Values this chapter turns on
- static pressure above which a PRV is required
- 550 kPa
- static pressure above which a PRV is required
- tank temperature the relief valve must prevent
- 99°C
- tank temperature the relief valve must prevent
- minimum size of a water service pipe
- NPS 3/4
- minimum size of a water service pipe
- minimum air gap, and twice the outlet diameter
- 25 mm
- minimum air gap, and twice the outlet diameter
Section 7.6. covers the water side of the house: valves, relief valves, backflow protection, pipe sizing and water efficiency. The house syllabus drops the public washroom and flushing device articles, most fire sprinkler backflow rules, and all of Section 7.7. non-potable systems. Expect lookups on valves and relief valves, scenarios on backflow, and a fixture unit sizing calculation.
Arrangement of piping, shut-off and relief valves
Design (OBC Div. B 7.6.1.1.OBC Div. B 7.6.1.1. Design(1) Fixtures supplied with separate hot and cold water controls shall have the hot water control on the left and the cold on the right. (1.1) Where hot and cold water are mixed and the temperature is regulated by a single, unmarked, manual control, a movement to the left shall increase the temperature and a movement…): with separate controls, hot is on the left and cold on the right. A single unmarked lever turns left for hotter. A hot water system with a developed length over 30 m, or supplying more than 4 storeys, must keep temperature by recirculation or self-regulating heat tracing.
The system must be drainable or able to be blown out with air (7.6.1.2.OBC Div. B 7.6.1.2. Drainage(1) A water distribution system shall be installed so that the system can be drained or blown out with air and outlets for this purpose shall be provided.).
Valves (OBC Div. B 7.6.1.3.OBC Div. B 7.6.1.3. Control and Shut-Off Valves(1) A building control valve shall be provided (a) on every water service pipe at the location where the water service pipe enters the building, or (b) on the water distribution system at a location immediately downstream of the point of entry treatment unit, where the building is served by a point of entry treatment…):
| Location | Requirement |
|---|---|
| Where the water service enters the building | building control valve (or just downstream of an in-building point of entry treatment unit) |
| Just downstream of the building control valve (or meter) | drain port; for a valve of NPS 1 or smaller, it may be a stop and waste valve |
| Water closet supply | shut-off valve |
| Supply to a hot water tank | shut-off valve close to the tank |
| Each dwelling unit in a multi-unit residential building | shut-off where the supply enters the unit |
| Plastic water service pipe | brought up inside the building 300 mm to 450 mm for identification |
Also: every pipe supplying a hot water tank, pressure vessel, plumbing appliance or water using device gets a shut-off valve close to it (7.6.1.3B.OBC Div. B 7.6.1.3B. Tanks(1) Every water pipe that supplies a hot water tank, pressure vessel, plumbing appliance or water using device shall be provided with a shut-off valve located close to the tank, pressure vessel, plumbing appliance or water using device.). Exterior hose supplies through a wall need a frost-proof hydrant or a stop-and-waste cock inside near the wall (7.6.1.4.OBC Div. B 7.6.1.4. Protection for Exterior Water Supply(1) Pipes that pass through an exterior wall to supply water to the exterior of the building shall be provided with (a) a frost-proof hydrant, or (b) a stop-and-waste cock located inside the building and close to the wall.). A plastic water service rated for cold water only needs a check valve at the building end (7.6.1.5.OBC Div. B 7.6.1.5. Check Valves(1) A check valve shall be installed at the building end of a water service pipe where the pipe is made of plastic that is suitable for cold water use only.). Where thermal expansion can occur, that check valve needs thermal expansion protection (7.6.1.11.OBC Div. B 7.6.1.11. Thermal Expansion(1) Where thermal expansion can occur, protection shall be provided for (a) check valves required by Article 7.6.1.5., (b) backflow preventers required by Sentence 7.6.2.1.(3), and (c) pressure-reducing valves required by Article 2.6.3.3. (See Note A-7.6.1.11.(1))).
Relief valves (OBC Div. B 7.6.1.7.OBC Div. B 7.6.1.7. Relief Valves(1) Every pressure vessel that is part of a plumbing system or connected to a plumbing system shall be equipped with a pressure-relief valve designed to open when the water pressure in the tank reaches the rated working pressure of the tank, and so located that the pressure in the tank shall not exceed 1,100 kPa or…):
| Item | Requirement |
|---|---|
| Pressure vessel relief valve | keeps tank pressure at or below 1,100 kPa or half the tank's maximum test pressure, whichever is less |
| Temperature sensing element | within the top 150 mm of the tank |
| Temperature limit | keeps water from exceeding 99°C |
| Discharge pipe | at least valve outlet size, rigid, sloped down, no thread at the outlet, rated for 99°C |
| Discharge termination | indirect, over a floor drain, sump or safe place, air break not more than 300 mm |
| Valves on the relief line | none allowed between tank and relief valve, or on the discharge |
Provision is also needed against water hammer (7.6.1.9.OBC Div. B 7.6.1.9. Water Hammer(1) Provision shall be made to protect the water distribution system from the adverse effects of water hammer. (See Note A-7.6.1.9.(1))).
