)readiness to construct the sewage system,

    (m)substantial completion of the installation of the sewage system before the commencement of backfilling,

    (n)substantial completion of installation of plumbing not located in a structure, before the commencement of backfilling,

    (o)completion of construction and installation of components required to permit the issue of an occupancy permit under Sentence 1.3.3.1.(3) or to permit occupancy under Sentence 1.3.3.2.(1), if the building or part of the building to be occupied is not fully completed, and

    (p)completion of construction and installation of components required to permit the issue of an occupancy permit under Sentence 1.3.3.4.(4), 1.3.3.5.(3) or 1.3.3.7.(8).

    (q)completion of construction and installation of components required to permit the issue of an occupancy permit under Sentence 1.3.3.8.(2).

    Open OBC Div. C 1.3.5.1. in the code viewer
  • OBC Div. C 1.3.5.2. Additional Notices

    (1)A by-law, resolution or regulation made by a principal authority under clause 7(1)(e) of the Act may require that notice of one or more of the following stages of construction be given by the person to whom a permit is issued under section 8 of the Act:

    (a)commencement of construction of the building,

    (b)substantial completion of structural framing for each storey, if the building is a type of building that is within the scope of Division B, other than Part 9,

    (c)commencement of construction of,

    (i)masonry fireplaces and masonry chimneys,

    (ii)factory-built fireplaces and allied chimneys, or

    (iii)stoves, ranges, space heaters and add-on furnaces using solid fuels and allied chimneys,

    (d)substantial completion of interior finishes,

    (e)substantial completion of heating, ventilating, air-conditioning and air-contaminant extraction equipment,

    (f)substantial completion of exterior cladding,

    (g)substantial completion of site grading,

    (h)substantial completion of the pool deck and dressing rooms for a public pool or public spa and readiness for inspection of the emergency stop system for a public pool or public spa,

    (i)completion and availability of drawings of the building as constructed, and

    (j)completion of a building for which an occupancy permit is required under Article 1.3.3.4., 1.3.3.5. or 1.3.3.7. or 1.3.3.8.

    Open OBC Div. C 1.3.5.2. in the code viewer
  • OBC Div. C 1.3.3.4. Occupancy Permit — Certain Buildings of Residential Occupancy

    (1)No person shall occupy or permit to be occupied a building described in Sentence (3), or part of it, unless the chief building official or a person designated by the chief building official has issued a permit authorizing occupation of the building or part of it in accordance with Sentence (4).

    (2)This Article does not apply in respect of the occupancy of:

    (a)an existing building, or part of it, that has been subject to extension or material alteration or repair, or

    (b)a building or part of it to which Article 1.3.3.8. applies.

    (3)A building referred to in Sentence (1) is a building intended for residential occupancy that,

    (a)is of three or fewer storeys in building height and has a building area not exceeding 600 m²,

    (b)has no accommodation for tourists,

    (c)does not have a dwelling unit above another dwelling unit,

    (d)does not have any dwelling units sharing a common means of egress, and

    (e)does not contain a retirement home.

    (4)The chief building official or a person designated by the chief building official shall issue a permit authorizing occupation of a building described in Sentence (3), where,

    (a)the structure of the building with respect to the dwelling unit to be occupied is substantially complete and ready to be used for its intended purpose,

    (b)the building envelope, including, but not limited to, cladding, roofing, windows, doors, assemblies requiring fire-resistance ratings, closures, insulation, vapour barriers and air barriers, with respect to the dwelling unit to be occupied, is substantially complete,

    (c)the walls enclosing the dwelling unit to be occupied conform to Sentence 9.25.2.3.(7) of Division B,

    (d)required electrical supply is provided for the dwelling unit to be occupied,

    (e)required firefighting access routes to the building have been provided and are accessible,

    (f)the following building components and systems are complete and operational for the dwelling unit to be occupied:

    (i)required exits, floor access and egress systems, handrails, guards, smoke alarms, carbon monoxide alarms and fire separations, including, but not limited to, fire stops,

    (ii)required exhaust fume barriers and self-closing devices on doors between an attached or built-in garage and the dwelling unit,

    (iii)water supply, sewage disposal, lighting and heating systems, and

    (iv)protection of foamed plastics required by Article 9.10.17.10. of Division B,

    (g)the following building components and systems are complete, operational and tested for the dwelling unit to be occupied:

    (i)water system,

    (ii)building drain and building sewer, and

    (iii)drainage system and venting system,

    (h)required plumbing fixtures in the dwelling unit to be occupied are substantially complete and operational, and

    (i)where applicable, the building conforms to Article 9.1.1.7. of Division B with respect to the dwelling unit to be occupied.

    (5)Where a registered code agency has been appointed to perform the functions described in clause 4.1(4)(b) or (c) of the Act in respect of the construction of a building described in Sentence (3), the chief building official or a person designated by the chief building official shall issue the permit referred to in Sentence (4) after receipt of a certificate for the occupancy of a building described in Sentence 1.3.3.4.(3) of Division C issued by the registered code agency in respect of the building.

    (6)Where applicable, the chief building official or a person designated by the chief building official shall not issue a permit authorizing occupation of the building or part of it, unless compliance with section 168.3.1 of the Environmental Protection Act has been achieved.

    Open OBC Div. C 1.3.3.4. in the code viewer
  • OBC Div. A 1.4.1.2. Defined Terms

    (1)The words and terms in italics in this Code shall have the following meanings:

    (a)the same meaning as in subsection 1(1) of the Act, if not defined in Clause (b) or (c),

    (b)the same meaning as in each of the following provisions for the purposes described in the provision:

    (i)Sentences 1.4.1.3.(1) and (2) of Division A, and

    (ii)Sentences 3.13.1.2.(1), 7.1.1A.1.(1), 8.1.1.2.(1) and 11.1.1.2.(1) of Division B, or

    (c)the following meaning for the purposes of this Code:

    Absorption trench means an excavation in soil, as defined in Part 8 of Division B, or in leaching bed fill, being part of a leaching bed, in which a distribution pipe or leaching chamber is laid that allows infiltration of the effluent into the soil, as defined in Part 8 of Division B, or leaching bed fill.

    Acceptable solution means a requirement stated in Parts 2 to 12 of Division B.

    Accessible means, when applied to a fixture, connection, plumbing appliance, valve, cleanout or equipment, to be accessible with or without having to first remove an access panel, door or similar obstruction, but a fixture, connection, plumbing appliance, valve, cleanout or equipment is not accessible if access can be gained only by cutting or breaking materials.

    Access to exit means that part of a means of egress within a floor area that provides access to an exit serving the floor area.

    Adaptable seating means a fixed seat or seats designed to facilitate a side transfer from a wheelchair. (See Note A-1.4.1.2.(1))

    Additional circuit vent means a vent pipe that is installed between a circuit vent and a relief vent to provide additional air circulation.

    Adfreezing means the adhesion of soil to a foundation unit resulting from the freezing of soil water. (Also referred to as "frost grip.")

    Agricultural occupancy (Group G) means the occupancy of a building or part thereof that is located on land that is associated with and devoted to the practice of farming, and is used for the purpose of producing crops, raising farm animals, or preparing, marketing, storing or processing agricultural products. (See Note A-1.4.1.2.(1))

    Agricultural occupancy with no human occupants (Group G, Division 4) means an agricultural occupancy that is not intended to be occupied by persons under normal use and is generally used for the storage of agricultural materials and by-products. (See Note A-1.4.1.2.(1))

    Air admittance valve means a one-way valve designed to allow air to enter the drainage system when the pressure in the plumbing system is less than the atmospheric pressure.

    Air barrier system means the assembly installed to provide a continuous barrier to the movement of air.

    Air break means the unobstructed vertical distance between the lowest point of an indirectly connected waste pipe and the flood level rim of the fixture into which it discharges.

    Air-conditioning means the process of treating air in a space to control simultaneously its temperature, humidity, cleanliness, and distribution to meet the comfort requirements of the occupants of the space.

    Air gap means the unobstructed vertical distance through air between the lowest point of a water supply outlet and the flood level rim of the fixture or device into which the outlet discharges.

    Air-supported structure means a structure consisting of a pliable membrane that achieves and maintains its shape and support by internal air pressure.

    Alarm signal means an audible signal transmitted throughout a zone or zones or throughout a building to advise occupants that a fire emergency exists.

    Alert signal means an audible signal to advise designated persons of a fire emergency.

    Allowable bearing pressure means the maximum pressure that may be safely applied to a soil or rock by the foundation unit considered in design under expected loading and subsurface conditions.

    Allowable load means the maximum load that may be safely applied to a foundation unit considered in design under expected loading and subsurface conditions.

    Alloyed zinc means an alloy of zinc having the corrosion resistance and physical properties of an alloy containing 0.15% titanium, 0.74% copper and 99.11% zinc, and so tempered as to be capable of being formed into the shape required for a watertight joint.

    Alternative solution means a substitute for an acceptable solution.

    Apparent sound transmission class (ASTC) means a single number rating of the airborne sound attenuation of building assemblies separating two adjoining spaces, taking into account both the direct and flanking sound transmission paths. (See Note A-1.4.1.2.(1)) (See also Note A-9.11. of Division B)

    Appliance means a device to convert fuel into energy and includes all components, controls, wiring and piping required to be part of the device by the applicable standard referred to in this Code.

