Skip to content

Last updated

Values this chapter turns on

to issue or refuse a permit for a house
10 days
to issue or refuse a permit for a house
to inspect after most prescribed notices
2 days
to inspect after most prescribed notices
maximum area of a permit-exempt storage shed
15 m²
maximum area of a permit-exempt storage shed
to send new home permit information to Tarion
45 days
to send new home permit information to Tarion

Division C Part 1 is the code's own rulebook for running the permit system. The Act sets the framework (permits, inspections, occupancy); Part 1 fills in the numbers. Expect many lookups here: decision periods, exemptions, notices and inspection times.

Not tested: 1.2.1. (design), 1.5. (designated persons), 1.6. (prescribed person) and 1.9. (fees).

Application of Division C and general review

Part 1 applies to all buildings covered by the code, and the code must be administered in conformance with the Act OBC Div. C 1.1.1.1.OBC Div. C 1.1.1.1. Application(1) This Part applies to all buildings covered in this Code. (See Article 1.1.1.1. of Division A.), 1.1.1.2.OBC Div. C 1.1.1.2. Conformance with Administrative Requirements(1) This Code shall be administered in conformance with the Act..

General review by an architect or engineer checks that construction generally conforms to the permit documents. It is required for buildings listed in Table 1.2.2.1. and for a list of special items OBC Div. C 1.2.2.1.OBC Div. C 1.2.2.1. General Review by Architect or Professional Engineer(1) The construction, including, for greater certainty, enlargement or alteration, of every building or part of it described in Table 1.2.2.1. shall be reviewed by an architect or a professional engineer or a combination of both as set out in Column 3 of the Table. (2) A person who intends to construct or have…. The owner must retain the reviewer, and the reviewer sends written reports to the CBO or RCA.

Item needing review Reviewer
Foundation below adjacent footings within the angle of repose, or underpinning Engineer
Tent framing and anchorage over 225 m2 Engineer
Ground sign over 7.5 m high Architect or engineer
Projecting sign over 115 kg, or any on a parapet Architect or engineer
Roof sign with a face over 10 m2 Architect or engineer

Only an architect may review a building designed by an architect, and only an engineer may review one designed by an engineer OBC Div. C 1.2.2.2.OBC Div. C 1.2.2.2. Restriction for General Review(1) Only an architect may carry out or provide the general review of the construction of a building, (a) that is constructed in accordance with a design prepared or provided by an architect, or (b) in relation to services that are provided by an architect in connection with the design in accordance with which the…. A demolition needs an engineer's general review when the building is over 3 storeys or 600 m2, has pre- or post-tensioned members, goes below adjacent footings within the angle of repose, or uses explosives or a laser OBC Div. C 1.2.2.3.OBC Div. C 1.2.2.3. Demolition of a Building(1) The applicant for a permit respecting the demolition of a building shall retain a professional engineer to undertake the general review of the project during demolition, where, (a) the building exceeds 3 storeys in building height or 600 m² in building area, (b) the building structure includes pre-tensioned or….

Practice this topic

Permits: requirements, applications and time periods

Exemptions from a building permit OBC Div. C 1.3.1.1.OBC Div. C 1.3.1.1. Requirement for Permits(1) A person is exempt from the requirement to obtain a permit under section 8 of the Act, (a) for the demolition of a farm building located on a farm, (b) subject to Sentence (2), for the construction or demolition of a building in territory without municipal organization, or (c) for the construction of a Class 1…:

  • demolition of a farm building on a farm,
  • construction or demolition in territory without municipal organization (except sewage systems),
  • a Class 1 sewage system,
  • tents up to 60 m2 total, not attached, more than 3 m from other structures,
  • a shed up to 15 m2, one storey, detached, storage only, no plumbing,
  • a demountable stage not regulated by Section 3.17.

Who applies. The owner or the owner's authorized agent, on the Minister's form. "Owner" includes the registered owner, a lessee and a mortgagee in possession OBC Div. C 1.3.1.2.OBC Div. C 1.3.1.2. Applications for Permits under Section 8 of the Act(1) An application for a permit under section 8 of the Act to construct or demolish a building shall be made by, (a) the owner of the property on which the proposed construction or demolition is to take place, or (b) the authorized agent of the owner referred to in Clause (a). (2) An application referred to in….

Decision periods. For a complete application, the CBO must issue the permit or refuse it with written reasons within the period in Table 1.3.1.3. OBC Div. C 1.3.1.3.OBC Div. C 1.3.1.3. Period Within Which a Permit is Issued or Refused(1) Subject to Sentences (2) and (3) and unless the circumstances set out in Sentence (6) exist, if an application for a permit under subsection 8(1) of the Act that meets the requirements of Sentence (5) is submitted to a chief building official, the chief building official shall, within the time period set out in…, Table 1.3.1.3.OBC Div. C Table 1.3.1.3. Period Within Which Permit Shall be Issued or Refused — Forming Part of Article 1.3.1.3.Table 1.3.1.3. Period Within Which Permit Shall be Issued or Refused — Forming Part of Article 1.3.1.3. Item | Class of Building | Time Period 1 | (a) Except for a retirement home, a house where no dwelling unit is located above another dwelling unit. (b) A detached structure that serves a building described in Clause…:

Building Days
House with no unit above another (not a retirement home), small detached accessory up to 55 m2, tents, signs 10
Part 9 buildings in Div. A 1.3.3.3.(1)(a) to (c) not in item 1; farm buildings up to 600 m2 15
Part 3 buildings; farm buildings over 600 m2; retirement homes 20
Post-disaster buildings; buildings subject to 3.2.6. or 3.2.8.3. to 3.2.8.8. 30

Rules for counting: the clock starts the day after a complete application is submitted, and Saturdays, holidays and days the office is closed do not count. Mixed applications take the longer period. Plumbing-only and sewage system permits use the longer of 10 days or the period for the building they serve. If the CBO finds missing documents or a breach of applicable law, the CBO must tell the applicant with reasons within two days, and the clock does not run.

Change of use permits. Table 1.3.1.4. shows which occupancy changes need a section 10 permit. Some changes always count as an increase in hazard, such as one Group C suite becoming several, conversion to a gaming premises, a farm building changing to a non-G occupancy or to G-1, a change to a post-disaster building or retirement home, or an unknown previous occupancy. No section 10 permit is needed if a section 8 permit already covers the work, or in unorganized territory OBC Div. C 1.3.1.4.OBC Div. C 1.3.1.4. Permits Under Section 10 of the Act(1) Except as provided in Sentence (2), the following changes in use of a building or part of a building constitute an increase in hazard for the purposes of section 10 of the Act and require a permit under section 10 of the Act: (a) a change of the major occupancy of all or part of a building that is designated with….

Conditional permits. The CBO may not issue one until listed applicable laws are met (conservation authority, heritage, Niagara Escarpment and others). A minor variance with no objections, or work required by a Fire Code or unsafe building order, can satisfy the zoning test. The permit must show that it is conditional OBC Div. C 1.3.1.5.OBC Div. C 1.3.1.5. Conditional Permits(1) The chief building official shall not issue a conditional permit for any stage of construction under subsection 8(3) of the Act unless compliance with the following applicable laws has been achieved in respect of the proposed building or construction: (a) section 3 of the Building Transit Faster Act, 2020 with….

Information to others. For Group C new homes (not hotels or rooming houses), permit information goes to Tarion within 45 days OBC Div. C 1.3.1.6.OBC Div. C 1.3.1.6. Information to be Given to Tarion Warranty Corporation(1) This Article prescribes, for the purposes of subsection 8(8.1) of the Act, the information relating to permits issued under section 8 of the Act and the applications for those permits that the chief building official is required to give to Tarion Warranty Corporation and the time within which the information is…. For non-house buildings with lightweight floor or roof systems, permit information goes to the fire chief (or the clerk) within 45 days OBC Div. C 1.3.1.7.OBC Div. C 1.3.1.7. Information to be Given to the Fire Chief or Clerk(1) This Article applies to buildings, (a) constructed using, (i) lightweight pre-engineered floor or roof systems containing lightweight elements such as wood I-joists, cold-formed steel joists, wood truss assemblies with metal or wood plates and metal web wood joists, or (ii) lightweight floor or roof systems….

Practice this topic

Site documents and occupancy of buildings

The permit, or a copy, must be posted in a conspicuous place on the property for the whole job OBC Div. C 1.3.2.1.OBC Div. C 1.3.2.1. Permit Posting(1) Where a permit has been issued pursuant to the Act, the person to whom it is issued shall have the permit or a copy of it posted at all times during construction or demolition in a conspicuous place on the property in respect of which the permit was issued.. The person in charge must keep on site a certified set of drawings with authorized changes, plus any BMEC authorizations and Minister's rulings the permit relied on OBC Div. C 1.3.2.2.OBC Div. C 1.3.2.2. Documentation on Site(1) The person in charge of the construction of the building shall keep and maintain on the site of the construction, (a) at least one copy of drawings and specifications certified by the chief building official or a person designated by the chief building official to be a copy of those submitted with the application….