Protection from contamination and backflow
Connections must not let non-potable water into the system (7.6.2.1.OBC Div. B 7.6.2.1. Connection of Systems(1) Connections to potable water systems shall be designed and installed so that non-potable water or substances that may render the water non-potable cannot enter the system. (2) Reserved. (3) Backflow preventers shall be selected and installed in conformance with CSA B64.10, "Selection and installation of backflow…), and backflow preventers are selected and installed to CSA B64.10. A potable system must not be connected to another potable system served from a drinking water system without the purveyor's consent.
- A fixture or tank not under pressure above atmospheric needs back-siphonage protection. A supply to a boiler, tank, cooling jacket, lawn sprinkler system or similar device needs backflow protection (OBC Div. B 7.6.2.2.OBC Div. B 7.6.2.2. Back-Siphonage(1) Every potable water system that supplies a fixture or tank that is not subject to pressures above atmospheric shall be protected against back-siphonage by a backflow preventer. (2) Where a potable water supply is connected to a boiler, tank, cooling jacket, lawn sprinkler system or other device where a non-potable…).
- Tank-type water closets need an anti-siphon fill valve (7.6.2.11.OBC Div. B 7.6.2.11. Tank-Type Water Closets(1) Tank-type water closets shall be provided with a back-siphonage preventer in conformance with Sentence 7.2.10.10.(2).).
- A hose bibb outside, in a garage or in an area with an identifiable contamination risk needs backflow protection (7.6.2.7.OBC Div. B 7.6.2.7. Hose Bibb(1) Where a hose bibb is installed outside a building, inside a garage or in an area where there is an identifiable risk of contamination, the potable water system shall be protected against backflow through the hose bibb.).
- A residential full flow-through sprinkler system built of potable water materials needs no backflow preventer (7.6.2.4.(1)OBC Div. B 7.6.2.4. Backflow from Fire Protection Systems(1) A backflow preventer shall not be required in residential full flow-through fire sprinkler/standpipe systems in which the pipes and fittings are constructed of potable water system materials. (2) Except as required by Sentence (4), potable water system connections to fire sprinkler and standpipe systems shall be…).
- Part 9 residential buildings need no premise isolation unless they have access to an auxiliary water supply (7.6.2.6.(2)OBC Div. B 7.6.2.6. Premise Isolation(1) Buildings or facilities where a moderate hazard or severe hazard may be caused by backflow shall be provided with premise isolation of the potable water system by the installation of a backflow preventer selected in accordance with Clauses 5.3.4.2.(b) and (c) of CSA B64.10, "Selection and installation of backflow…).
- New potable piping is cleaned and flushed with potable water before use (7.6.2.8.OBC Div. B 7.6.2.8. Cleaning of Systems(1) A newly installed part of a potable water system shall be cleaned and then flushed with potable water before the system is put into operation. (See Note A-7.6.2.8.(1))).
| Device | Height rule |
|---|---|
| Air gap | at least 25 mm and at least twice the outlet opening diameter (7.6.2.9.OBC Div. B 7.6.2.9. Air Gap(1) An air gap shall not be located in a noxious environment. (2) Air gaps shall be not less than 25 mm high and at least twice the diameter of the opening of the water supply outlet in height.) |
| Atmospheric vacuum breaker | critical level at least 25 mm above the flood level rim (or the manufacturer's distance if greater); downstream of the last valve; not under pressure more than 12 h at a time (7.6.2.10.OBC Div. B 7.6.2.10. Vacuum Breakers(1) Where the critical level is not marked on an atmospheric vacuum breaker, pressure vacuum breaker or spill-resistant pressure vacuum breaker, the critical level shall be taken as the lowest point on the device. (2) Where an atmospheric vacuum breaker is installed, it shall be located on the downstream side of the…) |
| Pressure vacuum breaker | critical level at least 300 mm above the flood level rim |
If the critical level is not marked, take the lowest point of the device.
Size and capacity of pipes
Systems must deliver peak demand flow at the pressures the fittings need (7.6.3.1.OBC Div. B 7.6.3.1. Design, Fabrication and Installation(1) Water distribution systems shall be designed to provide peak demand flow when the flow pressures at the supply openings conform to the plumbing supply fitting manufacturer's specifications. (2) Potable water systems shall be designed, fabricated and installed in accordance with good engineering practice, such as…). Where static pressure at any fixture may exceed 550 kPa, a pressure-reducing valve limits it to 550 kPa (OBC Div. B 7.6.3.3.OBC Div. B 7.6.3.3. Static Pressure(1) Where the static pressure at any fixture may exceed 550 kPa, a pressure-reducing valve shall be installed to limit the maximum static pressure at the fixture to 550 kPa.).
Size rules (OBC Div. B 7.6.3.4.OBC Div. B 7.6.3.4. Size(1) Water service pipes shall be sized according to the peak demand flow but shall not be less than NPS3/4 . (2) Except as provided in Sentence (3), the nominal pipe size of a supply pipe that serves a fixture shall conform to Table 7.6.3.2.-A. (3) For fixtures listed in Table 7.6.3.2.-A that are permitted to have an…):
- Water service pipe: sized to peak demand, never less than NPS 3/4.
- Fixture supply pipe: per Table 7.6.3.2.-A. Where NPS 3/8 is allowed, a connector up to 750 mm long and at least NPS 1/4 may be used.
- Piping from the service or meter to the first pipe feeding a water heater that serves more than one fixture: at least NPS 3/4.