    Architect means the holder of a licence, a certificate of practice or a temporary licence under the Architects Act.

    Area affected by a significant drinking water threat means an area described in Clause 1.10.2.3.(2)(b) of Division C.

    Artesian groundwater means a confined body of water under pressure in the ground.

    As constructed plans means construction plans and specifications that show the building and the location of the building on the property as the building has been constructed.

    Assembly occupancy (Group A) means the occupancy or the use of a building or part thereof by a gathering of persons for civic, political, travel, religious, social, educational, recreational or like purposes, or for the consumption of food or drink.

    Attic or roof space means the space between the roof and the ceiling of the top storey or between a dwarf wall and a sloping roof.

    auxiliary water supply means, when applied to premises, any water supply on or available to the premises other than the primary potable water supply for the premises.

    Backflow means a flowing back or reversal of the normal direction of the flow.

    Backflow preventer means a device or a method that prevents backflow in a water distribution system.

    Back pressure means pressure higher than the supply pressure.

    Back-siphonage means backflow caused by a negative pressure in the supply system.

    Back-siphonage preventer means a device or a method that prevents back-siphonage in a water distribution system.

    Back vent means a pipe that is installed to vent a trap off the horizontal section of a fixture drain or the vertical leg of a water closet or other fixture that has an integral siphonic flushing action and "back vented" has a corresponding meaning.

    Backwater valve means a check valve designed for use in a gravity drainage system.

    Barrier-free means, when applied to a building and its facilities, that the building and its facilities can be approached, entered and used by persons with physical or sensory disabilities.

    Basement means a storey or storeys of a building located below the first storey.

    Bathroom group means a group of plumbing fixtures installed in the same room, consisting of one domestic-type lavatory, one water closet and either one bathtub, with or without a shower, or one one-headed shower.

    Bearing surface means the contact surface between a foundation unit and the soil or rock upon which it bears.

    Boarding, lodging or rooming house means a building

    (a) that has a building height not exceeding three storeys and a building area not exceeding 600 m²,

    (b) in which lodging is provided for more than four persons in return for remuneration or for the provision of services or for both, and

    (c) in which the lodging rooms do not have both bathrooms and kitchen facilities for the exclusive use of individual occupants.

    Boiler means an appliance intended to supply hot water or steam for space heating, processing or power purposes.

    Bottle trap means a trap that retains water in a closed chamber and that seals the water by submerging the inlet pipe in the liquids or by a partition submerged in the liquids.

    Braced wall band means an imaginary continuous straight band extending vertically and horizontally through the building or part of the building, within which braced wall panels are constructed.

    Braced wall panel means a portion of a wood-frame wall where bracing, sheathing, cladding or interior finish is designed and installed to provide the required resistance to lateral loads due to wind or earthquake.

    Branch means a sanitary drainage pipe that is connected at its upstream end to the junction of two or more sanitary drainage pipes or to a stack connected at its downstream end to another branch, a sump, a stack or a building drain.

    Branch vent means a vent pipe that is connected at its lower end to the junction of two or more vent pipes and at its upper end either to another branch vent, or to a stack vent, vent stack or vent header, or terminates in open air.

    Breeching means a flue pipe or chamber for receiving flue gases from one or more flue connections and for discharging these gases through a single flue connection.

    Building area means the greatest horizontal area of a building above grade within the outside surface of exterior walls or within the outside surface of exterior walls and the centre line of firewalls.

    Building Code website means the website at www.ontario.ca/buildingcode.

    Building control valve means the valve on a water system that controls the flow of potable water from the water service pipe to the water distribution system.

    Building drain means the lowest horizontal piping, including any vertical offset, that conducts sewage, clear water waste or storm water by gravity to a building sewer.

    Building height (in storeys) means the number of storeys contained between the roof and the floor of the first storey.

    Building sewer means a pipe that is connected to a building drain 1 m outside a wall of a building and that leads to a public sewer or private sewage disposal system.

    Building trap means a trap that is installed in a building drain or sanitary building sewer to prevent the circulation of air between the sanitary drainage system and a public sewer.

    Business and personal services occupancy (Group D) means the occupancy or use of a building or part thereof for the transaction of business or the provision of professional or personal services.

    Caisson (see Pile).

    Camp for housing of workers means a camp in which buildings or other structures or premises are used to accommodate five or more employees.

    Campground means land or premises used as an overnight camping facility that is not a recreational camp.

    Canopy means a roof-like structure projecting more than 300 mm from the exterior face of the building.

    Carbon dioxide equivalent means a measure used to compare the impact of various greenhouse gases based on their global warming potential.

    Carbon monoxide alarm means a carbon monoxide detection device with an integral audible alarm device designed to sound an alarm within the room, suite or space in which it is located when the concentration of airborne carbon monoxide exceeds a pre-determined level and duration.

    Care and treatment occupancy (Group B, Division 2) means an occupancy in which persons receive special care and treatment.

    Care occupancy (Group B, Division 3) means an occupancy, other than a retirement home, in which special care is provided by a facility, directly through its staff or indirectly through another provider, to residents of the facility

    (a) who require special care because of cognitive or physical limitations, and

    (b) who, as a result of those limitations, would be incapable of evacuating the occupancy, if necessary, without the assistance of another person.

    Cavity wall means a construction of masonry units laid with a cavity between the wythes. The wythes are tied together with metal ties or bonding units, and are relied on to act together in resisting lateral loads.

    Certificate for the occupancy of a building described in Sentence 1.3.3.4.(3) of Division C means a certificate described in Sentence 3.7.4.3.(6) of Division C.

    Certificate for the occupancy of a building described in Sentence 1.3.3.5.(1) of Division C means a certificate described in Sentence 3.7.4.3.(7) of Division C.

    Certificate for the occupancy of a building not fully completed means a certificate described in Sentence 3.7.4.3.(5) of Division C.

    Chamber means a structure in a shallow buried trench that is constructed with an open bottom and that contains a pressurized distribution pipe.

    Check valve means a valve that permits flow in only one direction and prevents a return flow.

    Child care centre means a child care centre as defined in subsection 2 (1) of the Child Care and Early Years Act, 2014.

    Chimney means a primarily vertical shaft enclosing at least one flue for conducting flue gases to the outdoors.

    Chimney liner means a conduit containing a chimney flue used as a lining of a masonry or concrete chimney.

    Circuit vent means a vent pipe that serves a number of fixtures and connects to the fixture drain of the most upstream fixture, and "circuit vented" has a corresponding meaning.

    Class 1 fire sprinkler/standpipe system means an assembly of pipes and fittings that conveys water from the water service pipe or fire service main to the sprinkler/standpipe system's outlets, is directly connected to the public water supply main only, has no pumps or reservoirs and in which the sprinkler drains discharge to the atmosphere, to dry wells or to other safe outlets.

    Class 2 fire sprinkler/standpipe system means a Class 1 fire sprinkler/standpipe system that includes a booster pump in its connection to the public water supply main.

    Class 3 fire sprinkler/standpipe system means an assembly of pipes and fittings that conveys potable water from the water service pipe or fire service main to the sprinkler/standpipe system's outlets and that is directly connected to the public water supply main as well as to one or more of the following storage facilities, which are filled from the public water supply main only: elevated water storage, fire pumps supplying water from aboveground covered reservoirs or pressure tanks. The water in this sprinkler/standpipe system must be maintained in potable condition.

    Class 4 fire sprinkler/standpipe system means an assembly of pipes and fittings that conveys water from the water service pipe or fire service main to the sprinkler/standpipe system's outlets and is directly connected to the public water supply main (similar to Class 1 and Class 2 fire sprinkler/standpipe systems) and to an auxiliary water supply dedicated to fire department use that is located within 520 m of a pumper connection.

    Class 5 fire sprinkler/standpipe system means an assembly of pipes and fittings that conveys water from the water service pipe or fire service main to the sprinkler/standpipe system's outlets, is directly connected to the public water supply main and also interconnected with an auxiliary water supply.

    Class 6 fire sprinkler/standpipe system means an assembly of pipes and fittings that conveys water from the water service pipe or fire service main to the sprinkler/standpipe system's outlets and acts as a combined industrial water supply and fire protection system that is supplied from the public water supply main only, with or without gravity storage or pump suction tanks.

    Cleanout means a fitting access in a drainage system or venting system that is installed to provide access for cleaning and inspection and that is provided with a readily replaceable air tight cover.

    Clean water means water that has passed through a recirculation system.

    Clear-water waste means waste water with impurity levels that will not be harmful to health and may include cooling water and condensate drainage from refrigeration and air-conditioning equipment and cooled condensate from steam heating systems, but does not include storm water.

    Closed container means a container so sealed by means of a lid or other device that neither liquid nor vapour will escape from it at ordinary temperatures.

    Closure means a device or assembly for closing an opening through a fire separation or an exterior wall, such as a door, a shutter, a damper, wired glass or glass block, and includes all components such as hardware, closing devices, frames and anchors.

    Combustible means that a material fails to meet the acceptance criteria of CAN/ULC-S114, "Standard Method of Test for Determination of Non-Combustibility in Building Materials."

    Combustible construction means that type of construction that does not meet the requirements for noncombustible construction or encapsulated mass timber construction.

    Combustible dusts means dusts and particles that are ignitable and liable to produce an explosion.

