Values this chapter turns on
- minimum set point, electric storage water heater
- 60°C
- minimum set point, electric storage water heater
- minimum depth of a foundation drainage sump pit
- 750 mm
- minimum depth of a foundation drainage sump pit
- minimum diameter of foundation drain tile or pipe
- 100 mm
- minimum diameter of foundation drain tile or pipe
- minimum distance from a dry well to the foundation
- 5 m
- minimum distance from a dry well to the foundation
A plumbing inspector on a house job meets more than Part 7. Section 9.31. sets the plumbing facilities, Part 9 governs how pipes pass through fire separations and framing, and Section 9.14. covers foundation drainage and sumps. This chapter collects the Part 9 articles the syllabus names.
Plumbing facilities, water supply and service water heating (9.31.)
Section 9.31. applies to plumbing facilities and systems within dwelling units (OBC Div. B 9.31.1.1.OBC Div. B 9.31.1.1. Application(1) This Section applies to the plumbing facilities and plumbing systems within dwelling units. (2) In occupancies other than dwelling units, plumbing facilities, grab bars, floor drains, and floor and wall finishes around urinals shall conform to Subsection 3.7.4. (See also Section 3.8. regarding barrier-free…), and any plumbing or sewage system work must conform to Part 7 (9.31.2.1.OBC Div. B 9.31.2.1. General(1) The construction, extension, alteration, renewal or repair of plumbing systems and sewage disposal systems shall conform to Part 7.). Metal pipe in contact with cinders or other corrosive material needs a heavy bitumen coating or similar protection (9.31.2.2.OBC Div. B 9.31.2.2. Corrosion Protection(1) Metal pipes in contact with cinders or other corrosive material shall be protected by a heavy coating of bitumen or other corrosion protection.).
| Requirement | Article |
|---|---|
| Water distribution system in every dwelling unit where a drinking water system is available | 9.31.3.1.OBC Div. B 9.31.3.1. Required Water Supply(1) Every dwelling unit shall be supplied with a water distribution system where a drinking water system is available. |
| Hot and cold water to every kitchen sink, lavatory, bathtub, shower, slop sink and laundry area; cold water to every water closet | 9.31.3.2.OBC Div. B 9.31.3.2. Required Connections(1) Where a water distribution system is available, piping for hot and cold water shall be connected to every kitchen sink, lavatory, bathtub, shower, slop sink and laundry area. (2) Piping for cold water shall be run to every water closet. |
| Kitchen sink, lavatory, bathtub or shower, and water closet in every dwelling unit | 9.31.4.1.OBC Div. B 9.31.4.1. Required Fixtures(1) A kitchen sink, lavatory, bathtub or shower, and water closet shall be provided for every dwelling unit where a water distribution system is available. |
| Laundry facilities, or space for them, in each unit or grouped in the building | 9.31.4.1A.OBC Div. B 9.31.4.1A. Laundry Fixtures(1) Laundry facilities or a space for laundry facilities shall be provided in every dwelling unit or grouped elsewhere in the building in a location conveniently accessible to occupants of every dwelling unit. |
| Hot water supply in every dwelling unit, meeting 7.2.10. | 9.31.4.2.OBC Div. B 9.31.4.2. Hot Water Supply(1) Where a water distribution system is available a hot water supply shall be provided in every dwelling unit. (2) A water distribution system supplying hot water to plumbing fixtures shall conform to the requirements in Subsection 7.2.10. |
| Basement floor drain where gravity drainage to a sewer, ditch or dry well is possible | 9.31.4.3.OBC Div. B 9.31.4.3. Floor Drains(1) Where gravity drainage to a sewer, drainage ditch or dry well is possible, a floor drain shall be installed in a basement forming part of a dwelling unit. |