- One- and two-unit houses may be sized with Table 7.6.3.4. if loads are taken at 100%, entry pressure is at least 200 kPa and total system length is at most 90 m.
- A single-unit house may have an NPS 3/4 water service if NPS 3/4 piping runs to the base of each riser serving one bathroom group and the total load is not more than 26 fixture units.
Supply fixture units come from Table 7.6.3.2.-AOBC Div. B Table 7.6.3.2-A. Sizing of Water Distribution Systems[1][2]Table 7.6.3.2.-A — Sizing of Water Distribution Systems[1][2] Forming Part of Sentences 7.6.3.2.(1), (2) and (3) and 7.6.3.4.(2), (3) and (5) Fixture or Device | Minimum Nominal Pipe Size of Supply Pipe, NPS | Private Use Hydraulic Load, fixture units: Cold | Private Use Hydraulic Load, fixture units: Hot | Private…, private use "Total" column for a house. Unlisted fixtures use Table 7.6.3.2.-DOBC Div. B Table 7.6.3.2-D. Hydraulic Loads of Fixtures Not Listed in Table 7.6.3.2.-ATable 7.6.3.2.-D — Hydraulic Loads of Fixtures Not Listed in Table 7.6.3.2.-A Forming Part of Sentences 7.6.3.2.(2) and (3) and 7.6.3.4.(5) Nominal Pipe Size of Supply Pipe, NPS | Hydraulic Load, fixture units — Private Use | Hydraulic Load, fixture units — Public Use ⅜ | 1 | 2 ½ | 2 | 4 ¾ | 3 | 6 1 | 6 | 10 by supply pipe size.
| Fixture (private use) | Total FU |
|---|---|
| Bathroom group, 6 LPF flush tank | 3.6 |
| Water closet, 6 LPF or less, flush tank | 2.2 |
| Lavatory, 8.3 LPM or less | 0.7 |
| Bathtub with or without shower head | 1.4 |
| Kitchen sink, domestic, 8.3 LPM or less | 1.4 |
| Dishwasher, domestic | 1.4 |
| Clothes washer, 3.5 kg | 1.4 |
| Laundry sink | 1.4 |
| Hose bibb, NPS 1/2 | 2.5 |
Worked example: sizing a house main
One bathroom group (3.6), a kitchen sink (1.4), dishwasher (1.4), clothes washer (1.4), laundry sink (1.4) and two NPS 1/2 hose bibbs (2 x 2.5 = 5.0) give 14.2 fixture units. In Table 7.6.3.4.OBC Div. B Table 7.6.3.4. Hydraulic Load, Fixture UnitsTable 7.6.3.4. — Hydraulic Load, Fixture Units Forming Part of Sentence 7.6.3.4.(5) Nominal Pipe Size of Water Pipe, NPS | Water Velocity, 3.0 m/s[1]: Hydraulic Load, fixture units | Water Velocity, 2.4 m/s[1]: Hydraulic Load, fixture units | Water Velocity, 1.5 m/s[1]: Hydraulic Load, fixture units ½ | 8 | 7 | 4 ¾ |… at 2.4 m/s, NPS 3/4 carries 16 FU, so NPS 3/4 works. At 1.5 m/s, NPS 3/4 only carries 9, so NPS 1 (18) would be needed. The velocity column you use follows the pipe manufacturer's recommended maximum (7.6.3.5.OBC Div. B 7.6.3.5. Velocity(1) The maximum permitted water velocities shall be those recommended by the pipe and fitting manufacturer.).
Where a detailed engineering design is used for fixtures with both hot and cold supply, the separate hot and cold demands may be taken at 75% of the fixture unit value (7.6.3.2.(3)OBC Div. B 7.6.3.2. Hydraulic Load(1) Except as provided in Sentence (3), the hydraulic load of a fixture or device that is listed in Table 7.6.3.2.-A shall be the number of fixture units given in the Table. (2) Except as provided in Sentences (1) and (3), the hydraulic load of a fixture that is not listed in Table 7.6.3.2.-A is the number of fixture…).
Water efficiency
An automatic compensating valve serving one shower head must have a manufacturer's minimum rated flow equal to or less than the shower head it serves (OBC Div. B 7.6.4.1.(2)OBC Div. B 7.6.4.1. Water Supply Fittings(1) Each lavatory in a washroom with fixtures for public use shall be equipped with a device capable of automatically shutting off the flow of water when the lavatory is not in use. (See Note A-7.6.4.1.(1) and (3)) (2) An automatic compensating valve serving an individual shower head shall have a manufacturer's…). Part 12 points back to Subsection 7.6.4. for all buildings.
Common traps
- Placing the drain port upstream of the building control valve. It goes downstream.
- Using the public use column of Table 7.6.3.2.-A for a house.
- Forgetting that the 300 mm relief valve air break is a maximum, not a minimum.
- Mixing the 25 mm atmospheric vacuum breaker height with the 300 mm pressure vacuum breaker height.
Chapter review
Chapter at a glance
One line per section: the idea to carry into the exam. Then the answers that most often catch candidates out.
- Arrangement of piping, shut-off and relief valves
Design: with separate controls, hot is on the left and cold on the right.
- Protection from contamination and backflow
Connections must not let non-potable water into the system, and backflow preventers are selected and installed to CSA B64.10. A potable system must not be connected to another…
- Size and capacity of pipes
Systems must deliver peak demand flow at the pressures the fittings need.