    Combustible fibres means finely divided, combustible vegetable or animal fibres and thin sheets or flakes of such materials which, in a loose, unbaled condition, present a flash fire hazard, including cotton, wool, hemp, sisal, jute, kapok, paper and cloth.

    Combustible liquid means a liquid having a flash point at or above 37.8°C and below 93.3°C.

    Compliance alternative means a substitute for a requirement in another Part of Division B that is listed in Part 10 or 11 of Division B, and "C.A." has a corresponding meaning.

    Compressed gas means

    (a) any contained mixture or material having a vapour pressure exceeding one or both of the following:

    (i)275.8 kPa (absolute) at 21°C, or

    (ii)717 kPa (absolute) at 54°C, or

    (b) any liquid having a vapour pressure exceeding 275.8 kPa (absolute) at 37.8°C.

    Computer room means a room

    (a) that contains electronic computer or data processing equipment such as main frame type,

    (b) that is separated from the remainder of the building for the purpose of controlling the air quality in the room by a self-contained climate control system, and

    (c) that has an occupant load of not more than one person for each 40 m² of the room.

    Conditioned space means any space within a building, the temperature of which is controlled to limit variation in response to the exterior ambient temperature by the provision, either directly or indirectly, of heating or cooling over substantial portions of the year.

    Construction index means a level on a scale of 1 to 8 determined in accordance with Table 11.2.1.1.-A of Division B designating the expected performance level of the building structure with respect to the type of construction and fire protection of an existing building, and "C.I." has a corresponding meaning.

    Contained use area means a supervised area containing one or more rooms in which occupant movement is restricted to a single room by security measures not under the control of the occupant.

    Continuous vent means a vent pipe that is an extension of a vertical section of a branch or fixture drain.

    Cooktop means a cooking surface having one or more burners or heating elements.

    Critical level means the level of submergence at which a back-siphonage preventer ceases to prevent back-siphonage.

    Dangerous goods means products, materials or substances that are

    (a) regulated by TC SOR/2001-286, "Transportation of Dangerous Goods Regulations (TDGR)", or (See Table 3.2.7.1. of Division B of CCBFC NRCC-CONST-56437E, "National Fire Code of Canada")

    (b) classified as controlled products under HC SOR/2015-17, "Hazardous Products Regulations". (See Note A-Table 3.2.7.1. of Division B of CCBFC NRCC-CONST-56437E, "National Fire Code of Canada")

    Day camp means a camp or resort that admits persons for a continuous period not exceeding 24 hours.

    Dead end means a pipe that terminates with a closed fitting.

    Dead load means the weight of all permanent structural and non-structural components of a building.

    Deep foundation means a foundation unit that provides support for a building by transferring loads either by end-bearing to soil or rock at considerable depth below the building, or by adhesion or friction, or both, in the soil or rock in which it is placed. Piles are the most common type of deep foundation.

    Demountable stage means a structure that

    (a) consists of one or more platforms together with any wall, roof or other structures attached to or located on any of the platforms,

    (b) is intended to be used for public or private performances or events, other than performances or events associated with movie or television productions,

    (c) is intended to be erected, assembled or installed for a limited specified time,

    (d)is capable of being dismantled at its location and moved to be reconstituted elsewhere or is erected for one-time use,

    (e)is not located inside a fully enclosed building,

    (f)is primarily for use by performers and workers, and

    (g)may or may not be mounted on wheels.

    Demountable support structure means any structure that

    (a) is capable of supporting banners, stage sets, props, sound equipment, lighting equipment or other equipment,

    (b) is intended to be used for public or private performances or events, other than performances or events associated with movie or television productions,

    (c) is intended to be erected, assembled or installed for a limited specified time,

    (d) is capable of being dismantled at its location and moved to be reconstituted elsewhere or is erected for one-time use,

    (e) is not attached to or located on a demountable stage,

    (f) is not located inside a fully enclosed building,

    (g) is primarily for use by performers and workers, and

    (h)may or may not be mounted on wheels.

    Design activities means the activities described in subsection 15.11(5) of the Act.

    Design bearing pressure means the pressure applied by a foundation unit to soil or rock , which pressure is not greater than the allowable bearing pressure.

    Design capacity means, in the definition of sewage system , the total daily design sanitary sewage flow determined in accordance with Article 8.2.1.3. of Division B.

    Designer means the person responsible for the design.

    Design load means the load applied to a foundation unit , which load is not greater than the allowable load.

    Detention occupancy (Group B, Division 1) means the occupancy by persons who are restrained from or are incapable of evacuating to a safe location without the assistance of another person because of security measures not under their control.

    Developed length means, the length along the centre line of the pipe and fittings.

    Direct-vented (as applying to a fuel-fired space- or water-heating appliance) means an appliance and its venting system in which all the combustion air is supplied directly from the outdoors and the products of combustion are vented directly to the outdoors via independent, totally enclosed passageways connected directly to the appliance.

    Directly connected means physically connected in such a way that neither water or gas can escape from the connection.

    Distilled beverage alcohol means a beverage that is produced by fermentation and contains more than 20% by volume of water-miscible alcohol.

    Distillery means a process plant where distilled beverage alcohols are produced, concentrated or otherwise processed, and includes facilities on the same site where the concentrated products may be blended, mixed, stored or packaged.

    Distributing pipe means a pipe or piping in a water distribution system.

    Distribution box means a device for ensuring that effluent from a treatment unit is distributed in equal amounts to each line of distribution pipe or leaching chamber in a leaching bed.

    Distribution pipe means a line or lines of perforated or open jointed pipe or tile installed in a leaching bed for the purpose of distributing effluent from a treatment unit to the soil, as defined in Part 8 of Division B, or leaching bed fill in the leaching bed.

    Diving board means a flexible board.

    Diving platform means a rigid platform that is not a starting platform.

    Drainage system means an assembly of pipes, fittings, fixtures and appurtenances on a property that is used to convey sewage and clear water waste to a main sewer or a private sewage disposal system, and includes a private sewer, but does not include subsoil drainage piping.

    Drinking water system has the same meaning as in subsection 2(1) of the Safe Drinking Water Act, 2002.

    Drum trap means a trap whose inlet and outlet are in the sides of the cylindrical body of the trap.

    Dual vent means a vent pipe that serves two fixtures and connects at the junction of the trap arms.

    Dwelling unit means a suite operated as a housekeeping unit, used or intended to be used by one or more persons and usually containing cooking, eating, living, sleeping and sanitary facilities.

    Earth pit privy means a latrine consisting of an excavation in the ground surmounted by a superstructure.

    Effluent means sanitary sewage that has passed through a treatment unit.

    Electric space heating means an electric energy source that provides more than 10 percent of the heating capacity provided for a building and includes

    (a) electric resistance unitary baseboard heating,

    (b) electric resistance unitary cabinet heating,

    (c) electric resistance ceiling cable or floor cable heating,

    (d) electric resistance central furnace heating,

    (e) electric hot water space heating, and

    (f) air source heat pumps in combination with electric resistance backup heating.

    Encapsulated mass timber construction means that type of construction in which a degree of fire safety is attained by the use of encapsulated mass timber elements with an encapsulation rating and minimum dimensions for structural members and other building assemblies.

    Encapsulation rating means the time in minutes that a material or assembly of materials will delay the ignition and combustion of encapsulated mass timber elements when it is exposed to fire under specified conditions of test and performance criteria, or as otherwise prescribed by this Code.

    Excavation means the space created by the removal of soil, rock or fill for the purposes of construction.

    Exhaust duct means a duct through which air is conveyed from a room or space to the outdoors.

    Exit means that part of a means of egress, including doorways, that leads from the floor areait serves to a separate building, an open public thoroughfare, or an exterior open space protected from fire exposure from the building and having access to an open public thoroughfare. (See Note A-1.4.1.2.(1))

    Exit level means the level of an exit stairway at which an exterior exit door or exit passageway leads to the exterior.

    Exit storey (as applying to Subsection 3.2.6. of Division B) means a storey having an exterior exit door.

    Exposing building face means that part of the exterior wall of a building that faces one direction and is located between ground level and the ceiling of its top storey or, where a building is divided into fire compartments, the exterior wall of a fire compartment that faces one direction.

    Exterior cladding means those components of a building that are exposed to the outdoor environment and are intended to provide protection against wind, water or vapour.

    Factory-built chimney means a chimney consisting entirely of factory-made parts, each designed to be assembled with the other without requiring fabrication on site.

    Farm building means a building or part thereof that contains an agricultural occupancy. (See Note A-1.4.1.2.(1))

    Fill means soil, rock, rubble, industrial waste such as slag, organic material or a combination of these that is transported and placed on the natural surface of soil or rock or organic terrain. It may or may not be compacted.

    Fire block means a material, component or system that restricts the spread of fire within a concealed space or from a concealed space to an adjacent space.

    Fire compartment means an enclosed space in a building that is separated from all other parts of the building by enclosing construction providing a fire separation having a required fire-resistance rating.

    Fire damper means a closure consisting of a damper that is installed in an air distribution system or a wall or floor assembly and that is normally held open but designed to close automatically in the event of a fire in order to maintain the integrity of the fire separation.

    Fire detector means a device that detects a fire condition and automatically initiates an electrical signal to actuate an alert signal or alarm signal and includes heat detectors and smoke detectors.