Service water heating (9.31.6.OBC Div. B 9.31.6.1. Hot Water Supply(1) Where hot water is required to be supplied in accordance with Article 9.31.4.2., equipment shall (a) provide an adequate supply of hot water, and (b) be installed in conformance with Part 7.):
| Rule | Value |
|---|---|
| Service hot water temperature range | 45°C to 60°C (9.31.6.1A.OBC Div. B 9.31.6.1A. Hot Water Temperature(1) Where a hot water supply is required by Article 9.31.4.3., equipment shall be installed to provide to every dwelling unit an adequate supply of service hot water with a temperature range from 45°C to 60°C. (2) An electric storage-type service water heater shall have a minimum set storage temperature of 60°C.) |
| Electric storage water heater set point | at least 60°C |
| Restraint against overturning | where S_a(0.2) is greater than 0.55 (9.31.6.2.OBC Div. B 9.31.6.2. Equipment and Installation(1) Every service water heater and its installation shall conform to Part 7. (2) Reserved (3) Where the building is in a location where the spectral response acceleration, S_a(0.2) , is greater than 0.55, service water heaters shall be secured to the structure to resist overturning. (See Note A-9.31.6.2.(3))) |
| Steel storage tanks | coated with zinc, glass lining, hydraulic cement or similar (9.31.6.3.OBC Div. B 9.31.6.3. Corrosion-Resistant Coating(1) Where storage tanks for service water heaters are of steel, they shall be coated with zinc, vitreous enamel (glass lined), hydraulic cement or other corrosion-resistant material.) |
| Fuel-burning heaters | connected to a chimney flue under 9.21. (9.31.6.4.OBC Div. B 9.31.6.4. Fuel-Burning Heaters(1) Fuel-burning service water heaters shall be connected to a chimney flue conforming to Section 9.21.) |
| Heating coils | not in a flue or a furnace or boiler combustion chamber (9.31.6.5.OBC Div. B 9.31.6.5. Heating Coils(1) Heating coils of service water heaters shall not be installed in a flue or in the combustion chamber of a boiler or furnace heating a building.) |
Note the two temperatures. The tank stores water at 60°C to control bacteria, while 7.2.10.7. limits water at the shower head or tub spout to 49°C. A mixing or compensating valve bridges the gap.
Space for fixtures and bathroom glass
Every dwelling unit needs an enclosed space big enough for a water closet, lavatory and bathtub or shower stall (OBC Div. B 9.5.3F.1.OBC Div. B 9.5.3F.1. Space to Accommodate Fixtures(1) In every dwelling unit an enclosed space of sufficient size shall be provided to accommodate a water closet, lavatory and bathtub or shower stall.). Glass for a shower or bathtub enclosure must be Class A safety glazing to CAN/CGSB-12.1 (OBC Div. B 9.6.1.4.(6)OBC Div. B 9.6.1.4. Types of Glass and Protection of Glass(1) Glass sidelights greater than 500 mm wide that could be mistaken for doors, glass in storm doors and glass in sliding doors within or at every entrance to a dwelling unit and in public areas shall be (a) safety glazing of the tempered or laminated type conforming to CAN/CGSB-12.1, "Safety Glazing," or (b) wired…).
Fire separations, exits and fire blocks
Penetrations of a fire separation are generally sealed by a firestop with an F rating at least equal to the required fire-resistance rating, tightly fitted for steel, ferrous, copper, concrete or masonry items, or otherwise sealed to keep the separation intact (OBC Div. B 9.10.9.6.OBC Div. B 9.10.9.6. General Requirements for Penetrations of Fire Separations(1) Except as required by Sentence (2) and Articles 9.10.9.7. and 9.10.9.8. and as permitted by Article 9.10.9.9., penetrations of a required fire separation or a membrane forming part of an assembly required to be a fire separation shall be (a) sealed by a firestop that, when subjected to the fire test method in…).