- Water efficiency
An automatic compensating valve serving one shower head must have a manufacturer's minimum rated flow equal to or less than the shower head it serves.
Usual exam traps
- Placing the drain port upstream of the building control valve. It goes downstream.
- Using the public use column of Table 7.6.3.2.-A for a house.
- Forgetting that the 300 mm relief valve air break is a maximum, not a minimum.
- Mixing the 25 mm atmospheric vacuum breaker height with the 300 mm pressure vacuum breaker height.
Practice this chapter
Questions on Potable water systems (7.6), in the exam format, every answer explained and cited to its article. Sign in to start; a free account gets the free questions.
Code cited in this chapter
Based on the official 2024 Building Code Compendium on ontario.ca.
© King's Printer for Ontario, 2024. Reproduced with permission.
OBC Div. B 7.6.1.1. Design
Open OBC Div. B 7.6.1.1. in the code viewer(1)Fixtures supplied with separate hot and cold water controls shall have the hot water control on the left and the cold on the right.
(1.1)Where hot and cold water are mixed and the temperature is regulated by a single, unmarked, manual control, a movement to the left shall increase the temperature and a movement to the right shall decrease the temperature.
(2)In a hot water distribution system of a developed length of more than 30 m or supplying more than 4 storeys, the water temperature shall be maintained by
(a)recirculation, or
(b)a self-regulating heat tracing system.
OBC Div. B 7.6.1.2. Drainage
Open OBC Div. B 7.6.1.2. in the code viewer(1)A water distribution system shall be installed so that the system can be drained or blown out with air and outlets for this purpose shall be provided.
OBC Div. B 7.6.1.3. Control and Shut-Off Valves
Open OBC Div. B 7.6.1.3. in the code viewer(1)A building control valve shall be provided
(a)on every water service pipe at the location where the water service pipe enters the building, or
(b)on the water distribution system at a location immediately downstream of the point of entry treatment unit, where the building is served by a point of entry treatment unit located in the building.
(2)Pipes that convey water from a gravity water tank or from a private water supply system shall be fitted with a shut-off valve at the source of supply.
(2.1)Except as provided in Sentence (2.2), a drain port shall be provided on the water distribution system immediately downstream of the building control valve required by Sentence (1) and if there is a meter, the drain port shall be installed immediately downstream of the meter on the water distribution system.
(2.2)Where the building control valve required by Sentence (1) is of NPS 1 or smaller, the drain port may be an integral part of the building control valve in the form of a stop and waste valve and the drain port shall be located on the water distribution system side of the stop and waste valve.
(3)Except for risers that serve only one dwelling unit, risers shall be provided with a shut-off valve located at the source of supply.
(4)Water closets shall be provided with a shut-off valve on their water supply pipe.
(5)In buildings of residential occupancy that contain more than one dwelling unit, a shut-off valve shall be installed where the water supply enters each dwelling unit, so that, when the water supply to one suite is shut off, the water supply to the remainder of the building is not interrupted.
(6)In buildings of other than residential occupancy, shut-off valves shall be provided on the water supply to
(a)every fixture, or
(b)any group of fixtures in the same room, except as provided in Sentence (4).
(7)Pipes that supply water to a hot water tank shall be provided with a shut-off valve located close to the tank.
(8)Where the water supply is to be metered, the installation of the meter, including the piping that is part of the meter installation and the valving arrangement for the meter installation, shall be according to the water purveyor's requirements.
(9)For the purpose of identifying the pipe material where plastic water pipe is used underground for a service pipe, the end of the pipe inside the building shall be brought above ground for a distance not less than 300 mm and not greater than 450 mm.
OBC Div. B 7.6.1.3B. Tanks
Open OBC Div. B 7.6.1.3B. in the code viewer(1)Every water pipe that supplies a hot water tank, pressure vessel, plumbing appliance or water using device shall be provided with a shut-off valve located close to the tank, pressure vessel, plumbing appliance or water using device.
OBC Div. B 7.6.1.4. Protection for Exterior Water Supply
Open OBC Div. B 7.6.1.4. in the code viewer(1)Pipes that pass through an exterior wall to supply water to the exterior of the building shall be provided with
(a)a frost-proof hydrant, or
(b)a stop-and-waste cock located inside the building and close to the wall.
OBC Div. B 7.6.1.5. Check Valves
Open OBC Div. B 7.6.1.5. in the code viewer(1)A check valve shall be installed at the building end of a water service pipe where the pipe is made of plastic that is suitable for cold water use only.
OBC Div. B 7.6.1.11. Thermal Expansion
Open OBC Div. B 7.6.1.11. in the code viewer(1)Where thermal expansion can occur, protection shall be provided for
(a)check valves required by Article 7.6.1.5.,
(b)backflow preventers required by Sentence 7.6.2.1.(3), and
(c)pressure-reducing valves required by Article 2.6.3.3. (See Note A-7.6.1.11.(1))
OBC Div. B 7.6.1.7. Relief Valves
Open OBC Div. B 7.6.1.7. in the code viewer(1)Every pressure vessel that is part of a plumbing system or connected to a plumbing system shall be equipped with a pressure-relief valve designed to open when the water pressure in the tank reaches the rated working pressure of the tank, and so located that the pressure in the tank shall not exceed 1,100 kPa or one-half the maximum test pressure sustained by the tank, whichever is the lesser.