Occupancy before full completion follows several paths:

Building Rule
General Occupancy permit once structure and walls are to the roof, exits, fire separations, fire systems, services and sewage system are done 1.3.3.1.OBC Div. C 1.3.3.1. Occupancy Permit — General(1) Except as permitted in Sentence 1.3.3.2.(1), a person may occupy or permit to be occupied any building or part of it that has not been fully completed at the date of occupation where the chief building official or a person designated by the chief building official has issued a permit authorizing occupation of the…
Small residential: 3 storeys or less, 600 m2 or less, max 1 unit above another, max 2 units sharing egress May occupy without a permit once listed systems are complete, operational and inspected 1.3.3.2.OBC Div. C 1.3.3.2. Conditions for Residential Occupancy(1) A person may occupy or permit to be occupied a building intended for residential occupancy that has not been fully completed at the date of occupation provided that, (a) the building, (i) is of three or fewer storeys in building height and has a building area not exceeding 600 m², (ii) has not more than 1 dwelling…
Houses with no unit above another and no shared egress Occupancy permit always required 1.3.3.4.OBC Div. C 1.3.3.4. Occupancy Permit — Certain Buildings of Residential Occupancy(1) No person shall occupy or permit to be occupied a building described in Sentence (3), or part of it, unless the chief building official or a person designated by the chief building official has issued a permit authorizing occupation of the building or part of it in accordance with Sentence (4). (2) This Article…
Buildings within the scope of Div. B 3.2.2.51. or 3.2.2.60. Occupancy permit required 1.3.3.5.OBC Div. C 1.3.3.5. Occupancy Permit — Buildings Within the Scope of Article 3.2.2.51. or 3.2.2.60.(1) No person shall occupy or permit to be occupied a building within the scope of Article 3.2.2.51. or 3.2.2.60. of Division B, or part of it, unless the chief building official or a person designated by the chief building official has issued a permit authorizing occupation of the building or part of it in accordance…
Super tall: 65 storeys or more than 250 m Special phased permit 1.3.3.7.OBC Div. C 1.3.3.7. Occupancy Permit — Super Tall Buildings(1) This Article applies to a building, (a) that is 65 or more storeys in building height or more than 250 m in height, and (b) for which the applicant for the permit has provided notice in accordance with Sentence (6) to the chief building official that they intend to occupy or permit the building or part of the…

A person who occupies under 1.3.3.1. or 1.3.3.2. must notify the CBO forthwith on completion OBC Div. C 1.3.3.3.OBC Div. C 1.3.3.3. Notification(1) Where a person has occupied or permitted the occupancy of a building under Article 1.3.3.1. or 1.3.3.2., such person shall notify the chief building official forthwith upon completion of the building..

Practice this topic

Fire department approval, prescribed notices and inspections

If council gives the fire chief, as an inspector, responsibility for fire safety parts of the code, the CBO cannot issue a permit until the fire chief approves the drawings. This cannot apply to a building with an RCA appointed for plans review OBC Div. C 1.3.4.1.OBC Div. C 1.3.4.1. Fire Department Approval(1) Subject to Sentence (2), if the council of a municipality assigns specific responsibility for the enforcement of any portion of this Code respecting fire safety matters to an inspector who is the chief of the fire department of the municipality, the chief building official shall not issue a permit to construct a….

The permit holder must give notice at each prescribed stage, such as readiness to construct footings, footings and foundations before backfill, framing, insulation and vapour barriers, fire protection systems, plumbing tests and sewage system stages OBC Div. C 1.3.5.1.OBC Div. C 1.3.5.1. Prescribed Notices(1) This Article sets out the notices that are required under section 10.2 of the Act. (2) The person to whom a permit under section 8 of the Act is issued shall notify the chief building official or, where a registered code agency is appointed under the Act in respect of the construction to which the notice relates…. A by-law may add more stages, such as start of construction or completion of site grading OBC Div. C 1.3.5.2.OBC Div. C 1.3.5.2. Additional Notices(1) A by-law, resolution or regulation made by a principal authority under clause 7(1)(e) of the Act may require that notice of one or more of the following stages of construction be given by the person to whom a permit is issued under section 8 of the Act: (a) commencement of construction of the building, (b)….

Notice Inspection within
Most prescribed notices 2 days
Sewage system start or pre-backfill 5 days
Occupancy with deferred development charges (1.3.3.8.) 10 days

Counting starts the day after notice and skips Saturdays, holidays and closed days. The inspector may rely on reports and may inspect remotely OBC Div. C 1.3.5.3.OBC Div. C 1.3.5.3. Prescribed Inspections(1) Except as provided in Sentence (2), an inspector or registered code agency, as the case may be, shall, not later than two days after receipt of a notice given under Sentence 1.3.5.1.(2), undertake a site inspection of the building to which the notice relates. (2) Where a notice given under Sentence 1.3.5.1.(2)…. Orders under 12(2), 13, 14(1), 15.10.1(2) and 18(1)(f) must be on the Minister's form OBC Div. C 1.3.5.5.OBC Div. C 1.3.5.5. Orders(1) An order issued under subsection 12(2), 13(1) or (6), 14(1) or 15.10.1(2) or clause 18(1)(f) of the Act shall be in a form approved by the Minister..

Practice this topic

As constructed plans and temporary facilities

Where a section 7 by-law allows it, the CBO may require as constructed plans for all or part of a building OBC Div. C 1.3.6.1.OBC Div. C 1.3.6.1. Application(1) Where a by-law, resolution or regulation has been made by a principal authority under clause 7(1)(g) of the Act, the chief building official may require that as constructed plans for the whole of, or any part or system of, a building or any class of buildings be provided by the persons responsible for the…. Temporary COVID-19 health or residential facilities were exempt, but the exemption ends March 31, 2027, and they must be inspected at least monthly for unsafe conditions OBC Div. C 1.3.7.2.OBC Div. C 1.3.7.2. Exemption(1) The construction of a temporary health or residential facility and the conversion of all or part of an existing building or structure to a temporary health or residential facility are exempt from the requirement to obtain a permit under section 8 of the Act or section 10 of the Act and are exempt from compliance…, 1.3.7.4.OBC Div. C 1.3.7.4. Inspections(1) A chief building official or an inspector shall, in accordance with Sentence (2), undertake an inspection of the temporary health or residential facility pursuant to subsection 15.9(1) of the Act to determine whether the facility is unsafe as described in subsection 15.9(2) of the Act. (2) An inspection described….

Practice this topic

Sewage enforcement, language, tiny houses and off-site construction

Table 1.7.1.1. names the boards of health and conservation authority that enforce sewage system rules in their areas OBC Div. C 1.7.1.1.OBC Div. C 1.7.1.1. General(1) The boards of health and conservation authorities listed in Column 1 of Table 1.7.1.1. are prescribed, for the purposes of subsection 3.1(1) of the Act, as the boards of health and conservation authorities that are responsible for the enforcement of the provisions of the Act and this Code related to sewage systems…. Required signs must be in English, or English and French OBC Div. C 1.8.1.1.OBC Div. C 1.8.1.1. Language Used on Required Signs(1) All required signs in this Code shall be displayed in the English language or in the English and French languages, including operational material on all life safety equipment and devices..

Section 1.11 covers single-unit houses of 37 m2 or less built partly in one place and installed elsewhere. The building municipality issues a permit without site-installation compliance; the installing municipality issues a second permit and gets a letter of compliance listing the inspections done OBC Div. C 1.11.1.1.OBC Div. C 1.11.1.1. Scope(1) This Section applies to houses that, (a) have not more than one dwelling unit, (b) are 37 m² or less in building area, and (c) are to be, (i) partially constructed in one municipality and moved to be installed at a location in another municipality without having been previously occupied, or (ii) partially…, 1.11.1.2.OBC Div. C 1.11.1.2. Permits(1) Provided the conditions described in Sentence (2) are complied with, if an applicant for a permit under section 8 of the Act makes an application to the chief building official of the municipality in which a house is to be partially constructed but not installed, the applicant is exempt from demonstrating…, 1.11.1.3.OBC Div. C 1.11.1.3. Inspections(1) Where a permit is applied for as described in Sentence 1.11.1.2.(1) or (5), the person to whom a permit under section 8 of the Act is issued shall give notice as described in Articles 1.3.5.1. and 1.3.5.2. to the chief building official or registered code agency, as the case may be, of the municipality who issued…. Part 3 manufactured buildings certified to CSA A277 are deemed to comply, except for off-factory components and site installation OBC Div. C 1.12.1.1.OBC Div. C 1.12.1.1. Certification and Compliance(1) Except as provided in Sentence (2), a manufactured building or a manufactured part of a building within the scope of Part 3 is deemed to comply with this Code if it is certified in accordance with CSA A277, “Procedure for Certification of Prefabricated Buildings, Modules, and Panels.” (2) The requirements of this….

Practice this topic

Common traps

  • Days in Part 1 are business days: Saturdays and holidays are excluded, and counting starts the next day.
  • Retirement homes are 20 days even when small.
  • A shed must have no plumbing and be 15 m2 or less to be exempt.
  • The 2-day inspection rule becomes 5 days for sewage notices.
  • An owner includes a lessee and a mortgagee in possession.

Chapter review

Chapter at a glance

One line per section: the idea to carry into the exam. Then the answers that most often catch candidates out.