    Fire load (as applying to an occupancy) means the combustible contents of a room or floor area expressed in terms of the average weight of combustible materials per unit area, from which the potential heat liberation may be calculated based on the calorific value of the materials, and includes the furnishings, finished floor, wall and ceiling finishes, trim and temporary and movable partitions.

    Fire-protection rating means the time in minutes or hours that a closure will withstand the passage of flame when exposed to fire under specified conditions of test and performance criteria, or as otherwise prescribed in this Code.

    Fire-resistance rating means the time in minutes or hours that a material or assembly of materials will withstand the passage of flame and the transmission of heat when exposed to fire under specified conditions of test and performance criteria, or as determined by extension or interpretation of information derived therefrom as prescribed in this Code. (See Sentence 1.2.1.(2) in MMAH Supplementary Standard SB-2)

    Fire-retardant-treated wood means wood or a wood product that has had its surface-burning characteristics, such as flame spread, rate of fuel contribution and density of smoke developed, reduced by impregnation with fire-retardant chemicals.

    Fire separation means a construction assembly that acts as a barrier against the spread of fire. (See Note A-1.4.1.2.(1))

    Fire service main means a pipe and its appurtenances that are connected to a source of water and that are located on a property

    (a) between the source of water and the base of the riser of a water-based fire protection system,

    (b) between the source of water and inlets to foam making systems,

    (c) between the source of water and the base elbow of private hydrants or monitor nozzles,

    (d) as fire pump suction and discharge piping not within a building, or

    (e) beginning at the inlet side of the check valve on a gravity or pressure tank.

    Fire service pipe means a pipe that conveys water from a public water main or private water source to the inside of a building for the purpose of supplying the fire sprinkler or standpipe systems.

    Firestop means a system consisting of a material, component and means of support used to fill gaps between fire separations or between fire separations and other assemblies, or used around items that wholly or partially penetrate a fire separation.

    Fire stop flap means a device intended for use in horizontal assemblies required to have a fire-resistance rating and incorporating protective ceiling membranes that operates to close off a duct opening through the membrane in the event of a fire

    Firewall means a type of fire separation of noncombustible construction that subdivides a building or separates adjoining buildings to resist the spread of fire and that has a fire-resistance rating as prescribed in this Code and has structural stability to remain intact under fire conditions for the required fire-rated time.

    First storey means the storey that has its floor closest to grade and its ceiling more than 1.8 m above grade.

    Fixture means a receptacle, appliance, apparatus or other device that discharges sewage or clear water waste, and includes a floor drain.

    Fixture drain means the pipe that connects a trap serving a fixture to another part of a drainage system.

    Fixture outlet pipe means a pipe that connects the waste opening of a fixture to the trap serving the fixture.

    Fixture unit, as applying to a drainage system, means the unit of measure based on the rate of discharge, time of operation and frequency of use of a fixture that expresses the hydraulic load that is imposed by that fixture on the drainage system.

    Fixture unit, as applying to water distribution systems, means the unit of measure based on the rate of supply, time of operation and frequency of use of a fixture or outlet that expresses the hydraulic load that is imposed by that fixture or outlet on the supply system.

    Flame-spread rating means an index or classification indicating the extent of spread-of-flame on the surface of a material or an assembly of materials as determined in a standard fire test as prescribed in this Code.

    Flammable liquid means a liquid having a flash point below 37.8°C and having a vapour pressure not more than 275.8 kPa (absolute) at 37.8°C as determined by ASTM D323, "Standard Test Method for Vapor Pressure of Petroleum Products (Reid Method)."

    Flash point means the minimum temperature at which a liquid within a container gives off vapour in sufficient concentration to form an ignitable mixture with air near the surface of the liquid.

    Flight means a series of steps between landings. (See Note A-1.4.1.2.(1))

    Flood level rim means the top edge at which water can overflow from a fixture or device.

    Floor area means the space on any storey of a building between exterior walls and required firewalls, including the space occupied by interior walls and partitions, but not including exits, vertical service spaces, and their enclosing assemblies.

    Flow control roof drain means a roof drain that restricts the flow of storm water into the storm drainage system.

    Flue means an enclosed passageway for conveying flue gases.

    Flue collar means the portion of a fuel-fired appliance designed for the attachment of the flue pipe or breeching.

    Flue pipe means the pipe connecting the flue collar of an appliance to a chimney.

    Food premises means a floor area where food or drink for human consumption, or an ingredient of food or drink for human consumption, is manufactured, processed, prepared, stored, displayed, handled, served, distributed, sold or offered for sale, but does not include

    (a) a private residence,

    (b) a boarding house that provides meals for fewer than 10 boarders,

    (c) a building to which Ontario Regulation 502/17 (Camps in Unorganized Territory) or Ontario Regulation 503/17 (Recreational Camps) made under the Health Protection and Promotion Act applies,

    (d) a plant, as defined in the Milk Act, that is required to be operated under the authority of a licence issued under that Act,

    (e) premises where a licensed activity, as defined in the Food Safety and Quality Act, 2001, is carried on by a person who is required to hold a licence issued under that Act,

    (f) an egg-grading station or an egg-processing station, as defined in subsection 1(1) of Ontario Regulation 171/10 (Eggs and Processed Egg), made under the Food Safety and Quality Act, 2001,

    (g) a floor area occupied by a church, service club or fraternal organization for the purpose of

    (i)preparing meals for special events for its members and personally invited guests, or

    (ii) conducting bake sales, or

    (h) a farm building.

    Forced-air furnace means a furnace equipped with a fan that provides the primary means for the circulation of air.

    Force main means a sanitary drainage pipe through which sanitary sewage is conveyed by mechanical or pneumatic propulsion.

    Foundation means a system or arrangement of foundation units through which the loads from a building are transferred to supporting soil or rock .

    Foundation unit means one of the structural members of the foundation of a building such as a footing, raft or pile.

    Fresh air inlet means a vent pipe that is installed in conjunction with a building trap and terminates outdoors.

    Frost action means the phenomenon that occurs when

    (a) water in soil is subjected to freezing which, because of the water ice phase change or ice lens growth, results in a total volume increase or the build-up of expansive forces under confined conditions or both, and

    (b) the subsequent thawing leads to loss of soil strength and increased compressibility.

    Functional statement means a function set out in Article 3.2.1.1. that a building or an element of a building is intended to perform.

    Furnace means a space-heating appliance using warm air as the heating medium and usually having provision for the attachment of ducts.

    Gaming premises means premises that are a gaming site as defined in the Ontario Lottery and Gaming Corporation Act, 1999.

    Gas vent means that portion of a venting system designed to convey vent gases to the outdoors

    (a) from the vent connector of a gas-fired appliance, or

    (b) directly from the appliance when a vent connector is not used.

    Grade means the average level of proposed or finished ground adjoining a building at all exterior walls.

    Graded lumber means lumber that has been graded and stamped to indicate its grade, as determined by the NLGA, "Standard Grading Rules for Canadian Lumber".

    Greenhouse agricultural occupancy (Group G, Division 3) means an agricultural building or part thereof that is primarily constructed of roofs and walls designed to transmit natural light.

    Greywater means sanitary sewage of domestic origin that is derived from fixtures other than sanitary units.

    Gross area means the total area of all floors above grade measured between the outside surfaces of exterior walls or between the outside surfaces of exterior walls and the centre line of firewalls, except that, in any occupancy other than a residential occupancy, where an access or a building service penetrates a firewall, measurements shall not be taken to the centre line of such firewall.

    Ground water means, when applied to a sewage system, water below the surface of the ground that occupies a zone of the earth's mantle that is saturated with water.

    Ground water table means, when applied to a sewage system, the elevation of the upper surface of the ground water existing in the area of the sewage system.

    Groundwater means a free standing body of water in the ground.

    Groundwater level (groundwater table) means the top surface of a free standing body of water in the ground.

    Guard means a protective barrier, with or without openings through it, that is around openings in floors or at the open sides of stairs, landings, balconies, mezzanines, galleries, raised walkways or other locations to prevent accidental falls from one level to another.

    Hauled sewage means sanitary sewage that

    (a) is not finally disposed of at the site where it is produced and is not conveyed by a sewer to sewage works, and

    (b) is stored or retained at the site where it is produced for periodic collection, handling, treatment, transportation, storage or processing prior to final disposal at a place other than where it was produced,

    and includes sanitary sewage that is removed from a sewage system for the purpose of cleaning or maintaining the system.

    Hauled sewage system means works, installations, equipment, operations and land used in connection with the collection, handling, treatment, transportation, storage, processing and disposal of hauled sewage, as regulated under the Environmental Protection Act.

    Hazard index means a level on a scale of 1 to 8 determined in accordance with Tables 11.2.1.1.-B to 11.2.1.1.-N of Division B, designating the life safety hazard to occupants of a building based on

    (a) use and occupancy,

    (b) occupant load,

    (c) the use and function of floor spaces,

    (d) the difficulty of egress,

    (e) the fire load of contents, finishes and furnishings,

    (f) the configuration or compartmentation of floor spaces, and

    (g) the size of the building,

    and "H.I." has a corresponding meaning.

    Hazardous classroom means a classroom

    (a) that is supplied with flammable gas,

    (b) that contains hazardous substances such as chemicals or explosive dusts,

    (c) that contains large quantities of combustible materials, or

    (d) where cooking equipment is used.