Piping rules (OBC Div. B 9.10.9.7.OBC Div. B 9.10.9.7. Piping Penetrations(1) Except as provided in Sentences (2) and (5), piping for drain, waste, vent and central vacuum systems that is not located in a vertical shaft is permitted to penetrate a fire separation required to have a fire-resistance rating or a membrane that forms part of an assembly required to have a fire-resistance rating…):
| Situation | Rule |
|---|---|
| DWV piping not in a vertical shaft through a rated fire separation | allowed if sealed per 9.10.9.6.(1)(a) or (b) |
| Water closet drain through a concrete slab | allowed; combustible pipe needs a firestop per 9.10.9.6.(1)(a) |
| Combustible DWV on one side of a vertical fire separation | allowed if not in a vertical shaft |
| Building with two dwelling units only | combustible DWV allowed on one side of a horizontal fire separation |
| Combustible water distribution piping | allowed if not in a vertical shaft and sealed by a firestop |
Where pipes pierce fire blocks, the fire block's effectiveness must be maintained around them (9.10.16.4.OBC Div. B 9.10.16.4. Penetration of Fire Blocks(1) Where fire blocks are pierced by pipes, ducts or other elements, the effectiveness of the fire blocks shall be maintained around such elements.). A fire separation around an exit may only be pierced by noncombustible piping serving the exit, plus sprinkler and standpipe piping (9.9.4.2.(4)OBC Div. B 9.9.4.2. Fire Separation for Exits(1) Except as provided in Sentence (5) and Article 9.9.8.5., every exit other than an exit doorway shall be separated from each adjacent floor area or from another exit by a fire separation having a fire-resistance rating not less than that required for the floor assembly above the floor area. (2) Where there is no…). Rooms such as washrooms and laundry rooms may not open directly into an exit, except in houses with a secondary suite (9.9.5.9.OBC Div. B 9.9.5.9. Ancillary Rooms(1) Except in houses with a secondary suite, ancillary rooms such as storage rooms, washrooms, toilet rooms, laundry rooms and service rooms shall not open directly into an exit.).
Foundation drainage, sumps and surface drainage
| Rule | Value |
|---|---|
| Drain tile or pipe size | at least 100 mm diameter (9.14.3.2.OBC Div. B 9.14.3.2. Minimum Size(1) Drain tile or pipe used for foundation drainage shall be not less than 100 mm in diam.) |
| Butt-jointed tile open joints | 6 mm to 10 mm, top half covered (9.14.3.3.OBC Div. B 9.14.3.3. Installation(1) Drain tile or pipe shall be laid on undisturbed or well-compacted soil so that the top of the tile or pipe is below the bottom of the floor slab or the ground cover of the crawl space. (2) Drain tile or pipe with but joints shall be laid with 6 mm to 10 mm open joints. (3) The top half of joints referred to in…) |
| Stone cover over drain pipe | at least 150 mm of clean coarse granular material |
| Disposal | to a sewer, drainage ditch or dry well (9.14.5.1.OBC Div. B 9.14.5.1. Drainage Disposal(1) Foundation drains shall drain to a sewer, drainage ditch or dry well.) |
| Sump pit | at least 750 mm deep, at least 0.25 m², with a child-resistant airtight cover (9.14.5.2.OBC Div. B 9.14.5.2. Sump Pits(1) Where a sump pit is provided it shall be (a) not less than 750 mm deep, (b) not less than 0.25 m² in area, and (c) provided with a cover. (2) Covers for sump pits shall be designed (a) to resist removal by children, and (b) to be airtight in accordance with Sentence 9.25.3.3.(7) (3) Where gravity drainage is not…) |
| No gravity drainage | automatic sump pump required |
| Dry well | only where groundwater is below its bottom; at least 5 m from the foundation (9.14.5.3.OBC Div. B 9.14.5.3. Dry Wells(1) Dry wells may be used only when located in areas where the natural groundwater level is below the bottom of the dry well. (2) Dry wells shall be not less than 5 m from the building foundation and located so that drainage is away from the building.) |
Surface drainage must be directed away from a water supply well or leaching bed (9.14.6.2.OBC Div. B 9.14.6.2. Drainage away from Wells or Septic Disposal Beds(1) Surface drainage shall be directed away from the location of a water supply well or leaching bed.), and a catch basin is needed where driveway runoff could collect or enter a garage (9.14.6.4.OBC Div. B 9.14.6.4. Catch Basin(1) Where runoff water from a driveway is likely to accumulate or enter a garage, a catch basin shall be installed to provide adequate drainage.).