Usual exam traps

  • Days in Part 1 are business days: Saturdays and holidays are excluded, and counting starts the next day.
  • Retirement homes are 20 days even when small.
  • A shed must have no plumbing and be 15 m2 or less to be exempt.
  • The 2-day inspection rule becomes 5 days for sewage notices.
  • An owner includes a lessee and a mortgagee in possession.

Practice this chapter

Questions on Division C administration: permits, review, occupancy and notices, in the exam format, every answer explained and cited to its article. Sign in to start; a free account gets the free questions.

Code cited in this chapter

Based on the official 2024 Building Code Compendium on ontario.ca.

© King's Printer for Ontario, 2024. Reproduced with permission.

  • OBC Div. C 1.1.1.1. Application

    (1)This Part applies to all buildings covered in this Code. (See Article 1.1.1.1. of Division A.)

    Open OBC Div. C 1.1.1.1. in the code viewer
  • OBC Div. C 1.1.1.2. Conformance with Administrative Requirements

    (1)This Code shall be administered in conformance with the Act.

    Open OBC Div. C 1.1.1.2. in the code viewer
  • OBC Div. C 1.2.2.1. General Review by Architect or Professional Engineer

    (1)The construction, including, for greater certainty, enlargement or alteration, of every building or part of it described in Table 1.2.2.1. shall be reviewed by an architect or a professional engineer or a combination of both as set out in Column 3 of the Table.

    (2)A person who intends to construct or have constructed a building or part of it required by Sentences (1) and (4) to (9) to be reviewed by an architect or a professional engineer or a combination of both, shall ensure that an architect, professional engineer or both are retained to undertake the general review of the construction of the building in accordance with the performance standards of the Ontario Association of Architects or the Association of Professional Engineers of Ontario, as applicable, to determine whether the construction is in general conformity with the plans, sketches, drawings, graphic representations, specifications and other documents that form the basis for the issuance of a permit under section 8 of the Act or any changes to it authorized by the chief building official.

    (3)The architect, professional engineer or both who have been retained to undertake the general review of the construction of a building, shall forward copies of written reports arising out of the general review to the chief building official or registered code agency, as the case may be.

    (4)The construction of a foundation of a building shall be reviewed by a professional engineer where,

    (a)the foundation is to be constructed below the level of the footings of an adjacent building and within the angle of repose of the soil, as drawn from the bottom of the footings, or

    (b)underpinning of a foundation is to be undertaken.

    (5)The construction of a sprinkler protected glazed wall assembly described in Article 3.1.8.20. of Division B shall be reviewed by a professional engineer.

    (6)The construction of a shelf and rack storage system described in Section 3.16. of Division B shall be reviewed by a professional engineer.

    (7)The construction of a supporting framing structure and anchorage system for a tent occupying an area greater than 225 m² shall be reviewed by a professional engineer.

    (8)The construction of a sign structure shall be reviewed by an architect or a professional engineer or a combination of both, where the sign is,

    (a)a ground sign that exceeds 7.5 m in height above the adjacent finished ground,

    (b)a projecting sign that weighs more than 115 kg, or

    (c)a roof sign that has any face that is more than 10 m².

    (9)The construction of a projecting sign attached in any manner to a parapet wall shall be reviewed by an architect, professional engineer or a combination of both.

    (10)The construction of a demountable stage or demountable support structure regulated by Section 3.17. of Division B shall be reviewed by a professional engineer.

    Open OBC Div. C 1.2.2.1. in the code viewer
  • OBC Div. C 1.2.2.2. Restriction for General Review

    (1)Only an architect may carry out or provide the general review of the construction of a building,

    (a)that is constructed in accordance with a design prepared or provided by an architect, or

    (b)in relation to services that are provided by an architect in connection with the design in accordance with which the building is constructed.

    (2)Only a professional engineer may carry out or provide the general review of the construction of a building,

    (a)that is constructed in accordance with a design prepared or provided by a professional engineer, or

    (b)in relation to services that are provided by a professional engineer in connection with the design in accordance with which the building is constructed.

    Open OBC Div. C 1.2.2.2. in the code viewer
  • OBC Div. C 1.2.2.3. Demolition of a Building

    (1)The applicant for a permit respecting the demolition of a building shall retain a professional engineer to undertake the general review of the project during demolition, where,

    (a)the building exceeds 3 storeys in building height or 600 m² in building area,

    (b)the building structure includes pre-tensioned or post-tensioned members,

    (c)it is proposed that the demolition will extend below the level of the footings of any adjacent building and occur within the angle of repose of the soil, as drawn from the bottom of such footings, or

    (d)explosives or a laser are to be used during the course of demolition.

    Open OBC Div. C 1.2.2.3. in the code viewer
  • OBC Div. C 1.3.1.1. Requirement for Permits

    (1)A person is exempt from the requirement to obtain a permit under section 8 of the Act,

    (a)for the demolition of a farm building located on a farm,

    (b)subject to Sentence (2), for the construction or demolition of a building in territory without municipal organization, or

    (c)for the construction of a Class 1 sewage system.

    (2)The exemption in Clause (1)(b) from the requirement to obtain a permit does not apply to the construction of a sewage system in territory without municipal organization.

    (3)The application for a permit respecting the demolition of a building to which Sentence 1.2.2.3.(1) applies shall include descriptions of the structural design characteristics of the building and the method of demolition of the building.

    (4)No person shall commence demolition of a building or any part of a building before the building has been vacated by the occupants except where the safety of the occupants is not affected.

    (5)A tent or group of tents is exempt from the requirement to obtain a permit under section 8 of the Act and is exempt from compliance with the Code provided that the tent or group of tents are,

    (a)not more than 60 m² in aggregate ground area,

    (b)not attached to a building, and

    (c)constructed more than 3 m from other structures.

    (6)A shed is exempt from the requirement to obtain a permit under section 8 of the Act and is exempt from compliance with this Code, provided that the shed,

    (a)is not more than 15 m² in gross area,

    (b)is not more than one storey in building height,

    (c)is not attached to a building or any other structure,

    (d)is used only for storage purposes ancillary to a principal building on the lot, and

    (e)does not have plumbing.

    (7)A demountable stage or demountable support structure not regulated by Section 3.17. of Division B is exempt from the requirement to obtain a permit under section 8 of the Act and is exempt from compliance with this Code.

    Open OBC Div. C 1.3.1.1. in the code viewer
  • OBC Div. C 1.3.1.2. Applications for Permits under Section 8 of the Act

    (1)An application for a permit under section 8 of the Act to construct or demolish a building shall be made by,

    (a)the owner of the property on which the proposed construction or demolition is to take place, or

    (b)the authorized agent of the owner referred to in Clause (a).

    (2)An application referred to in Sentence (1) shall be in a form approved by the Minister.

    (3)In Sentence (1), “owner” includes, in respect of the property on which the construction or demolition will take place, the registered owner, a lessee and a mortgagee in possession.

    Open OBC Div. C 1.3.1.2. in the code viewer
  • OBC Div. C 1.3.1.3. Period Within Which a Permit is Issued or Refused

    (1)Subject to Sentences (2) and (3) and unless the circumstances set out in Sentence (6) exist, if an application for a permit under subsection 8(1) of the Act that meets the requirements of Sentence (5) is submitted to a chief building official, the chief building official shall, within the time period set out in Column 2 of Table 1.3.1.3. corresponding to the class of building described in Column 1 of Table 1.3.1.3. for which the application is made,

    (a)issue the permit, or

    (b)refuse to issue the permit and provide in writing all of the reasons for the refusal.

    (2)If an application for a permit under subsection 8(1) of the Act proposes construction or demolition of two or more buildings of different classes described in Column 1 of Table 1.3.1.3. that have different time periods in Column 2 of Table 1.3.1.3., the longer of the time periods shall be the time period for the purposes of Sentence (1).

    (3)If an application for a permit under subsection 8(1) of the Act proposes construction or demolition of a building described in Sentence (4), the time period for the purposes of Sentence (1) shall be the longer of,

    (a)10 days, and

    (b)the time period corresponding to the class of the building described in Column 1 of Table 1.3.1.3. that the building described in Sentence (4) serves, if any.

    (4)A building referred to in Sentence (3) is,

    (a)a structure occupying an area of 10 m² or less that contains plumbing, including the plumbing appurtenant to it,

    (b)plumbing not located in a structure,

    (c)a sewage system, or

    (d)a structure designated in Article 1.3.3.5. of Division A.

    (5)The requirements that an application for a permit under subsection 8(1) of the Act must meet for the purposes of Sentence (1) are,

    (a)that the application is made in the form described in Sentence 1.3.1.2.(2),

    (b)that the applicant for the permit is a person described in Clause 1.3.1.2.(1)(a) or (b),

    (c)that all applicable fields on the application form and required schedules are completed,

    (d)that all required schedules are submitted with the application,

    (e)that payment is made of all fees that are required, under the applicable by-law, resolution or regulation made under clause 7(1)(c) of the Act, to be paid when the application is made, and

    (f)that the applicant has declared in writing that,

    (i)the application meets all the requirements set out in Clauses (a) to (e),

    (ii)the application is accompanied by the plans and specifications prescribed by the applicable by-law, resolution or regulation made under clause 7(1)(b) of the Act,

    (iii)the application is accompanied by the information and documents prescribed by the applicable by-law, resolution or regulation made under clause 7(1)(b) of the Act which enable the chief building official to determine whether the proposed building, construction or demolition will contravene any applicable law, and

    (iv)the proposed building, construction or demolition will not contravene any applicable law.