    Hazardous extraction means a process to remove or separate a substance from a solution or mixture that involves the use of flammable liquids, combustible liquids or flammable gases as solvents in the process.

    Hazardous room means a room containing sufficient quantities of a substance that, because of its chemical nature, may create an atmosphere or condition of imminent hazard to health.

    Header means a vent pipe that connects two or more vent stacks or stack vents to open air.

    Header line means a line of pipe with watertight joints installed in a sewage system for the purpose of distributing effluent from a treatment unit to the distribution pipe in a leaching bed.

    Heat detector means a fire detector designed to operate at a predetermined temperature or rate of temperature rise.

    Heavy timber construction means that type of combustible construction in which a degree of fire safety is attained

    (a) by placing limitations on the sizes of wood structural members and on the thickness and composition of wood floors and roofs, and

    (b) by the avoidance of concealed spaces under floors and roofs.

    Heritage building means a building or part thereof,

    (a) that is identified, or otherwise protected under the Ontario Heritage Act as being of cultural heritage value or interest:

    (b) that has been set apart as a National Historic Site of Canada by the Minister of the Environment for Canada under the Canada National Parks Act (Canada):

    (c) that has been marked or commemorated as a historic place having national historic interest or significance under the Historic Sites and Monuments Act (Canada); or

    (d) that is listed on an inventory of property forming part of the cultural and natural heritage of a place inscribed on the United Nations Educational, Scientific and Cultural Organisation's World Heritage List of sites under the Convention Concerning the Protection of the World Cultural and Natural Heritage. (See Note A-1.4.1.2.(1))

    High ground water table means the highest elevation at which there is physical evidence that the soil, as defined in Part 8 of Division B, or the leaching bed fill has been saturated with water.

    High-hazard agricultural occupancy (Group G, Division 1) means an agricultural occupancy containing sufficient quantities of highly combustible and flammable or explosive materials which, because of their inherent characteristics, constitute a special fire hazard.

    High-hazard industrial occupancy (Group F, Division 1) means an industrial occupancy containing sufficient quantities of highly combustible and flammable or explosive materials which, because of their inherent characteristics, constitute a special fire hazard.

    Holding tank means a tank designed to totally retain all sanitary sewage discharged into it and requiring periodic emptying.

    Home for special care means a home for the care of persons requiring nursing, residential or sheltered care.

    Horizontal branch means that part of a waste pipe that is horizontal and installed to convey the discharge from more than one fixture.

    Horizontal exit means an exit from one building to another by means of a doorway, vestibule, walkway, bridge or balcony.

    Horizontal service space means a space such as an attic, duct, ceiling, roof or crawl space

    (a) that is oriented essentially in a horizontal plane,

    (b) that is concealed and generally inaccessible, and

    (c) through which building service facilities such as pipes, ducts and wiring may pass.

    Hotel means floor areas, a floor area or part of a floor area that contains four or more suites and that provides sleeping accommodation for the travelling public or for recreational purposes.

    Hub drain means a drain opening for indirect liquid wastes

    (a) that does not serve as a floor drain,

    (b) that has the same pipe size, material and venting requirements as a floor drain,

    (c) that has a flood level rim above the floor in which it is installed, and

    (d) that receives wastes that are discharged directly into the drain opening.

    Impeded egress zone means a supervised area in which occupants have free movement but require the release, by security personnel, of security doors at the boundary before they are able to leave the area, but does not include a contained use area.

    Indirectly connected means not directly connected.

    Indirect service water heater means a service water heater that derives its heat from a heating medium such as warm air, steam or hot water.

    Individual vent means a vent pipe that serves one fixture.

    Indoor pool means a public pool where the pool and pool deck are totally or partially covered by a roof.

    Industrial occupancy (Group F) means the occupancy or use of a building or part thereof for the assembling, fabricating, manufacturing, processing, repairing or storing of goods and materials.

    Interceptor means a receptacle that is designed and installed to prevent oil, grease, sand or other materials from passing into a drainage system.

    Interconnected floor space means superimposed floor areas or parts of floor areas in which floor assemblies that are required to be fire separations are penetrated by openings that are not provided with closures.

    Lake Simcoe shoreline has the same meaning as in the Lake Simcoe Protection Plan established under the Lake Simcoe Protection Act, 2008 and dated July, 2009.

    Lake Simcoe watershed has the same meaning as in section 2 of the Lake Simcoe Protection Act, 2008.

    Leaching means dispersal of liquid by downward or lateral drainage or both into permeable soil, as defined in Part 8 of Division B, or leaching bed fill.

    Leaching bed means an absorption system constructed as absorption trenches or as a filter bed, located wholly in ground or raised or partly raised above ground, as required by local conditions, to which effluent from a treatment unit is applied for treatment and disposal and that is composed of

    (a) the soil, as defined in Part 8 of Division B, leaching bed fill or other filter media that is contained between the surface on which the sanitary sewage is applied and the bottom of the bed,

    (b) the leaching chamber or the distribution pipe and the stone or gravel layer in which the distribution pipe is located, and

    (c) the backfill above the distribution pipe or the leaching chamber, including the topsoil and sodding or other anti erosion measure, and the side slopes of any portion elevated above the natural ground elevation.

    Leaching bed fill means unconsolidated material suitable for the construction of a leaching bed, placed in the area of the leaching bed in order to obtain the required unsaturated zone below the distribution pipes or leaching chambers and the required lateral extent such that the effluent is absorbed.

    Leaching chamber means a formed structure with an open bottom and permeable sidewalls installed in a leaching bed for the purpose of distributing effluent from a treatment unit to the soil, as defined in Part 8 of Division B, or leaching bed fill in the leaching bed.

    Leader means a pipe that is installed to carry storm water from a roof to a storm building drain or sewer or other place of disposal.

    Limiting distance means the distance from an exposing building face to a property line, the centre line of a street, lane or public thoroughfare, or to an imaginary line between 2 buildings or fire compartments on the same property, measured at right angles to the exposing building face.

    Listed means equipment or materials included in a list published by a certification organization accredited by the Standards Council of Canada.

    Liquid manure means manure having a dry matter content of less than 18 per cent or a slump of more than 150 millimetres using the Test Method for the Determination of Liquid Waste (slump test) set out in Schedule 9 to Regulation 347 of the Revised Regulations of Ontario, 1990 (General — Waste Management) made under the Environmental Protection Act.

    Live load means a variable load due to the intended use and occupancy that is to be assumed in the design of the structural members of a building. It includes loads due to cranes and the pressure of liquids in containers.

    Live/work unit means a dwelling units having an area of not more than 200 m² that contains a subsidiary business and personal services occupancy or a subsidiary low-hazard industrial occupancy, and which is used and operated by one or more persons of a single household.

    Loadbearing (as applying to a building element) means subjected to or designed to carry loads in addition to its own dead load, excepting a wall element subjected only to wind or earthquake loads in addition to its own dead load.

    Loading rate means the volume in litres of effluent per square metre applied in a single day to soil, as defined in Part 8 of Division B, or leaching bed fill.

    Low-hazard industrial occupancy (Group F, Division 3) means an industrial occupancy in which the combustible content is not more than 50 kg/m² or 1,200 MJ/m² of floor area.

    Low human occupancy means, when applied to a farm building, an occupancy in which the occupant load is not more than one person per 40 m² of floor area during normal use.

    Major occupancy means the principal occupancy for which a building or part thereof is used or intended to be used, and shall be deemed to include the subsidiary occupancies that are an integral part of the principal occupancy. The major occupancy classifications used in this Code are as follows:

    Group A, Division 1 – Assembly occupancies intended for the production and viewing of the performing arts

    Group A, Division 2 – Assembly occupancies not elsewhere classified in Group A

    Group A, Division 3 – Assembly occupancies of the arena type

    Group A, Division 4 — Assembly occupancies in which the occupants are gathered in the open air

    Group B, Division 1 – Detention occupancies in which persons are under restraint or are incapable of self-preservation because of security measures not under their control

    Group B, Division 2 – Care and treatment occupancies

    Group B, Division 3 – Care occupancies

    Group C – Residential occupancies

    Group D – Business and personal services occupancies

    Group E – Mercantile occupancies

    Group F, Division 1 – High-hazard industrial occupancies

    Group F, Division 2 – Medium-hazard industrial occupancies

    Group F, Division 3 – low-hazard industrial occupancies

    Group G, Division 1 – High-hazard agricultural occupancies

    Group G, Division 2 – Agricultural occupancies not elsewhere classified in Group G

    Group G, Division 3 – Greenhouse agricultural occupancies

    Group G, Division 4 – Agricultural occupancies with no human occupants

    Make-up water means water added to a public pool from an external source.

    Marquee means a canopy over an entrance to a building.

    Masonry or concrete chimney means a chimney of brick, stone, concrete or masonry units constructed on site.

    Means of egress means a continuous path of travel provided for the escape of persons from any point in a building or contained open space to a separate building, an open public thoroughfare, or an exterior open space protected from fire exposure from the building and having access to an open public thoroughfare. means of egress includes exits and access to exits.