(2)The hot water tank of a storage-type service water heater shall be equipped with a temperature-relief valve with a temperature-sensing element
(a)located within the top 150 mm of the tank, and
(b)designed to open and discharge sufficient water from the tank to keep the temperature of the water in the tank from exceeding 99°C under all operating conditions.
(3)A pressure-relief valve and temperature-relief valve may be combined where Sentences (1) and (2) are complied with.
(4)Indirect service water heaters shall be equipped with
(a)a pressure-relief valve, and
(b)a temperature-relief valve on every storage tank that forms part of the system.
(5)Pipes that convey water from a temperature-relief, pressure-relief, or a combined temperature- and pressure-relief valve shall
(a)be of a nominal pipe size at least equal to the NPS of the outlet of the valve,
(b)be rigid, slope downward from the valve, and terminate with an indirect connection above a floor drain, sump, or other safe location, with an air break of not more than 300 mm,
(c)have no thread at its outlet, and
(d)be capable of operating at a temperature of not less than 99°C. (See Note A-7.6.1.7.(5))
(6)The temperature-relief valve required in Clause (4)(b) shall
(a)have a temperature-sensing element located within the top 150 mm of the tank, and
(b)be designed to open and discharge sufficient water to keep the temperature of the water in the tank from exceeding 99°C under all operating conditions.
(7)No shut-off valve shall be installed on the pipe between any tank and the relief valves or on the discharge lines from such relief valves.
Show all 27 articles
OBC Div. B 7.6.1.9. Water Hammer
Open OBC Div. B 7.6.1.9. in the code viewer(1)Provision shall be made to protect the water distribution system from the adverse effects of water hammer. (See Note A-7.6.1.9.(1))
OBC Div. B 7.6.2.1. Connection of Systems
Open OBC Div. B 7.6.2.1. in the code viewer(1)Connections to potable water systems shall be designed and installed so that non-potable water or substances that may render the water non-potable cannot enter the system.
(2)Reserved.
(3)Backflow preventers shall be selected and installed in conformance with CSA B64.10, "Selection and installation of backflow preventers."
(3.1)No connection shall be made between a potable water system supplied with water from a drinking water system and any other potable water system without the consent of the water purveyor.
OBC Div. B 7.6.2.2. Back-Siphonage
Open OBC Div. B 7.6.2.2. in the code viewer(1)Every potable water system that supplies a fixture or tank that is not subject to pressures above atmospheric shall be protected against back-siphonage by a backflow preventer.
(2)Where a potable water supply is connected to a boiler, tank, cooling jacket, lawn sprinkler system or other device where a non-potable fluid may be under pressure that is above atmospheric or the water outlet may be submerged in the non-potable fluid, the water supply shall be protected against backflow by a backflow preventer.
OBC Div. B 7.6.2.11. Tank-Type Water Closets
Open OBC Div. B 7.6.2.11. in the code viewer(1)Tank-type water closets shall be provided with a back-siphonage preventer in conformance with Sentence 7.2.10.10.(2).
OBC Div. B 7.6.2.7. Hose Bibb
Open OBC Div. B 7.6.2.7. in the code viewer(1)Where a hose bibb is installed outside a building, inside a garage or in an area where there is an identifiable risk of contamination, the potable water system shall be protected against backflow through the hose bibb.
OBC Div. B 7.6.2.4. Backflow from Fire Protection Systems
Open OBC Div. B 7.6.2.4. in the code viewer(1)A backflow preventer shall not be required in residential full flow-through fire sprinkler/standpipe systems in which the pipes and fittings are constructed of potable water system materials.
(2)Except as required by Sentence (4), potable water system connections to fire sprinkler and standpipe systems shall be protected against backflow caused by back-siphonage or back pressure in conformance with Clauses (a) to (g), as applicable:
(a)residential partial flow-through fire sprinkler/standpipe systems in which the pipes and fittings are constructed of potable water system materials shall be protected by a dual check valve backflow preventer conforming to
(i)CSA B64.6, "Dual check valve (DuC) backflow preventers," or
(ii)CSA B64.6.1, "Dual check valve backflow preventers for fire protection systems (DuCF),"
(b)provided that the systems do not use antifreeze or other additives of any kind and that all pipes and fittings are constructed of potable water system materials, Class 1 fire sprinkler/standpipe systems shall be protected by a single or dual check valve backflow preventer conforming to
(i)CSA B64.6, "Dual check valve (DuC) backflow preventers," or
(ii)CSA B64.9, "Single check valve backflow preventers for fire protection systems (SCVAF),"
(c)provided that the systems do not use antifreeze or other additives of any kind, Class 1 fire sprinkler/standpipe systems not covered by Clause (b) as well as Class 2 and Class 3 fire sprinkler/standpipe systems shall be protected by a double check valve backflow preventer conforming to
(i)CSA B64.5, "Double check valve (DCVA) backflow preventers," or
(ii)CSA B64.5.1, "Double check valve backflow preventers for fire protection systems (DCVAF),"
(d)Class 1, Class 2 or Class 3 fire sprinkler/standpipe systems in which antifreeze or other additives are used shall be protected by a reduced pressure principle backflow preventer conforming to
(i)CSA B64.4, "Reduced pressure principle (RP) backflow preventers," or
(ii)CSA B64.4.1, "Reduced pressure principle backflow preventers for fire protection systems (RPF)," installed on the portion of the system that uses the additives and the balance of the system shall be protected as required by Clause (b) or (c),
(e)Class 4 and Class 5 fire sprinkler/standpipe systems shall be protected by a reduced pressure principle backflow preventer conforming to
(i)CSA B64.4, "Reduced pressure principle (RP) backflow preventers," or
(ii)CSA B64.4.1, "Reduced pressure principle backflow preventers for fire protection systems (RPF),"
(f)Class 6 fire sprinkler/standpipe systems shall be protected by a double check valve backflow preventer conforming to
(i)CSA B64.5, "Double check valve (DCVA) backflow preventers," or
(ii)CSA B64.5.1, "Double check valve backflow preventers for fire protection systems (DCVAF)."