    (6)The chief building official is not required to make a decision within the time period required by Sentence (1) with respect to an application that meets the requirements of Sentence (5) if the chief building official,

    (a)determines that,

    (i)the application is not accompanied by the plans, specifications, information and documents referred to in Subclauses (5)(f)(ii) and (iii), or

    (ii)the proposed building, construction or demolition will contravene any applicable law, and

    (b)advises the applicant of his or her determination and provides in writing the reasons for the determination within two days.

    (7)Subject to Sentences (9) and (10), the time period described in Sentences (1) to (3) and in Clause (6)(b) shall begin on the day following the day on which an application that meets the requirements of Sentence (5) is submitted to the chief building official.

    (8)The time periods described in Column 2 of Table 1.3.1.3. and in Clause (6)(b) shall not include Saturdays, holidays and all other days when the offices of the principal authority are not open for the transaction of business with the public.

    (9)The time period in Sentence (10) applies where,

    (a)an application is made for the construction of a building that is served by a sewage system,

    (b)construction is proposed in respect of the sewage system that serves the building, and

    (c)a board of health, conservation authority, planning board or the council of an upper-tier municipality is responsible for the enforcement of the provisions of the Act and this Code related to the sewage system under section 3.1 of the Act or pursuant to an agreement under section 6.2 of the Act.

    (10)The time period described in Sentences (1) to (3) and in Clause (6)(b) for an application referred to in Clause (9)(a) shall begin on the day following the later of,

    (a)the day on which an application that meets the requirements of Sentence (5) is submitted to the chief building official, and

    (b)the day on which a permit for the construction of the sewage system referred to in Clause (9)(b) is issued.

    Open OBC Div. C 1.3.1.3. in the code viewer
Show all 35 articles
  • OBC Div. C Table 1.3.1.3. Period Within Which Permit Shall be Issued or Refused — Forming Part of Article 1.3.1.3.

    Table 1.3.1.3. Period Within Which Permit Shall be Issued or Refused — Forming Part of Article 1.3.1.3. Item | Class of Building | Time Period 1 | (a) Except for a retirement home, a house where no dwelling unit is located above another dwelling unit. (b) A detached structure that serves a building described in Clause (a) and does not exceed 55 m² in building area. (c) A tent to which Section 3.14. of Division B applies. (d) A sign to which Section 3.15. of Division B applies. (e) A demountable stage or demountable support structure to which Section 3.17. of Division B applies. | 10 days 2 | (a) Buildings described in Clause 1.3.3.3.(1)(a), (b) or (c) of Division A, other than buildings described in Column 1 of any of Items 1 and 4 of this Table. (b) Farm buildings that do not exceed 600 m² in building area. | 15 days 3 | (a) Buildings described in Sentence 1.3.3.2.(1) of Division A, other than buildings described in Column 1 of any of Items 1 and 4 of this Table. (b) Farm buildings exceeding 600 m² in building area. (c) Retirement homes. | 20 days 4 | (a) Post-disaster buildings. (b) Buildings to which Subsection 3.2.6. of Division B or any provision in Articles 3.2.8.3. to 3.2.8.8. of Division B applies. | 30 days N/A | Column 1 | Column 2

    Open OBC Div. C Table 1.3.1.3. in the code viewer
  • OBC Div. C 1.3.1.4. Permits Under Section 10 of the Act

    (1)Except as provided in Sentence (2), the following changes in use of a building or part of a building constitute an increase in hazard for the purposes of section 10 of the Act and require a permit under section 10 of the Act:

    (a)a change of the major occupancy of all or part of a building that is designated with a “Y” in Table 1.3.1.4. takes place,

    (b)a suite of a Group C major occupancy is converted into more than one suite of Group C major occupancy,

    (c)a suite or part of a suite of a Group A, Division 2 or a Group A, Division 4 major occupancy is converted to a gaming premises,

    (d)a farm building or part of a farm building is changed to another major occupancy other than a Group G major occupancy,

    (e)a farm building or part of a farm building is changed to a Group G, Division 1 major occupancy.

    (f)a building or part of a building is changed to a post-disaster building,

    (g)a building or part of a building is changed to a retirement home, or

    (h)the use of a building or part of a building is changed and the previous major occupancy of the building or part of the building cannot be determined.

    (2)A person is exempt from the requirement to obtain a permit under section 10 of the Act where the change in use of the building or part of the building will result from proposed construction and a permit under section 8 of the Act has been issued in respect of such construction.

    (3)A person is exempt from the requirement to obtain a permit under section 10 of the Act for the change of use of a building in unorganized territory.

    Open OBC Div. C 1.3.1.4. in the code viewer
  • OBC Div. C 1.3.1.5. Conditional Permits

    (1)The chief building official shall not issue a conditional permit for any stage of construction under subsection 8(3) of the Act unless compliance with the following applicable laws has been achieved in respect of the proposed building or construction:

    (a)section 3 of the Building Transit Faster Act, 2020 with respect to the issuance of a permit under that section,

    (b)section 28 of the Conservation Authorities Act with respect to the prohibition of development activities,

    (c)sections 28.1, 28.1.1 and 28.1.2 of the Conservation Authorities Act with respect to a permit issued for the construction of a building or structure or for any change to a building or structure that would increase its size, alter its use or increase the number of dwelling units,

    (d)regulations made by a conservation authority under clause 28(1)(c) of the Conservation Authorities Act as it read immediately before its repeal by section 25 of Schedule 4 to the Building Better Communities and Conserving Watersheds Act, 2017, with respect to permission of the authority for the construction of a building or structure if, in the opinion of the authority, the control of flooding, erosion, dynamic beaches or pollution or the conservation of land may be affected by the development,

    (e)section 17.2 of the Environmental Assessment Act with respect to the approval of the Minister or the Ontario Land Tribunal to proceed with a project,

    (f)subsection 24(3) of the Niagara Escarpment Planning and Development Act,

    (g)subsection 27(9) of the Ontario Heritage Act,

    (h)subsection 30(2) of the Ontario Heritage Act with respect to a consent of the council of a municipality to the alteration or demolition of a building where the council of the municipality has given a notice of intent to designate the building under subsection 29(3) of that Act,

    (i)section 33 of the Ontario Heritage Act with respect to the consent of the council of a municipality for the alteration of property,

    (j)section 34 of the Ontario Heritage Act with respect to the consent of the council of a municipality for the demolition of a building,

    (k)section 34.5 of the Ontario Heritage Act with respect to the consent of the Minister to the alteration or demolition of a designated building,

    (l)subsection 34.7(2) of the Ontario Heritage Act with respect to a consent of the Minister to the alteration or demolition of a building where the Minister has given a notice of intent to designate the building under section 34.6 of that Act,

    (m)by-laws made under section 40.1 of the Ontario Heritage Act,

    (n)section 42 of the Ontario Heritage Act with respect to the permit given by the council of a municipality for the erection, alteration or demolition of a building,

    (o)section 17.4 of the Ontario New Home Warranties Plan Act with respect to the provision of a confirmation by the Registrar for the construction of a residential condominium conversion project.

    (2)For the purposes of issuing a conditional permit under subsection 8(3) of the Act, a person is exempt from the requirement in clause 8(3)(a) of the Act of compliance with by-laws passed under sections 34 and 38 of the Planning Act where,

    (a)a committee of adjustment has made a decision under section 45 of the Planning Act authorizing one or more minor variances from the provisions of any by-laws made under sections 34 and 38 of that Act,

    (b)such minor variance or variances result in the achievement of full compliance with such by-laws, and

    (c)no person informed the committee of adjustment of objections to the minor variances either in writing or in person at the hearing of the application.

    (3)For the purposes of issuing a conditional permit under subsection 8(3) of the Act, a person is exempt from the requirement in clause 8(3)(a) of the Act of compliance with by-laws passed under sections 34 and 38 of the Planning Act where the construction in respect of which the conditional permit is issued is required in order to comply with an order issued under subsection 21(1) of the Fire Protection and Prevention Act, 1997 or under subsection 15.9(4) of the Act.

    (4)A permit issued under subsection 8(3) of the Act shall indicate its conditional nature.

    Open OBC Div. C 1.3.1.5. in the code viewer
  • OBC Div. C 1.3.1.6. Information to be Given to Tarion Warranty Corporation

    (1)This Article prescribes, for the purposes of subsection 8(8.1) of the Act, the information relating to permits issued under section 8 of the Act and the applications for those permits that the chief building official is required to give to Tarion Warranty Corporation and the time within which the information is required to be given.

    (2)The chief building official shall give the following information to Tarion Warranty Corporation with respect to permits issued under section 8 of the Act in respect of the construction of buildings described in Sentence (4),

    (a)the dates the permits are issued and the numbers or other identifying symbols for the permits, and

    (b)the information contained in the application forms submitted in respect of the permits, other than the information contained in the schedules or other attachments to the application forms.