    Mechanically vented (as applying to a fuel-fired space- or water-heating appliance) means an appliance and its combustion venting system in which the products of combustion are entirely exhausted to the outdoors by a mechanical device, such as a fan, blower or aspirator, upstream or downstream from the combustion zone of the appliance, and the portion of the combustion venting system that is downstream of the fan, blower or aspirator is sealed and does not include draft hoods or draft control devices. (See Note A-1.4.1.2.(1))

    Medium-hazard industrial occupancy (Group F, Division 2) means an industrial occupancy in which the combustible content is more than 50 kg/m² or 1,200 MJ/m² of floor areaand not classified as a high-hazard industrial occupancy.

    Mercantile occupancy (Group E) means the occupancy or use of a building or part thereof for the displaying or selling of retail goods, wares or merchandise.

    Mezzanine means an intermediate floor assembly between the floor and ceiling of any room or storey and includes an interior balcony.

    Mobility assistive device means a mobility assistive device as defined in section 2 of Ontario Regulation 191/11 (Integrated Accessibility Standards) made under the Accessibility for Ontarians with Disabilities Act, 2005.

    Modified pool means a public pool that has a basin-shaped floor sloping downward and inward toward the interior from the rim.

    Modified stack venting means a stack venting arrangement in which the stack vent above the connection of the highest stack vented fixture is reduced in diameter.

    Municipal drinking water system has the same meaning as in subsection 2(1) of the Safe Drinking Water Act, 2002.

    Nominally horizontal means at an angle of less than 45° with the horizontal.

    Nominally vertical means at an angle of not more than 45° with the vertical.

    Nominal pipe size (NPS) means the nominal diameter by which a pipe, fitting, trap or other similar item is commercially designated.

    Noncombustible means that a material meets the acceptance criteria of CAN/ULC-S114, "Standard Method of Test for Determination of Non-Combustibility in Building Materials."

    Noncombustible construction means that type of construction in which a degree of fire safety is attained by the use of noncombustible materials for structural members and other building assemblies.

    Objective means an objective set out in Article 2.2.1.1.

    Occupancy means the use or intended use of a building or part thereof for the shelter or support of persons, animals or property.

    Occupant load means the number of persons for which a building or part thereof is designed.

    Offset means the piping that connects the ends of two pipes that are parallel.

    Offset relief vent means a relief vent that provides additional air circulation upstream and downstream of an offset in a stack.

    Open air means the atmosphere outside a building.

    Open-air storey means a storey in which at least 25% of the total area of its perimeter walls is open to the outdoors in a manner that will provide cross-ventilation to the entire storey.

    Outdoor pool means a public pool that is not an indoor pool.

    Pail privy means a latrine in which the receptacle for human waste consists of a removable container surmounted by a superstructure.

    Partition means an interior wall 1 storey or part-storey in height that is not loadbearing.

    Party wall means a wall

    (a) that is jointly owned and jointly used by two parties under an easement agreement or by a right in law, and

    (b) that is erected at or upon a line separating two parcels of land each of which is, or is capable of being, a separate real estate entity.

    Perched groundwater means a free standing body of water in the ground extending to a limited depth.

    Percolation time means the average time in minutes that is required for water to drop one centimetre during a percolation test or as determined by a soil evaluation or analysis.

    Performance level means the level of performance under which all or part of an existing building functions with respect to its building systems.

    Permanent solid nutrient storage facility has the same meaning as in subsection 1(1) of Ontario Regulation 267/03 (General) made under the Nutrient Management Act, 2002.

    Pharmacy means the premises in a building or the part of the premises in which prescriptions are compounded and dispensed for the public or in which drugs are sold by retail.

    Pile means a slender deep foundation unit made of materials such as wood, steel or concrete or a combination thereof, that is either premanufactured and placed by driving, jacking, jetting or screwing, or cast-in-place in a hole formed by driving, excavating or boring. (Cast-in-place bored piles are often referred to as caissons in Canada.)

    Plenum means a chamber forming part of an air duct system.

    Plumbing appliance means a receptacle or equipment that receives or collects water, liquids or sewage and discharges water, liquid or sewage directly or indirectly to a plumbing system.

    Plumbing system means a system of connected piping, fittings, valves, equipment, fixtures and appurtenances contained in plumbing.

    Point of entry treatment unit has the same meaning as in subsection 1(1) of Ontario Regulation 170/03 (Drinking Water Systems) made under the Safe Drinking Water Act, 2002.

    Pool deck means the area immediately surrounding a public pool.

    Portable privy means a portable latrine in which the receptacle for human body waste and the superstructure are combined structurally into one unit.

    Post-disaster building means a building that is necessary for the provision of essential services to the general public in the event of a disaster and includes

    - hospitals, emergency treatment facilities and blood banks,

    - telephone exchanges,

    - power generating stations and electrical substations,

    - control centres for natural gas distribution,

    - control centres for air, land and marine transportation,

    - water treatment facilities,

    - water storage facilities,

    - water and sewage pumping stations,

    - sewage treatment facilities, and

    - buildings of the following types, unless exempted from this designation by the principal authority:

    - emergency response facilities,

    - fire, rescue and police stations and housing for vehicles, aircraft or boats used for such purposes, and

    - communications facilities, including radio and television stations. (See Note A-1.4.1.2.(1))

    Potable means fit for human consumption.

    Potable water system means the plumbing that conveys potable water.

    Pressurized distribution system means a leaching bed in which the effluent is distributed through the use of pressurized distribution pipes.

    Private sewage disposal system means a sewage system or a sewage works that is not owned and operated by the Crown, a municipality or an organization acceptable to the Director responsible for issuing an environmental compliance approval required under section 53 of the Ontario Water Resources Act.

    Private sewer means a sewer other than a building sewer that

    (a) is not owned or operated by a municipality, the Ministry of the Environment, Conservation and Parks or another public agency,

    (b) receives drainage from more than one sanitary building drain either directly or through more than one sanitary building sewer or receives drainage from more than one storm building drain either directly or through one or more storm building sewers, and connects to a main sewer, or

    (c) serves as a place of disposal on the property, but does not include

    (d) a sewer that carries only the sanitary waste or storm sewage from semi-detached houses each containing not more than two dwelling units,

    (e) a sewer that carries only the sanitary waste or storm sewage from one main building that is of care, care and treatment, detention, commercial or industrial occupancy and one ancillary building, or

    (f) a sewer that carries only the sanitary waste or storm sewage from a row housing complex having five or fewer dwelling units.

    Private use means, when applied to plumbing fixtures, fixtures in residences and apartments, in private bathrooms of hotels, and in similar installations in other buildings for a single household or an individual.

    Private water supply means piping that serves as a source of supply on the property to more than one water service pipe.

    Private water supply system means an assembly of pipes, fittings, valves, equipment and appurtenances that supplies water from a private source to a potable water system.

    Privy vault means a latrine in which the receptacle for human waste consists of a constructed vault from which the waste is periodically removed.

    Process plant means an industrial occupancy where materials, including flammable liquids, combustible liquids or gases, are produced or used in a process.

    Professional engineer means a person who holds a licence or a temporary licence under the Professional Engineers Act.

    Protected floor space means that part of a floor areaprotected from the effects of fire and used as part of a means of egress from an interconnected floor space.

    Public corridor means a corridor that provides access to exit from more than one suite. (See Note A-1.4.1.2.(1))

    Public heritage building means a heritage building where the occupancy in whole or in part includes viewing of the building by the public provided that displays in it are limited to those relevant to the heritage significance of the building.

    Public pool means a structure, basin, chamber or tank containing or intended to contain an artificial body of water for swimming, water sport, water recreation or entertainment, but does not include

    (a) pools operated in conjunction with less than six dwelling units, suites or single family residences or any combination of them,

    (b) pools that are used only for commercial display and demonstration purposes,

    (c) wading pools,

    (d) hydro-massage pools, or

    (e) pools that serve only as receiving basins for persons at the bottom of water slides.

    Public spa means a hydro-massage pool that contains an artificial body of water, that is intended primarily for therapeutic or recreational use, that is not drained, cleaned or refilled before use by each individual and that utilizes hydrojet circulation, air induction bubbles, current flow or a combination of them over the majority of the pool area, but does not include

    (a) wading pools, or

    (b) spas operated in conjunction with less than six dwelling units, suites or single family residences, or any combination of them, for the use of occupants or residents and their visitors.

    Public use means, when applied to plumbing fixtures, fixtures in general washrooms of schools, gymnasiums, hotels, bars, public comfort stations and other installations in which fixtures are installed so that their use is unrestricted.

    Public way means a sidewalk, street, highway, square or other open space to which the public has access, as of right or by invitation, expressed or implied.

    Rainwater means storm sewage runoff that is collected from a roof or the ground, but not from accessible patios and driveways.

    Ramp means a path of travel having a slope steeper than 1 in 20.

    Recirculation system means a system

    (a) that maintains the circulation of water through a public pool by pumps, and

    (b) that provides continuous treatment of the water, including filtration and chlorination or bromination and any other process that may be necessary for the treatment of the water.

    Recreational camp means a camp for recreational activities consisting of one or more buildings or other structures established or maintained as living quarters, with or without charge, for the temporary occupancy of 10 or more persons for five or more days.

    Relief vent means a vent pipe that is used in conjunction with a circuit vent to provide additional air circulation between a drainage system and a venting system.

    Repair garage means a building or part thereof where facilities are provided for the repair or servicing of motor vehicles.