(g)where a potentially severe health hazard may be caused by backflow, Class 6 fire sprinkler/standpipe systems shall be protected by a reduced pressure principle backflow preventer conforming to
(i)CSA B64.4, "Reduced pressure principle (RP) backflow preventers," or
(ii)CSA B64.4.1, "Reduced pressure principle backflow preventers for fire protection systems (RPF)."
(3)Backflow preventers required by Sentence (2) shall be installed upstream of the fire department pumper connection.
(4)Where a reduced pressure principle backflow preventer is required on a water service pipe at a fire service connection located on the same premises as the fire service pipe in Class 3, 4, 5 and 6 fire sprinkler/standpipe systems, a reduced pressure principle backflow preventer conforming to CSA B64.4.1, "Reduced pressure principle backflow preventers for fire protection systems (RPF)," shall also be required on the fire service connection.
OBC Div. B 7.6.2.6. Premise Isolation
Open OBC Div. B 7.6.2.6. in the code viewer(1)Buildings or facilities where a moderate hazard or severe hazard may be caused by backflow shall be provided with premise isolation of the potable water system by the installation of a backflow preventer selected in accordance with Clauses 5.3.4.2.(b) and (c) of CSA B64.10, "Selection and installation of backflow preventers."
(2)Buildings of residential occupancy within the scope of Part 9 are not required to be isolated unless they have access to an auxiliary water supply.
(3)Except as provided in Sentence (1), where no direct connection exists between the auxiliary water supply and the potable water system, premise isolation shall be provided by a dual check valve backflow preventer conforming to CSA B64.6, "Dual check valve (DuC) backflow preventers."
OBC Div. B 7.6.2.8. Cleaning of Systems
Open OBC Div. B 7.6.2.8. in the code viewer(1)A newly installed part of a potable water system shall be cleaned and then flushed with potable water before the system is put into operation. (See Note A-7.6.2.8.(1))
OBC Div. B 7.6.2.9. Air Gap
Open OBC Div. B 7.6.2.9. in the code viewer(1)An air gap shall not be located in a noxious environment.
(2)Air gaps shall be not less than 25 mm high and at least twice the diameter of the opening of the water supply outlet in height.
OBC Div. B 7.6.2.10. Vacuum Breakers
Open OBC Div. B 7.6.2.10. in the code viewer(1)Where the critical level is not marked on an atmospheric vacuum breaker, pressure vacuum breaker or spill-resistant pressure vacuum breaker, the critical level shall be taken as the lowest point on the device.
(2)Where an atmospheric vacuum breaker is installed, it shall be located on the downstream side of the fixture control valve or faucet so that it will be subject to water supply pressure
(a)only when the valve or faucet is open, and
(b)for periods of continuous use not exceeding 12 h.
(3)An atmospheric vacuum breaker shall be installed so that the critical level is at least the distance specified by the manufacturer for safe operation of the device, but not less than 25 mm above
(a)the flood level rim of a fixture or tank, or
(b)the highest point open to the atmosphere in an irrigation system.
(4)A pressure vacuum breaker or spill-resistant pressure vacuum breaker shall be installed so that the critical level is not less than 300 mm above
(a)the flood level rim of a fixture or tank, or
(b)the highest point open to the atmosphere in an irrigation system.
OBC Div. B 7.6.3.1. Design, Fabrication and Installation
Open OBC Div. B 7.6.3.1. in the code viewer(1)Water distribution systems shall be designed to provide peak demand flow when the flow pressures at the supply openings conform to the plumbing supply fitting manufacturer's specifications.
(2)Potable water systems shall be designed, fabricated and installed in accordance with good engineering practice, such as that described in the ASHRAE Handbooks and ASPE Plumbing Engineering Design Handbooks.
(3)Reserved.
(4)Pipes that supply a fixture shall have a capacity that will produce a flow in the fixture that will flush the fixture and keep it in a sanitary condition.
OBC Div. B 7.6.3.3. Static Pressure
Open OBC Div. B 7.6.3.3. in the code viewer(1)Where the static pressure at any fixture may exceed 550 kPa, a pressure-reducing valve shall be installed to limit the maximum static pressure at the fixture to 550 kPa.
OBC Div. B 7.6.3.4. Size
Open OBC Div. B 7.6.3.4. in the code viewer(1)Water service pipes shall be sized according to the peak demand flow but shall not be less than NPS3/4 .
(2)Except as provided in Sentence (3), the nominal pipe size of a supply pipe that serves a fixture shall conform to Table 7.6.3.2.-A.