    (3)Despite Sentence (2), the chief building official is not required to give to Tarion Warranty Corporation information which relates to the extension or material alteration or repair of an existing building.

    (4)The buildings referred to in Sentence (2) are any building whose proposed use is classified as a Group C major occupancy and which is not a boarding, lodging or rooming house or a building containing a hotel.

    (5)The chief building official shall give the information described in Sentence (2) within 45 days after the day on which the permits to which the information relates are issued.

    (6)The time period described in Sentence (5) shall not include Saturdays, holidays and all other days when the offices of the principal authority are not open for the transaction of business with the public.

    Open OBC Div. C 1.3.1.6. in the code viewer
  • OBC Div. C 1.3.1.7. Information to be Given to the Fire Chief or Clerk

    (1)This Article applies to buildings,

    (a)constructed using,

    (i)lightweight pre-engineered floor or roof systems containing lightweight elements such as wood I-joists, cold-formed steel joists, wood truss assemblies with metal or wood plates and metal web wood joists, or

    (ii)lightweight floor or roof systems containing solid sawn lumber joist less than 38 mm by 235 mm,

    (b)other than a house, with or without a secondary unit, and

    (c)for which a permit under section 8 of the Act is issued after July 1, 2022.

    (2)The chief building official shall give the following information to the chief of the fire department and the clerk of every municipality that does not have a fire department in respect of buildings described in Sentence (1):

    (a)the dates the permits are issued and the numbers or other identifying symbols for the permits,

    (b)the address of the building, and

    (c)a description of the floor or roof system.

    (3)The chief building official shall give the information described in Sentence (2) within 45 days after the day on which the permits to which the information relates are issued.

    (4)The time period described in Sentence (3) shall not include Saturdays, holidays and all other days when the offices of the principal authority are not open for the transaction of business with the public.

    Open OBC Div. C 1.3.1.7. in the code viewer
  • OBC Div. C 1.3.2.1. Permit Posting

    (1)Where a permit has been issued pursuant to the Act, the person to whom it is issued shall have the permit or a copy of it posted at all times during construction or demolition in a conspicuous place on the property in respect of which the permit was issued.

    Open OBC Div. C 1.3.2.1. in the code viewer
  • OBC Div. C 1.3.2.2. Documentation on Site

    (1)The person in charge of the construction of the building shall keep and maintain on the site of the construction,

    (a)at least one copy of drawings and specifications certified by the chief building official or a person designated by the chief building official to be a copy of those submitted with the application for the permit to construct the building, together with changes that are authorized by the chief building official or a person designated by the chief building official,

    (b)copies of authorizations of the Building Materials Evaluation Commission on the basis of which the permit was issued, and

    (c)copies of rulings of the Minister, made under clause 29(1)(a) or (c) of the Act, on the basis of which the permit was issued.

    Open OBC Div. C 1.3.2.2. in the code viewer
  • OBC Div. C 1.3.3.1. Occupancy Permit — General

    (1)Except as permitted in Sentence 1.3.3.2.(1), a person may occupy or permit to be occupied any building or part of it that has not been fully completed at the date of occupation where the chief building official or a person designated by the chief building official has issued a permit authorizing occupation of the building or part of it prior to its completion in accordance with Sentence (3).

    (2)Sentence (1) does not apply in respect of the occupancy of a building to which Article 1.3.3.4., 1.3.3.5. or 1.3.3.7. applies or a building or part of it to which Article 1.3.3.8. applies.

    (3)The chief building official or a person designated by the chief building official shall issue a permit authorizing occupation of a building, where,

    (a)the structure of the building or part of it is completed to the roof,

    (b)the enclosing walls of the building or part of them are completed to the roof,

    (c)the walls enclosing the space to be occupied are completed, including balcony guards,

    (d)all required fire separations and closures are completed on all storeys to be occupied,

    (e)all required exits are completed, including all fire separations, doors, door hardware, self-closing devices, guards and handrails, from the uppermost floor to be occupied down to grade level and below if an exit connects with lower storeys,

    (f)all shafts including closures are completed to the floor-ceiling assembly above the storey to be occupied and have a temporary fire separation at such assembly,

    (g)measures have been taken to prevent access to parts of the building and site that are incomplete or still under construction,

    (h)floors, halls, lobbies and required means of egress are free of loose materials and other hazards,

    (i)if service rooms should be in operation, required fire separations and closures are completed,

    (j)all building drains, building sewers, water systems, drainage systems and venting systems are complete and tested as operational for the storeys to be occupied,

    (k)required lighting, heating and electrical supply are provided for the suites, rooms and common areas to be occupied,

    (l)required lighting in corridors, stairways and exits is completed and operational up to and including all storeys to be occupied,

    (m)required standpipe, sprinkler and fire alarm systems are complete and operational up to and including all storeys to be occupied, together with required pumper connections for such standpipes and sprinklers,

    (n)required fire extinguishers have been installed on all storeys to be occupied,

    (o)main garbage rooms, chutes and ancillary services are completed to all storeys to be occupied,

    (p)required firefighting access routes have been provided and are accessible, and

    (q)the sewage system has been completed and is operational.

    (4)Where a registered code agency has been appointed to perform the functions described in clause 4.1(4)(b) or (c) of the Act in respect of the construction of the building, the chief building official or a person designated by the chief building official shall issue the permit referred to in Sentence (3) after receipt of a certificate for the occupancy of a building not fully completed issued by the registered code agency in respect of the building.

    (5)Where applicable, the chief building official or a person designated by the chief building official shall not issue a permit authorizing occupation of the building or part of it, unless compliance with section 168.3.1 of the Environmental Protection Act has been achieved.

    Open OBC Div. C 1.3.3.1. in the code viewer
  • OBC Div. C 1.3.3.2. Conditions for Residential Occupancy

    (1)A person may occupy or permit to be occupied a building intended for residential occupancy that has not been fully completed at the date of occupation provided that,

    (a)the building,

    (i)is of three or fewer storeys in building height and has a building area not exceeding 600 m²,

    (ii)has not more than 1 dwelling unit above another dwelling unit,

    (iii)has not more than 2 dwelling units sharing a common means of egress,

    (iv)has no accommodation for tourists, and

    (v)is not used for a retirement home,

    (b)the following building components and systems are complete, operational and inspected:

    (i)required exits, handrails and guards, fire alarm and detection systems, and fire separations,

    (ii)required exhaust fume barriers and self-closing devices on doors between an attached or built-in garage and a dwelling unit,

    (iii)water supply, sewage disposal, lighting and heating systems, and

    (iv)protection of foamed plastics required by Article 9.10.17.10. of Division B,

    (c)the following building components and systems are complete, operational, inspected and tested:

    (i)water systems,

    (ii)building drains and building sewers, and

    (iii)drainage systems and venting systems, and

    (iv)where applicable, the building conforms to Article 9.1.1.7. of Division B.

    (2)Sentence (1) does not apply in respect of the occupancy of a building to which Article 1.3.3.4. or 1.3.3.5. applies or a building or part of it to which Article 1.3.3.8. applies.

    (3)Where applicable, a person shall not occupy or permit to be occupied a building or part of it, unless compliance with section 168.3.1 of the Environmental Protection Act has been achieved.

    Open OBC Div. C 1.3.3.2. in the code viewer
  • OBC Div. C 1.3.3.4. Occupancy Permit — Certain Buildings of Residential Occupancy

    (1)No person shall occupy or permit to be occupied a building described in Sentence (3), or part of it, unless the chief building official or a person designated by the chief building official has issued a permit authorizing occupation of the building or part of it in accordance with Sentence (4).

    (2)This Article does not apply in respect of the occupancy of:

    (a)an existing building, or part of it, that has been subject to extension or material alteration or repair, or

    (b)a building or part of it to which Article 1.3.3.8. applies.

    (3)A building referred to in Sentence (1) is a building intended for residential occupancy that,

    (a)is of three or fewer storeys in building height and has a building area not exceeding 600 m²,

    (b)has no accommodation for tourists,

    (c)does not have a dwelling unit above another dwelling unit,

    (d)does not have any dwelling units sharing a common means of egress, and

    (e)does not contain a retirement home.

    (4)The chief building official or a person designated by the chief building official shall issue a permit authorizing occupation of a building described in Sentence (3), where,

    (a)the structure of the building with respect to the dwelling unit to be occupied is substantially complete and ready to be used for its intended purpose,

    (b)the building envelope, including, but not limited to, cladding, roofing, windows, doors, assemblies requiring fire-resistance ratings, closures, insulation, vapour barriers and air barriers, with respect to the dwelling unit to be occupied, is substantially complete,

    (c)the walls enclosing the dwelling unit to be occupied conform to Sentence 9.25.2.3.(7) of Division B,

    (d)required electrical supply is provided for the dwelling unit to be occupied,

    (e)required firefighting access routes to the building have been provided and are accessible,

    (f)the following building components and systems are complete and operational for the dwelling unit to be occupied:

    (i)required exits, floor access and egress systems, handrails, guards, smoke alarms, carbon monoxide alarms and fire separations, including, but not limited to, fire stops,

    (ii)required exhaust fume barriers and self-closing devices on doors between an attached or built-in garage and the dwelling unit,

    (iii)water supply, sewage disposal, lighting and heating systems, and

    (iv)protection of foamed plastics required by Article 9.10.17.10. of Division B,

    (g)the following building components and systems are complete, operational and tested for the dwelling unit to be occupied:

    (i)water system,

    (ii)building drain and building sewer, and

    (iii)drainage system and venting system,

    (h)required plumbing fixtures in the dwelling unit to be occupied are substantially complete and operational, and

    (i)where applicable, the building conforms to Article 9.1.1.7. of Division B with respect to the dwelling unit to be occupied.