    Residential full flow-through fire sprinkler/standpipe system means an assembly of pipes and fittings installed in the residential portions of a building containing one or two-family dwelling units that conveys water from the water service pipe to outlets in the sprinkler and standpipe systems and is fully integrated into the potable water system to ensure a regular flow of water through all parts of both systems.

    Residential occupancy (Group C) means an occupancy in which sleeping accommodation is provided to residents who are not harboured for the purpose of receiving special care or treatment and are not involuntarily detained and includes an occupancy in which sleeping accommodation is provided to residents of a retirement home.

    Residential partial flow-through sprinkler/standpipe system means an assembly of pipes and fittings installed in the residential portions of a building containing one or two family dwelling units that conveys water from the water service pipe to outlets in the sprinkler and standpipe systems and in which flow occurs during inactive periods of the sprinkler and standpipe systems only through the main header to the water closet located at the farthest point of the two systems.

    Retirement home means a building or part of a building that is a retirement home as defined in subsection 2(1) of the Retirement Homes Act, 2010.

    Return duct means a duct for conveying air from a space being heated, ventilated or air-conditioned back to the heating, ventilating or air-conditioning appliance.

    Rim joist means the outermost member in floor framing, other than blocking, be it parallel, perpendicular or on an angle to the floor joists. (See Note A-1.4.1.2.(1))

    Riser means a water distributing pipe that extends through at least one full storey, as defined in Part 7 of Division B.

    Rock means that portion of the earth's crust that is consolidated, coherent and relatively hard and is a naturally formed, solidly bonded, mass of mineral matter that cannot readily be broken by hand.

    Roof drain means a fitting or device that is installed in the roof to permit storm water to discharge into a leader.

    Roof gutter means an exterior channel installed at the base of a sloped roof to convey storm water.

    Run means the horizontal distance between two adjacent tread nosings on a stair. (See Figure A-9.8.4.-B in Note A-9.8.4. of Division B.)

    Sanitary building drain means a building drain that conducts sewage to a building sewer from the most upstream stack, branch or fixture drain serving a water closet.

    Sanitary building sewer means a pipe that is connected to a sanitary building drain 1,000 mm outside a wall of a building and that conducts sewage to a public sewer or private sewage disposal system.

    Sanitary drainage pipe means all piping that conveys sanitary sewage to a place of disposal, including the sanitary building drain, sanitary building sewer, soil pipe, soil stack, waste stack and waste pipe but not the main sewer or piping in a sewage treatment plant.

    Sanitary drainage system means a drainage system that conducts sewage.

    Sanitary sewage means

    (a) liquid or water borne waste

    (i)of industrial or commercial origin, or

    (ii)of domestic origin, including human body waste, toilet or other bathroom waste, and shower, tub, culinary, sink and laundry waste, or

    (b) liquid or water borne waste discharged from a public pool to a drain.

    Sanitary sewer means a sewer that conducts sewage.

    Sanitary unit means a water closet, urinal, bidet or bedpan washer.

    Secondary suite means a self-contained dwelling units located in a building or portion of a building of only residential occupancy that contains only one other dwelling units and common spaces, and where both dwelling units constitute a single real estate entity. (See Note A-1.4.1.2.(1))

    Self-service storage building means a building that is used to provide individual storage spaces to the public and that is open to the public only for those purposes.

    Septic tank means a watertight vault in which sanitary sewage is collected for the purpose of removing scum, grease and solids from the liquid without the addition of air and in which solids settling and anaerobic digestion of the sanitary sewage takes place.

    Service room means a room provided in a building to contain equipment associated with building services. (See Note A-1.4.1.2.(1))

    Service space means space provided in a building to facilitate or conceal the installation of building service facilities such as chutes, ducts, pipes, shafts or wires.

    Service water heater means a device for heating water for plumbing services.

    Sewage means sanitary sewage or storm sewage.

    Sewage system means

    (a) a chemical toilet, an incinerating toilet, a recirculating toilet, a self-contained portable toilet and all forms of privy, including a portable privy, an earth pit privy, a pail privy, a privy vault and a composting toilet system,

    (b) a greywater system,

    (c) a cesspool,

    (d) a leaching bed system, or

    (e) a system that requires or uses a holding tank for the retention of hauled sewage at the site where it is produced before its collection by a hauled sewage system , where these

    (f) have a design capacity of 10,000 litres per day or less,

    (g) have, in total, a design capacity of 10,000 litres per day or less, where more than one of these are located on a lot or parcel of land, and

    (h) are located wholly within the boundaries of the lot or parcel of land on which is located the building or buildings they serve.

    Sewage works means sewage works as defined in subsection 1(1) of the Ontario Water Resources Act.

    Sewer lateral extension means the portion of a storm building sewer or sanitary building sewer that extends from the public sewer up to 1.5 m into the property.

    Shallow buried trench means an absorption trench that contains a chamber or leaching chamber.

    Shallow foundation means a foundation unit that derives its support from soil or rock located close to the lowest part of the building that it supports.

    Shelf and rack storage system means a self-contained structural system within a building, having one or more elevated platforms or walkway levels for personnel access that may also support conveyors and other material handling, storage and distribution equipment.

    Significant drinking water threat has the same meaning as in subsection 2(1) of the Clean Water Act, 2006.

    Size means the nominal diameter by which a pipe, fitting, trap or other similar item is commercially designated.

    Smoke alarm means a combined smoke detector and audible alarm device designed to sound an alarm within the room or suite in which it is located upon the detection of smoke within that room or suite.

    Smoke detector means a fire detector designed to operate when the concentration of airborne combustion products exceeds a predetermined level.

    Soil means, except for the purposes of Part 8 of Division B, a portion of the earth’s crust that is fragmentary or such that individual particles of a dried sample may be readily separated by agitation in water, and includes boulders, cobbles, gravel, sand, silt, clay and organic matter.

    Soil pipe means a sanitary drainage pipe that carries the discharge of a sanitary unit, with or without the discharge from any other fixture.

    Soil stack means a vertical soil pipe that passes through one or more storeys and includes any offset that is part of the stack.

    Solid masonry means a single wythe or multi-wythe construction made of solid masonry units or semi-solid, cored, or hollow masonry units, the cells of which may or may not be filled with mortar or grout. In multi-wythe masonry construction, the space between the wythes consists of a mortar-filled collar joint or grout-filled space and the wythes may or may not be constructed of the same masonry materials.

    Solid masonry unit means a concrete block or brick unit, a clay brick unit, or a calcium silicate brick unit whose net solid area is at least 75% of its gross area. (See Note A-1.4.1.2.(1))

    Sound transmission class (STC) means a single number rating of the airborne sound attenuation of a building assembly separating two adjoining spaces, taking into account the direct sound transmission path. (See Note A-1.4.1.2.(1)) (See also Note A-9.11. of Division B)

    Source protection area has the same meaning as in subsection 2(1) of the Clean Water Act, 2006.

    Source protection plan has the same meaning as in subsection 2(1) of the Clean Water Act, 2006.

    Space heater means a space-heating appliance for heating the room or space within which it is located, without the use of ducts.

    Space-heating appliance means an appliance intended for the supplying of heat to a room or space directly, such as a >unit heater, or to rooms or spaces of a building through a heating system such as a central furnace or boiler.

    Sprinklered (as applying to a building or part thereof) means that the building or part thereof is equipped with a system of automatic sprinklers.

    Stack vent means a vent pipe that connects the top of a soil stack or waste stack to a header or open air and “stack vented” has a corresponding meaning.

    Stack venting means, when used with reference to fixtures, an arrangement such that the connections of the drainage piping from the stack vented fixtures to the stack provide venting to the fixture traps so that no additional vent pipe is required.

    Stage means a space that is designed primarily for theatrical performances with provision for quick change scenery and overhead lighting, including environmental control for a wide range of lighting and sound effects and that is traditionally, but not necessarily, separated from the audience by a proscenium wall and curtain opening.

    Starting platform means a rigid platform located entirely on a pool deck that consists of a top that, if projected horizontally over the water surface, would be less than 1,000 mm in vertical height above the surface and that is designed to be used by a swimmer to dive from at the start of a swimming race.

    Storage garage means a building or part thereof intended for the storage or parking of motor vehicles and containing no provision for the repair or servicing of such vehicles. (See Note A-1.4.1.2.(1))

    Storey means, except for the purposes of Part 7 of Division B, the portion of a building

    (a) that is situated between the top of any floor and the top of the floor next above it, or

    (b) that is situated between the top of the floor and the ceiling above the floor, if there is no floor above it.

    Storm building drain means a building drain that conducts storm water and is connected at its upstream end to a leader, sump or catch basin, and at its downstream end to a building sewer or a designated storm water disposal location.

    Storm building sewer means a building sewer that conveys storm sewage to a place of disposal and commences 1,000 mm from the building.

    Storm drainage pipe means all the connected piping that conveys storm sewage to a place of disposal and includes the storm building drain, storm building sewer, rain water leader, catch basin and area drain installed to collect water from the property and the piping that drains water from a swimming pool, other than a public pool, or from water cooled air-conditioning equipment, but does not include

    (a) a subsoil drainage pipe, or

    (b) a private sewage treatment and disposal facility designed for the treatment or retention of storm sewage prior to discharge to the natural environment.

    Storm drainage system means a drainage system that conveys storm sewage.

    Storm sewage means water that is discharged from a surface as a result of rainfall, snow melt or snowfall.