(3)For fixtures listed in Table 7.6.3.2.-A that are permitted to have an NPS3/8 supply pipe, a connector not more than 750 mm long and not less than NPS1/4 may be used to supply water to the fixture.
(4)No water system between the point of connection with the water service pipe or the water meter and the first water distribution pipe that supplies a water heater that serves more than one fixture shall be sized less than NPS 3/4.
(5)Except as permitted in Sentence (6), where both hot and cold water is supplied to fixtures in residential buildings containing one or two dwelling units or row houses with separate water service pipes, the water system may be sized in accordance with Table 7.6.3.4., where
(a)the hydraulic loads for maximum separate demands on water distribution system piping are not less than 100% of the total hydraulic load of the fixture units given in Table 7.6.3.2.-A, 7.6.3.2.-B, 7.6.3.2.-C or 7.6.3.2.-D for private use.
(b)the minimum water pressure at the entry to the building is 200 kPa, and
(c)the total maximum length of the water system is 90 m.
(See Note A-7.6.3.4.(5))
(6)Where both hot and cold water is supplied to fixtures in a house containing only one dwelling unit, the water service pipe is permitted to be a minimum of NPS ¾ in provided,
(a)a minimum NPS ¾ water supply piping located in the basement or lower level is extended to the base of every hot and cold riser that serves a maximum of one bathroom group and to the last water supply branch serving any basement bathroom group, fixture supply or hose bibb, and
(b)the total hydraulic load is not more than 26 fixture units, using the values given in Table 7.6.3.2.-A.
OBC Div. B Table 7.6.3.2-A. Sizing of Water Distribution Systems[1][2]
Open OBC Div. B Table 7.6.3.2-A. in the code viewerTable 7.6.3.2.-A — Sizing of Water Distribution Systems[1][2] Forming Part of Sentences 7.6.3.2.(1), (2) and (3) and 7.6.3.4.(2), (3) and (5) Fixture or Device | Minimum Nominal Pipe Size of Supply Pipe, NPS | Private Use Hydraulic Load, fixture units: Cold | Private Use Hydraulic Load, fixture units: Hot | Private Use Hydraulic Load, fixture units: Total | Public Use Hydraulic Load, fixture units: Cold | Public Use Hydraulic Load, fixture units: Hot | Public Use Hydraulic Load, fixture units: Total Bathroom group with 6 LPF flush tank[3] | N/A | 2.7 | 1.5 | 3.6 | N/A | N/A | N/A Bathroom group with greater than 6 LPF flush tank[3] | N/A | 4 | 3 | 6 | N/A | N/A | N/A Bathroom group with more than 3 fixtures[4] | N/A | N/A | N/A | N/A | N/A | N/A | N/A Bathtub with or without shower head | ½ | 1 | 1 | 1.4 | 3 | 3 | 4 Bathtub with NPS ¾ spout | ¾ | 7.5 | 7.5 | 10 | 7.5 | 7.5 | 10 Bedpan washer | 1 | N/A | N/A | N/A | 7.5 | 7.5 | 10 Bidet | ⅜ | 1.5 | 1.5 | 2 | N/A | N/A | N/A Clothes washer, 3.5 kg | ½ | 1 | 1 | 1.4 | 2.25 | 2.25 | 3 Clothes washer, 6.8 kg | ½ | N/A | N/A | N/A | 3 | 3 | 4 Clothes washer, commercial[5] | N/A | N/A | N/A | N/A | N/A | N/A | N/A Dental lavatory | ⅜ | N/A | N/A | N/A | 1.5 | 1.5 | 2 Dental unit, cuspidor | ⅜ | N/A | N/A | N/A | 1 | N/A | 1 Dishwasher, commercial[5] | N/A | N/A | N/A | N/A | N/A | N/A | N/A Dishwasher, domestic | ⅜ | N/A | 1.4 | 1.4 | N/A | N/A | N/A Drinking fountain or water cooler | ⅜ | N/A | N/A | N/A | 0.25 | N/A | 0.25 Hose bibb | ½ | 2.5 | N/A | 2.5 | 2.5 | N/A | 2.5 Hose bibb | ¾ | 3 | N/A | 3 | 6 | N/A | 6 Hose bibb, combination hot and cold | ½ | 1.9 | 1.9 | 2.5 | 1.9 | 1.9 | 2.5 Lavatory, 8.3 LPM or less | ⅜ | 0.5 | 0.5 | 0.7 | 1.5 | 1.5 | 2 Lavatory, greater than 8.3 LPM | ⅜ | 0.75 | 0.75 | 1 | 1.5 | 1.5 | 2 Shower head, 9.5 LPM or less per head | ½ | 1 | 1 | 1.4 | 3 | 3 | 4 Shower head, greater than 9.5 LPM per head | ½ | 1.5 | 1.5 | 2 | 3 | 3 | 4 Shower, spray, multi-head, fixture unit per head | [5] | 1 | 1 | 1.4 | 3 | 3 | 4 Sink, bar | ⅜ | 0.75 | 0.75 | 1 | 1.5 | 1.5 | 2 Sink, clinic service faucet | ½ | N/A | N/A | N/A | 2.25 | 2.25 | 3 Sink, clinic service with direct flush valve | 1 | N/A | N/A | N/A | 6 | N/A | 6 Sink, kitchen, commercial, per faucet | ½ | N/A | N/A | N/A | 3 | 3 | 4 Sink, kitchen, domestic, 8.3 LPM or less | ⅜ | 1 | 1 | 1.4 | 1 | 1 | 1.4 Sink, kitchen, domestic, greater than 8.3 LPM | ⅜ | 1.5 | 1.5 | 2 | 1.5 | 1.5 | 2 Sink, laboratory | ⅜ | N/A | N/A | N/A | 1.5 | 1.5 | 2 Sink, laundry (1 or 2 compartments) | ⅜ | 1 | 1 | 1.4 | 1 | 1 | 1.4 Sink, service or mop basin | ½ | N/A | N/A | N/A | 2.25 | 2.25 | 3 Sink, washup, per faucet | ½ | N/A | N/A | N/A | 1.5 | 1.5 | 2 Urinal, with direct flush valve | ¾ | [6] | N/A | [6] | [6] | N/A | [6] Urinal, with flush tank | ⅜ | 3 | N/A | 3 | 3 | N/A | 3 Urinal, with self-closing metering valve | ½ | 2 | N/A | 2 | 4 | N/A | 4 Water closet, 6 LPF or less with flush tank | ⅜ | 2.2 | N/A | 2.2 | 2.2 | N/A | 2.2 Water closet, greater than 6 LPF with flush tank | ⅜ | 3 | N/A | 3 | 5 | N/A | 5 Water closet, with direct flush valve | 1 | [6] | N/A | [6] | [6] | N/A | [6] Notes to Table 7.6.3.2.-A: (1) The fixture unit values in this Table are not applicable in certain assembly occupancies because of surges in use by the occupants. For such occupancies, refer to specific design information. (2) For fixtures not indicated in this Table, refer to Table 7.6.3.2.-D. (3) Bathroom group is based on NPS ½ bathtub supply pipe. (4) Add additional fixture to the fixture load for bathroom group. (5) Refer to the manufacturer's recommendations. (6) For fixture unit values for fixtures with direct flush valves, see Sentence 7.6.3.2.(4) and Tables 7.6.3.2.-B and 7.6.3.2.-C.
OBC Div. B Table 7.6.3.2-D. Hydraulic Loads of Fixtures Not Listed in Table 7.6.3.2.-A
Open OBC Div. B Table 7.6.3.2-D. in the code viewerTable 7.6.3.2.-D — Hydraulic Loads of Fixtures Not Listed in Table 7.6.3.2.-A Forming Part of Sentences 7.6.3.2.(2) and (3) and 7.6.3.4.(5) Nominal Pipe Size of Supply Pipe, NPS | Hydraulic Load, fixture units — Private Use | Hydraulic Load, fixture units — Public Use ⅜ | 1 | 2 ½ | 2 | 4 ¾ | 3 | 6 1 | 6 | 10
OBC Div. B Table 7.6.3.4. Hydraulic Load, Fixture Units
Open OBC Div. B Table 7.6.3.4. in the code viewerTable 7.6.3.4. — Hydraulic Load, Fixture Units Forming Part of Sentence 7.6.3.4.(5) Nominal Pipe Size of Water Pipe, NPS | Water Velocity, 3.0 m/s[1]: Hydraulic Load, fixture units | Water Velocity, 2.4 m/s[1]: Hydraulic Load, fixture units | Water Velocity, 1.5 m/s[1]: Hydraulic Load, fixture units ½ | 8 | 7 | 4 ¾ | 21 | 16 | 9 1 | 43 | 31 | 18 1¼ | 83 | 57 | 30 Notes to Table 7.6.3.4.: (1) Table 2.6.3.4. is not intended to limit water velocities that are permitted by Sentence 7.6.3.5.(1).
OBC Div. B 7.6.3.5. Velocity
Open OBC Div. B 7.6.3.5. in the code viewer(1)The maximum permitted water velocities shall be those recommended by the pipe and fitting manufacturer.
OBC Div. B 7.6.3.2. Hydraulic Load
Open OBC Div. B 7.6.3.2. in the code viewer(1)Except as provided in Sentence (3), the hydraulic load of a fixture or device that is listed in Table 7.6.3.2.-A shall be the number of fixture units given in the Table.
(2)Except as provided in Sentences (1) and (3), the hydraulic load of a fixture that is not listed in Table 7.6.3.2.-A is the number of fixture units listed in Table 7.6.3.2.-D.
(3)Where fixtures are supplied with both hot and cold water, the hydraulic loads for maximum separate demands shall be 75% of the hydraulic load of the fixture units given in Tables 7.6.3.2.-A and 7.6.3.2.-D when using a detailed engineering design method.
(4)The hydraulic load of urinals and water closets with direct flush valves shall be the number of fixture units listed in Tables 7.6.3.2.-B and 7.6.3.2.-C. (See Note A-7.6.3.2.(4))
OBC Div. B 7.6.4.1. Water Supply Fittings
Open OBC Div. B 7.6.4.1. in the code viewer(1)Each lavatory in a washroom with fixtures for public use shall be equipped with a device capable of automatically shutting off the flow of water when the lavatory is not in use. (See Note A-7.6.4.1.(1) and (3))
(2)An automatic compensating valve serving an individual shower head shall have a manufacturer's minimum-rated water flow rate equal to or less than the shower head it serves. (See Note A-7.6.4.1.(2))