    (5)Where a registered code agency has been appointed to perform the functions described in clause 4.1(4)(b) or (c) of the Act in respect of the construction of a building described in Sentence (3), the chief building official or a person designated by the chief building official shall issue the permit referred to in Sentence (4) after receipt of a certificate for the occupancy of a building described in Sentence 1.3.3.4.(3) of Division C issued by the registered code agency in respect of the building.

    (6)Where applicable, the chief building official or a person designated by the chief building official shall not issue a permit authorizing occupation of the building or part of it, unless compliance with section 168.3.1 of the Environmental Protection Act has been achieved.

    Open OBC Div. C 1.3.3.4. in the code viewer
  • OBC Div. C 1.3.3.5. Occupancy Permit — Buildings Within the Scope of Article 3.2.2.51. or 3.2.2.60.

    (1)No person shall occupy or permit to be occupied a building within the scope of Article 3.2.2.51. or 3.2.2.60. of Division B, or part of it, unless the chief building official or a person designated by the chief building official has issued a permit authorizing occupation of the building or part of it in accordance with Sentence (3).

    (2)This Article does not apply in respect of the occupancy of an existing building, or part of it, that has been subject to extension or material alteration or repair.

    (3)The chief building official or a person designated by the chief building official shall issue a permit authorizing occupation of a building described in Sentence (1), where

    (a)the structure of the building is completed to the roof,

    (b)the building envelope, including, but not limited to, cladding, roofing, windows, doors, assemblies requiring fire-resistance ratings, closures, insulation, vapour barriers and air barriers, is complete,

    (c)the walls enclosing the space to be occupied are completed, including balcony guards,

    (d)all required fire separations and closures are completed,

    (e)all required exits are completed, including all fire separations, doors, door hardware, self-closing devices, guards and handrails,

    (f)all shafts including closures are completed,

    (g)measures have been taken to prevent access to parts of the building and site that are incomplete or still under construction,

    (h)floors, halls, lobbies and required means of egress are free of loose materials and other hazards,

    (i)if service rooms should be in operation, required fire separations and closures are completed,

    (j)all building drains, building sewers, water systems, drainage systems and venting systems are complete and tested as operational for the storeys to be occupied,

    (k)required lighting, heating and electrical supply are provided for the suites, rooms and common areas to be occupied,

    (l)required lighting in corridors, stairways and exits is completed and operational,

    (m)required standpipe, sprinkler and fire alarm systems are complete and operational, together with required pumper connections for such standpipes and sprinklers,

    (n)required smoke alarms and carbon monoxide alarms are complete and operational,

    (o)required fire extinguishers have been installed,

    (p)main garbage rooms, chutes and ancillary services are completed to all storeys to be occupied,

    (q)required firefighting access routes have been provided and are accessible, and

    (r)the sewage system has been completed and is operational.

    (4)Where a registered code agency has been appointed to perform the functions described in clause 4.1(4)(b) or (c) of the Act in respect of the construction of a building described in Sentence (1), the chief building official or a person designated by the chief building official shall issue the permit referred to in Sentence (3) after receipt of a certificate for the occupancy of a building described in Sentence 1.3.3.5.(1) of Division C issued by the registered code agency in respect of the building.

    Open OBC Div. C 1.3.3.5. in the code viewer
  • OBC Div. C 1.3.3.7. Occupancy Permit — Super Tall Buildings

    (1)This Article applies to a building,

    (a)that is 65 or more storeys in building height or more than 250 m in height, and

    (b)for which the applicant for the permit has provided notice in accordance with Sentence (6) to the chief building official that they intend to occupy or permit the building or part of the building to be occupied in accordance with this Article.

    (2)This Article applies to the occupation of a building where the structure and enclosing walls of the building are not completed to the roof.

    (3)For greater certainty, once the structure and enclosing walls of the building are completed to the roof, Article 1.3.3.1. applies to the authorization of occupation of the remainder of the building.

    (4)This Article does not permit the occupation of exterior balconies, podiums, terraces, platforms and contained open spaces.

    (5)This Article does not permit occupation if the means of egress are located on faces of the building where there is overhead lifting of heavy construction materials, elements and equipment.

    (6)The notice described in Clause (1)(b) must have been provided to the chief building official at the time the first application for a permit under section 8 of the Act is made in respect of the building.

    (7)No person shall occupy or permit to be occupied a building or part of a building described in Sentence (1) unless the chief building official or a person designated by the chief building official has issued a permit authorizing occupation of the building or part of it in accordance with Sentence (8).

    (8)The chief building official or a person designated by the chief building official shall issue a permit authorizing occupation of a building where,

    (a)the structure of the building or part of it is completed to the floor of the storey that is 10 storeys above the uppermost storey to be occupied, other than parts of the floor-ceiling assemblies that are unable to be completed because of the ongoing construction,

    (b)the enclosing walls of the building or part of the enclosing walls are completed to the floor of the storey that is 5 storeys above the uppermost storey to be occupied,

    (c)the walls enclosing the space to be occupied are completed, including balcony guards,

    (d)all required fire separations and doors, including door hardware and self-closing devices, are completed on all storeys up to the floor of the storey that is 5 storeys above the uppermost storey to be occupied,

    (e)all required closures are completed on all storeys up to and including the uppermost storey to be occupied,

    (f)all required exits are completed, including all fire separations, doors, door hardware, self-closing devices, guards and handrails, from the uppermost floor to be occupied down to grade level and below if an exit connects with lower storeys,

    (g)all shafts, including closures, are completed to the floor-ceiling assembly that is 5 storeys above the uppermost storey to be occupied and have a temporary fire separation at such assembly,

    (h)all shafts in the parts of the building that are incomplete or are still under construction are protected against falling objects,

    (i)where there is a crane mast inside the building, walls acting as guards shall,

    (i)separate the crane mast from the parts of the building to be occupied, and

    (ii)be designed and constructed to withstand the loading values specified in Sentence 4.1.5.15.(1) of Division B, where the crane mast or part of the crane mast is located in a storage garage,

    (j)the ceiling of the floor-ceiling assembly above the uppermost storey to be occupied is complete and weather-tight and the floor-ceiling assembly is insulated to prevent condensation,

    (k)measures have been taken to,

    (i)separate the parts of the building to be occupied from the parts of the building and site that are incomplete or still under construction,

    (ii)prevent access to parts of the building and site that are incomplete or still under construction, and

    (iii)protect occupants and members of the public while construction is ongoing,

    (l)floors, halls, lobbies and required means of egress are free of loose materials and other hazards,

    (m)if service rooms should be in operation, required fire separations and closures are completed,

    (n)all building drains, building sewers, water systems, drainage systems and venting systems are complete and tested as operational for the storeys to be occupied,

    (o)required lighting, heating and electrical supply are provided for the suites, rooms and common areas to be occupied,

    (p)required lighting in corridors, stairways and exits is completed and operational up to and including all storeys to be occupied,

    (q)required ventilation is installed and operational for the floor areas to be occupied,

    (r)required sprinkler, fire alarm and smoke control systems, along with required pumper connections for the sprinklers, are complete and operational up to and including the storey to be occupied,

    (s)required standpipe systems are installed and operational up to the storey below the uppermost storey for which the structure of the building is complete, including required pumper connections for such standpipe systems,

    (t)required fire extinguishers have been installed on all storeys to be occupied and for which the structure of the building is complete,

    (u)main garbage rooms, chutes and ancillary services are completed to all storeys to be occupied,

    (v)required firefighting access routes have been provided and are accessible,

    (w)required elevators for use by firefighters are complete and tested as operational up to and including the storey immediately above the uppermost storey to be occupied,

    (x)a covered way is installed and complete over all required means of egress from the building, and all other areas on the property that can be accessed by occupants of the building, that,

    (i)has an unobstructed height of at least 2,400 mm,

    (ii)has an unobstructed width of at least the width of the means of egress,

    (iii)is capable of supporting any loads likely to be encountered as determined by a professional engineer, including snow loads and impact loads from construction,

    (iv)has a weather-tight roof,

    (v)has partitions with smooth surfaces on the side accessible to occupants,

    (vi)has adequate lighting within the covered way, and

    (vii)otherwise complies with the requirements in Articles 3.8.1.3., and 3.8.2.2. of Division B, as applicable, and

    (y)the requirements set out in Sentences (9) to (14) are complied with.