    Storm sewer means a sewer that conveys storm sewage.

    Stove means an appliance intended for cooking or space heating or both.

    Street means any highway, road, boulevard, square or other improved thoroughfare that is 9 m or more in width, that has been dedicated or deeded for public use and that is accessible to fire department vehicles and equipment.

    subsoil drainage pipe means a pipe that is installed underground to intercept and convey subsurface water, and includes foundation drain pipes.

    Subsurface investigation means the appraisal of the general subsurface conditions at a building site by analysis of information gained by such methods as geological surveys, in situ testing, sampling, visual inspection, laboratory testing of samples of the subsurface materials and groundwater observations and measurements.

    Suite means a single room or series of rooms of complementary use, operated under a single tenancy, and includes

    (a) dwelling units,

    (b) individual guest rooms in motels, hotels, boarding houses, rooming houses and dormitories, and

    (c) individual stores and individual or complementary rooms for business and personal services occupancies.

    (See Note A-1.4.1.2.(1))

    Supply duct means a duct for conveying air from a heating, ventilating or air-conditioning appliance to a space to be heated, ventilated or air-conditioned.

    Surface water means water on the surface of the ground.

    Tapered tread means a tread with non-parallel edges that increases or decreases its run uniformly over its width.

    Tarion Warranty Corporation means Tarion Warranty Corporation as designated under section 2 of the Ontario New Home Warranties Plan Act.

    Theatre means a place of public assembly intended for the production and viewing of the performing arts or the screening and viewing of motion pictures, and consisting of an auditorium with permanently fixed seats intended solely for a viewing audience.

    Trap means a fitting or device that is designed to hold a liquid seal that will prevent the passage of gas but will not materially affect the flow of a liquid.

    Trap arm means that portion of a fixture drain between the trap weir and the vent pipe fitting.

    Trap dip means the lowest part of the upper interior surface of a trap.

    Trap seal depth means the vertical distance between the trap dip and the trap weir.

    Trap standard means the trap for a fixture that is integral with the support for the fixture.

    Trap weir means the highest part of the lower interior surface of a trap.

    Treatment unit means a device that, when designed, installed and operated in accordance with its design specifications, provides a specific degree of sanitary sewage treatment to reduce the contaminant load from that of sanitary sewage to a given effluent quality.

    Tribunal means the Licence Appeal Tribunal established under the Licence Appeal Tribunal Act, 1999.

    Type A dispersal bed means a leaching bed that receives effluent from a Level IV treatment unit as described in Table 8.6.2.2. of Division B and that is comprised of a stone layer or leaching chambers installed over an unsaturated sand layer as described in Subsection 8.7.7. of Division B.

    Type B dispersal bed means a leaching bed comprised of a pressurized distribution system that uniformly distributes effluent from a Level IV treatment unit as described in Table 8.6.2.2. of Division B to the underlying soil, as defined in Part 8 of Division B, through a set of distribution pipes installed in a bed comprised of septic stone.

    Underpinning means the process of strengthening the foundation or lowering the level of a foundation of an existing building.

    Unit heater means a suspended space heater with an integral air-circulating fan.

    Unprotected opening means, when applied to an exposing building face.

    (a) a doorway, window or opening, other than one equipped with a closure having the required fire-protection rating, or

    (b) any part of a wall forming part of the exposing building face that has a fire-resistance rating less than required for the exposing building face.

    Unstable liquid means a liquid, including flammable liquids and combustible liquids, that is chemically reactive to the extent that it will vigorously react or decompose at or near normal temperature and pressure conditions or that is chemically unstable when subjected to impact.

    Vacuum breaker means back-siphonage preventer.

    Vapour barrier means the elements installed to control the diffusion of water vapour. (See Note A-1.4.1.2.(1))

    Vent connector (as applying to heating or cooling systems) means the part of a venting system that conducts the flue gases or vent gases from the flue collar of a gas appliance to the chimney or gas vent, and may include a draft control device.

    Vent pipe means a pipe that is part of a venting system.

    Vent stack means a vent pipe that is connected at its upper end to a header or is terminated in open air and that is used to limit pressure differential in a soil or waste stack.

    Venting system means an assembly of pipes and fittings that connects a drainage system with open air for circulation of air and the protection of trap seals in the drainage system.

    Vertical leg means the vertical portion of a fixture drain and includes the portion of a drain from the outlet of a water closet bowl to the point where the connecting piping changes to horizontal.

    Vertical service space means a shaft oriented essentially vertically that is provided in a building to facilitate the installation of building services including mechanical, electrical and plumbing installations and facilities such as elevators, refuse chutes and linen chutes.

    Vulnerable area has the same meaning as in subsection 2(1) of the Clean Water Act, 2006.

    Walkway means a covered or roofed pedestrian thoroughfare used to connect 2 or more buildings.

    Waste pipe means a sanitary drainage pipe that carries the discharge from a fixture directly to a waste stack, soil stack, sanitary building drain, branch or sewage system .

    Waste stack means a vertical waste pipe that passes through one or more storeys and includes any offset that is part of the stack that conducts liquid waste from fixtures other than sanitary units.

    Water distribution system means an assembly of pipes, fittings, valves and appurtenances that conveys potable water to water supply outlets, fixtures, plumbing appliances and devices from the water service pipe or from a point of entry treatment unit located in the building.

    Water purveyor means the owner or operator of a drinking water system.

    Water service pipe means a pipe on the property that conveys potable water from a drinking water system or a private water supply to the inside of the building.

    Water system means a water service pipe, a private water supply, a water distribution system, a fire service main or any part of any of them.

    Wave action pool means a public pool equipped with a means for inducing wave motion in the water.

    Wet vent means a waste pipe that also serves as a vent pipe.

    Working capacity means the volume of liquid that a treatment unit or holding tank is capable of holding without overflowing while it is in its working position, but does not include the volume of liquid contained in a compartment in which a pump or siphon is installed.

    X-ray equipment includes x-ray imaging systems, processing equipment and equipment directly related to the production of images for diagnosis or directly related to irradiation with x-rays for therapy.

    X-ray machine means an electrically-powered device producing x-rays

    (a) for the irradiation of a human being or an animal for a therapeutic or diagnostic purpose, or

    (b) for industrial use.

    Yoke vent means a vent pipe that is connected at its lower end to a soil or waste stack and at its upper end to a vent stack or a branch vent that is connected to a vent stack.

    (2)Where a word or term that is defined in Sentence (1) is used, it shall be read as if it has the same meaning as in that Sentence, unless the context requires otherwise.

    Open OBC Div. A 1.4.1.2. in the code viewer
  • OBC Div. C 1.3.6.1. Application

    (1)Where a by-law, resolution or regulation has been made by a principal authority under clause 7(1)(g) of the Act, the chief building official may require that as constructed plans for the whole of, or any part or system of, a building or any class of buildings be provided by the persons responsible for the construction.

    Open OBC Div. C 1.3.6.1. in the code viewer
  • OBC Div. C 2.1.1.1. Documentation

    (1)The person proposing the use of an alternative solution shall provide documentation to the chief building official or registered code agency that,

    (a)identifies applicable objectives, functional statements and acceptable solutions, and

    (b)establishes on the basis of past performance, tests described in Article 2.1.1.2. or other evaluation that the proposed alternative solution will achieve the level of performance required under Article 1.2.1.1. of Division A.

    (2)The documentation described in Sentence (1) shall include information about relevant assumptions, limiting or restricting factors, testing procedures, studies or building performance parameters, including any commissioning, operational and maintenance requirements.

    Open OBC Div. C 2.1.1.1. in the code viewer
  • OBC Div. C 2.1.1.2. Tests

    (1)Where no published test method to establish the suitability of an alternative solution proposed under Article 2.1.1.1. exists, then the tests used for the purposes of that Article shall be designed to simulate or exceed anticipated service conditions or shall be designed to compare the performance of the material or system with a similar material or system that is known to be acceptable.

    (2)The results of tests or evaluations based on test standards, other than as described in this Code, may be used for the purposes of Sentence (1), if the alternate test standards provide comparable results.

    Open OBC Div. C 2.1.1.2. in the code viewer
  • OBC Div. C 2.4.2.1. Criteria

    (1)Sentence (2) sets out criteria to be followed by the Minister when making a ruling under clause 29(1)(c) of the Act to approve the use of an alternative material, system or building design.

    (2)The Minister’s approval of the use of an alternative material, system or building design referred to in Sentence (1) may be granted only if the approval is consistent with,

    (a)a decision of the Building Code Commission in respect of a dispute described in clause 24(1)(a) of the Act,

    (b)an approval of the use of the material, system or building design in the whole of another province or territory in accordance with the law of that province or territory, or

    (c)a revision of the NRCC-CONST-56435E 2020, “National Building Code of Canada”, or the NRCC-CONST-56436E 2020, “National Plumbing Code of Canada”, that has been approved by the Canadian Commission on Building and Fire Codes.

    Open OBC Div. C 2.4.2.1. in the code viewer
  • OBC Div. C 2.4.3.1. Interpretations By Minister

    (1)Every interpretation issued by the Minister under section 28.1 of the Act shall be made available to the public,

    (a)by posting the interpretation on the Building Code website, and

    (b)by providing a written copy of the interpretation on receipt of a request for it.

    Open OBC Div. C 2.4.3.1. in the code viewer