    (9)The person to whom a permit under section 8 of the Act is issued in respect of the building, and such other person as the chief building official determines, shall,

    (a)agree in writing with the municipality to assume all risk in occupying or authorizing the occupation of the building or part of it in accordance with this Article and comply with such other conditions as the chief building official considers necessary, including the provision of security, indemnities and evidence of insurance, and

    (b)submit to the chief building official,

    (i)a plan for phasing of construction and occupancy,

    (ii)a site safety plan addressing the means to ensure safety of the occupants and public while construction is ongoing, including,

    (A) measures to protect occupants and the public from risks associated with the lifting of heavy construction materials, elements and equipment,

    (B) measures for safeguarding occupant wellbeing while construction is ongoing, including the disposal of construction debris, noise, dust, odour, harmful airborne chemicals, non-airborne contaminants, pests and vibrations, including the transfer of vibrations from concrete pumping and pouring to the parts of the building to be occupied, and

    (C) measures to address risks, hazards and occupant comfort associated with the proximity of exterior crane masts, concrete pumping pipes and exterior hoists and their tie-back systems,

    (iii)a report from a professional engineer that attests,

    (A) to the adequacy of the measures to safeguard life, health and property,

    (B) that ongoing construction will not adversely impact the structural adequacy of the parts of the building to be occupied, and

    (C) that the design of the climbing barriers, fall protection systems and horizontal and vertical safety nets meets the requirements of Sentence (11),

    (iv)a report from a third-party professional engineer that has reviewed the adequacy of the measures to safeguard life, health and property, if that review is required by chief building official, and

    (v)the report arising from the review conducted in accordance with Sentence (12).

    (10)Measures described in Clause (8)(k) shall include,

    (a)providing heat, hot water, cold water, gas, electricity, plumbing or other utility services for the parts of the building to be occupied separate from the services that serve the parts of the building that are incomplete or still under construction,

    (b)providing access to the parts of the building to be occupied, including access for occupants, vehicles and deliveries, that is separate and independent from access to the parts of the building and site that are incomplete or still under construction,

    (c)ensuring that elevators that serve the parts of the building to be occupied are not used for construction,

    (d)ensuring that access to the construction area, including any construction staging and loading areas, shall be on a different face of the building than the access to and within the parts of the building to be occupied,

    (e)installing temporary or permanent physical barriers to protect the parts of the building to be occupied from falling machinery, equipment, tools, construction materials and any other material or debris, and

    (f)installing climbing physical barriers, fall protection and horizontal and vertical safety nets in accordance with Sentence (11).

    (11)The climbing physical barriers, fall protection systems and horizontal and vertical safety nets referred to in Clause (10)(f), shall,

    (a)in the case of horizontal fall protection systems and safety nets, extend not less than 3 m from the face of the building,

    (b)be installed where there is construction on the exterior of the building or a storey that is unenclosed, and

    (c)be located immediately below the storey where the construction is located.

    (12)Prior to occupancy, the construction of the parts of the building to be occupied shall be reviewed by a professional engineer or an architect in accordance with Article 1.2.2.1.

    (13)Where a registered code agency has been appointed to perform the functions described in clause 4.1(4)(b) or (c) of the Act in respect of the construction of the building, the chief building official or a person designated by the chief building official shall issue the permit referred to in Sentence (8) after receipt of a certificate for the occupancy of a building not fully completed issued by the registered code agency in respect of the building.

    (14)Where development charges in respect of a building or part of it are payable in accordance with subsection 26.1 (3.1) of the Development Charges Act, 1997, the development charges have been paid in accordance with that section.

    Open OBC Div. C 1.3.3.7. in the code viewer
  • OBC Div. C 1.3.3.3. Notification

    (1)Where a person has occupied or permitted the occupancy of a building under Article 1.3.3.1. or 1.3.3.2., such person shall notify the chief building official forthwith upon completion of the building.

    Open OBC Div. C 1.3.3.3. in the code viewer
  • OBC Div. C 1.3.4.1. Fire Department Approval

    (1)Subject to Sentence (2), if the council of a municipality assigns specific responsibility for the enforcement of any portion of this Code respecting fire safety matters to an inspector who is the chief of the fire department of the municipality, the chief building official shall not issue a permit to construct a building unless the inspector approves the drawings submitted with the application for the permit as complying with that portion of this Code.

    (2)If a registered code agency has been appointed under clause 4.1(4)(a) or (c) of the Act,

    (a)a municipality shall not assign responsibility under Sentence (1) to the chief of the fire department with respect to a building for which the registered code agency has been appointed, and

    (b)any assignment of responsibility under Sentence (1) with respect to a building for which the registered code agency is appointed shall be cancelled as of the date of the appointment.

    Open OBC Div. C 1.3.4.1. in the code viewer
  • OBC Div. C 1.3.5.1. Prescribed Notices

    (1)This Article sets out the notices that are required under section 10.2 of the Act.

    (2)The person to whom a permit under section 8 of the Act is issued shall notify the chief building official or, where a registered code agency is appointed under the Act in respect of the construction to which the notice relates, the registered code agency of,

    (a)readiness to construct footings,

    (b)substantial completion of footings and foundations prior to commencement of backfilling,

    (c)substantial completion of structural framing and ductwork and piping for heating and air-conditioning systems, if the building is within the scope of Part 9 of Division B,

    (d)substantial completion of structural framing and roughing-in of heating, ventilation, air-conditioning and air-contaminant extraction equipment, if the building is not a building to which Clause (c) applies,

    (e)substantial completion of insulation and vapour barriers,

    (f)substantial completion of air barrier systems,

    (g)substantial completion of all required fire separations and closures and all fire protection systems including standpipe, sprinkler, fire alarm and emergency lighting systems,

    (h)substantial completion of fire access routes,

    (i)readiness for inspection and testing of,

    (i)building sewers and building drains,

    (ii)water service pipes,

    (iii)fire service mains,

    (iv)drainage systems and venting systems,

    (v)the water distribution system, and

    (vi)plumbing fixtures and plumbing appliances,

    (j)readiness for inspection of suction and gravity outlets, covers and suction piping serving outlets of an outdoor pool described in Clause 1.3.1.1.(1)(j) of Division A, a public pool or a public spa,

    (k)substantial completion of the circulation / recirculation system of an outdoor pool described in Clause 1.3.1.1.(1)(j) of Division A, a public pool or public spa and substantial completion of the pool before it is first filled with water,

    (l)readiness to construct the sewage system,

    (m)substantial completion of the installation of the sewage system before the commencement of backfilling,

    (n)substantial completion of installation of plumbing not located in a structure, before the commencement of backfilling,

    (o)completion of construction and installation of components required to permit the issue of an occupancy permit under Sentence 1.3.3.1.(3) or to permit occupancy under Sentence 1.3.3.2.(1), if the building or part of the building to be occupied is not fully completed, and

    (p)completion of construction and installation of components required to permit the issue of an occupancy permit under Sentence 1.3.3.4.(4), 1.3.3.5.(3) or 1.3.3.7.(8).

    (q)completion of construction and installation of components required to permit the issue of an occupancy permit under Sentence 1.3.3.8.(2).

    Open OBC Div. C 1.3.5.1. in the code viewer
  • OBC Div. C 1.3.5.2. Additional Notices

    (1)A by-law, resolution or regulation made by a principal authority under clause 7(1)(e) of the Act may require that notice of one or more of the following stages of construction be given by the person to whom a permit is issued under section 8 of the Act:

    (a)commencement of construction of the building,

    (b)substantial completion of structural framing for each storey, if the building is a type of building that is within the scope of Division B, other than Part 9,

    (c)commencement of construction of,

    (i)masonry fireplaces and masonry chimneys,

    (ii)factory-built fireplaces and allied chimneys, or

    (iii)stoves, ranges, space heaters and add-on furnaces using solid fuels and allied chimneys,

    (d)substantial completion of interior finishes,

    (e)substantial completion of heating, ventilating, air-conditioning and air-contaminant extraction equipment,

    (f)substantial completion of exterior cladding,

    (g)substantial completion of site grading,

    (h)substantial completion of the pool deck and dressing rooms for a public pool or public spa and readiness for inspection of the emergency stop system for a public pool or public spa,

    (i)completion and availability of drawings of the building as constructed, and

    (j)completion of a building for which an occupancy permit is required under Article 1.3.3.4., 1.3.3.5. or 1.3.3.7. or 1.3.3.8.

    Open OBC Div. C 1.3.5.2. in the code viewer
  • OBC Div. C 1.3.5.3. Prescribed Inspections

    (1)Except as provided in Sentence (2), an inspector or registered code agency, as the case may be, shall, not later than two days after receipt of a notice given under Sentence 1.3.5.1.(2), undertake a site inspection of the building to which the notice relates.

    (2)Where a notice given under Sentence 1.3.5.1.(2) relates to matters described in Clause 1.3.5.1.(2)(l) or (m), an inspector or registered code agency, as the case may be, shall, not later than five days after receipt of the notice, undertake a site inspection of the sewage system to which the notice relates.

    (2.1)Where a notice given under Sentence 1.3.5.1.(2) relates to matters described in Clause 1.3.5.1.(2)(q), an inspector or registered code agency, as the case may be, shall, not later than ten days after receipt of the notice, undertake a site inspection of the building to which the notice relates.

    (3)When undertaking an inspection required under Sentence (1), (2) or (2.1), the inspector or registered code agency, as the case may be, may consider reports concerning whether the building or a part of the building complies with the Act or this Code.

    (4)For greater certainty, when undertaking an inspection required under Sentence (1), (2) or (2.1), the inspector or registered code agency, as the case may be, may choose to not attend at the physical site of the building and may instead undertake the inspection using other means.

    (5)The time periods referred to in Sentences (1), (2) and (2.1) shall begin on the day following the day on which the notice is given.

    (6)The time periods referred to in Sentences (1), (2) and (2.1) shall not include Saturdays, holidays and all other days when the offices of the principal authority are not open for the transaction of business with the public.

    Open OBC Div. C 1.3.5.3. in the code viewer
  • OBC Div. C 1.3.5.5. Orders

    (1)An order issued under subsection 12(2), 13(1) or (6), 14(1) or 15.10.1(2) or clause 18(1)(f) of the Act shall be in a form approved by the Minister.

    Open OBC Div. C 1.3.5.5. in the code viewer
  • OBC Div. C 1.3.6.1. Application

    (1)Where a by-law, resolution or regulation has been made by a principal authority under clause 7(1)(g) of the Act, the chief building official may require that as constructed plans for the whole of, or any part or system of, a building or any class of buildings be provided by the persons responsible for the construction.

    Open OBC Div. C 1.3.6.1. in the code viewer
  • OBC Div. C 1.3.7.2. Exemption

    (1)The construction of a temporary health or residential facility and the conversion of all or part of an existing building or structure to a temporary health or residential facility are exempt from the requirement to obtain a permit under section 8 of the Act or section 10 of the Act and are exempt from compliance with this Code.

    (2)As of March 31, 2027, the exemption set out in Sentence (1) shall no longer apply and the construction of a temporary health or residential facility or the conversion of all or part of an existing building or structure to a temporary health or residential facility is deemed to not comply with this Code unless a permit was issued under section 8 or 10 of the Act in respect of all or part of said building or structure.

    Open OBC Div. C 1.3.7.2. in the code viewer
  • OBC Div. C 1.3.7.4. Inspections

    (1)A chief building official or an inspector shall, in accordance with Sentence (2), undertake an inspection of the temporary health or residential facility pursuant to subsection 15.9(1) of the Act to determine whether the facility is unsafe as described in subsection 15.9(2) of the Act.

    (2)An inspection described in Sentence (1) shall be undertaken on or before a date that is not later than one month after the date of the previous inspection.

    (3)For greater certainty, for the purpose of Sentence (2), if the temporary health or residential facility was inspected in accordance with Ontario Regulation 332/12 (Building Code), the date of the previous inspection is the date that it was last inspected under that Regulation.

    (4)When undertaking an inspection required under Sentence (1), the inspector may consider reports concerning whether the temporary health or residential facility or part of the facility is unsafe as described in subsection 15.9(2) of the Act.

    Open OBC Div. C 1.3.7.4. in the code viewer
  • OBC Div. C 1.7.1.1. General

    (1)The boards of health and conservation authorities listed in Column 1 of Table 1.7.1.1. are prescribed, for the purposes of subsection 3.1(1) of the Act, as the boards of health and conservation authorities that are responsible for the enforcement of the provisions of the Act and this Code related to sewage systems in the municipalities and territory without municipal organization prescribed in Column 2 of Table 1.7.1.1.

    Open OBC Div. C 1.7.1.1. in the code viewer
  • OBC Div. C 1.8.1.1. Language Used on Required Signs

    (1)All required signs in this Code shall be displayed in the English language or in the English and French languages, including operational material on all life safety equipment and devices.

    Open OBC Div. C 1.8.1.1. in the code viewer
  • OBC Div. C 1.11.1.1. Scope

    (1)This Section applies to houses that,

    (a)have not more than one dwelling unit,

    (b)are 37 m² or less in building area, and

    (c)are to be,

    (i)partially constructed in one municipality and moved to be installed at a location in another municipality without having been previously occupied, or

    (ii)partially constructed at one location and moved to be installed at a location that is not yet known without having been previously occupied.

    (2)Except as provided in this Section, the requirements in this Part apply to houses described in Sentence (1).

    Open OBC Div. C 1.11.1.1. in the code viewer
  • OBC Div. C 1.11.1.2. Permits

    (1)Provided the conditions described in Sentence (2) are complied with, if an applicant for a permit under section 8 of the Act makes an application to the chief building official of the municipality in which a house is to be partially constructed but not installed, the applicant is exempt from demonstrating compliance with,

    (a)either,

    (i)if the application is for a permit described in subsection 8(1) of the Act, clause 8(2)(a) of the Act but only with respect to demonstrating compliance with applicable law, or

    (ii)if the application is for a conditional permit described in subsection 8(3) of the Act, clause 8(3)(a) of the Act, and

    (b)requirements of this Code related to site installation of the house.

    (2)For a permit applicant to be exempt from the provisions described in Sentence (1), the following conditions must be satisfied:

    1. If the site the house is intended to be installed on is known by the permit applicant,

    (i) the permit application must state the address or location of the site,

    (ii) the permit application must include such information about the anticipated site installation that is necessary to design the house, and

    (iii) the proposed construction must comply with the location-dependent requirements of this Code that are applicable to a house that is constructed at that address or location.

    2. If the site the house is intended to be installed on is not known by the permit applicant,

    (i) the permit application must include a declaration of assumptions related to the location of the house that have been used in the design of the house,

    (ii) the permit application must include such information about the anticipated site installation that is necessary to design the house, and

    (iii) the proposed construction must comply with the location-dependent requirements of this Code that are applicable to a house that is constructed at a location that has the characteristics set out in the declaration.

    (3)For the purposes of paragraphs 1 and 2 of Sentence (2), “location-dependent requirements” include, but are not limited to, provisions related to climatic loads, seismic loads, temperature based requirements, limiting distance and exposing building face, soil gas control and firefighting access.

    (4)An applicant for a permit described in Sentence (1) shall provide the following to a purchaser of a house constructed in accordance with a permit described in Sentence (1):

    (1) all plans, specifications, documents and other information submitted or received by the person described in Sentence (1) in respect of the permit described in Sentence (1), including any as-constructed plans and any declaration of assumptions described in subparagraph 2.i. of Sentence (2), and

    (2) all letters of compliance described in Sentence 1.11.1.3.(3) and all documents and other information received by the person described in Sentence (1) in respect of all inspections completed by an inspector or registered code agency, as the case may be.

    (5)No person shall install a house at a site in a municipality unless a permit under section 8 of the Act has been issued therefor by the chief building official of that municipality.

    (6)The chief building official of the municipality in which the house is to be installed shall issue the permit described in Sentence (5) if the applicant,

    (a)demonstrates the proposed construction complies with the applicable provisions described in Clauses (1)(a) and

    (b)

    (b) demonstrates compliance with the other requirements of section 8 of the Act, and

    (c)submits all plans, specifications, documents and other information described in Sentence (4) that the applicant has been provided.

    (7)For the purposes of an application for a permit described in Sentence (5), the time periods described in Sentences 1.3.1.3.(1) and (3) and Clause 1.3.1.3.(6)(b) shall begin on the later of,

    (a)the date the permit described in Sentence (1) is issued, or

    (b)the date described in Sentence 1.3.1.3.(7).

    Open OBC Div. C 1.11.1.2. in the code viewer
  • OBC Div. C 1.11.1.3. Inspections

    (1)Where a permit is applied for as described in Sentence 1.11.1.2.(1) or (5), the person to whom a permit under section 8 of the Act is issued shall give notice as described in Articles 1.3.5.1. and 1.3.5.2. to the chief building official or registered code agency, as the case may be, of the municipality who issued the permit in respect of the construction to which the notice relates.

    (2)Where a permit is applied for as described in Sentence 1.11.1.2.(5), the person to whom a permit under section 8 of the Act is issued shall provide the chief building official of the municipality in which the house is to be installed,

    (a)any additional letters of compliance, documents or other information related to inspections completed by an inspector or registered code agency, as the case may be, of the municipality in which the house was partially constructed that was not provided when the permit was applied for, or

    (b)confirmation that no additional letters of compliance, documents or other information have been provided to the person.

    (3)The chief building official of the municipality in which a house was partially constructed but not installed shall provide the person to whom a permit was issued with a letter of compliance that confirms,

    (a)which prescribed notices described in Sentence 1.3.5.1.(2) were received by the chief building official or registered code agency, as the case may be,

    (b)that inspections described in Sentence 1.3.5.3.(1) were undertaken in respect of the construction to which the notices relate, and

    (c)that no contraventions of the Act or this Code were found or that remedial steps were carried out to resolve any contraventions that were found.

    Open OBC Div. C 1.11.1.3. in the code viewer
  • OBC Div. C 1.12.1.1. Certification and Compliance

    (1)Except as provided in Sentence (2), a manufactured building or a manufactured part of a building within the scope of Part 3 is deemed to comply with this Code if it is certified in accordance with CSA A277, “Procedure for Certification of Prefabricated Buildings, Modules, and Panels.”

    (2)The requirements of this Code shall apply to,

    (a)building components designed and constructed outside the place of manufacture, and

    (b)site installation of such buildings.

    Open OBC Div. C 1.12.1.1. in the code viewer