Notching and drilling of framing (9.23.5.)
| Member | Limit |
|---|---|
| Holes in joists and rafters | not over one-quarter of member depth, at least 50 mm from the edges (9.23.5.1.OBC Div. B 9.23.5.1. Holes Drilled in Framing Members(1) Holes drilled in roof, floor or ceiling framing members shall be not larger than one-quarter the depth of the member and shall be located not less than 50 mm from the edges, unless the depth of the member is increased by the size of the hole.) |
| Notches in joists | on the top, within half the joist depth from the bearing, not deeper than one-third the depth (9.23.5.2.OBC Div. B 9.23.5.2. Notching of Framing Members(1) Floor, roof and ceiling framing members are permitted to be notched provided the notch is located on the top of the member within half the joist depth from the edge of bearing and is not deeper than one-third the joist depth, unless the depth of the member is increased by the size of the notch.) |
| Loadbearing studs | at least two-thirds of the depth left undamaged (9.23.5.3.OBC Div. B 9.23.5.3. Wall Studs(1) Wall studs shall not be notched, drilled or otherwise damaged so that the undamaged portion of the stud is less than two-thirds the depth of the stud if the stud is loadbearing or 40 mm if the stud is non-loadbearing, unless the weakened studs are suitably reinforced.) |
| Non-loadbearing studs | at least 40 mm left undamaged |
| Top plates | at least 50 mm of width left (9.23.5.4.OBC Div. B 9.23.5.4. Top Plates(1) Top plates in walls shall not be notched, drilled or otherwise weakened to reduce the undamaged width to less than 50 mm unless the weakened plates are suitably reinforced.) |
| Roof trusses | no notching or drilling unless the truss design allows it (9.23.5.5.OBC Div. B 9.23.5.5. Roof Trusses(1) Roof truss members shall not be notched, drilled or otherwise weakened unless such notching or drilling is allowed for in the design of the truss.) |
Worked example: a 235 mm deep floor joist may take a hole of up to 235 / 4 = 58.75 mm, so an NPS 2 drain with an outside diameter of about 60 mm will not fit without reinforcing or deepening the member. The hole must also stay at least 50 mm from both edges.
Other Part 9 items
- Roof drains, where provided, conform to Part 7 (9.26.18.1.OBC Div. B 9.26.18.1. Roof Drains(1) When roof drains are provided they shall conform to Part 7.), and sealant is needed where required to keep water out (9.27.4.1.OBC Div. B 9.27.4.1. Required Sealants(1) Sealant shall be provided where required to prevent the entry of water into the structure. (2) Sealant shall be provided between masonry, siding or stucco and the adjacent door and window frames or trim, including sills unless such locations are completely protected from the entry of rain. (3) Sealant shall be…).
- A manufactured building built to CSA Z240.2.1 (sections up to 4.88 m wide) or CSA A277 is deemed to comply, but site installation still follows the Code (9.1.1.9.OBC Div. B 9.1.1.9. Site Assembled and Factory-Built Buildings(1) Except as provided in Sentence (2) and in Sentence 12.2.1.2.(2), a manufactured building is deemed to comply with this Code if it is designed and constructed in compliance with, (a) CSA Z240.2.1, "Structural requirements for manufactured homes," if the building is constructed in sections not wider than 4.88 m, or…).
- Seasonal recreational buildings (cottages) need not have plumbing, but any plumbing provided must comply (OBC Div. B 9.37.2.1.(3)OBC Div. B 9.37.2.1. Exclusions(1) Except as provided in Subsection 9.10.15. and Articles 9.37.2.4. and 9.37.3.1., buildings used or intended to be used as seasonal recreational buildings need not comply with Sections 9.5. to 9.7. and 9.9. to 9.11. (2) Flooring need not comply with Section 9.30., but tight-fitting floors shall be provided to…).
- A park model trailer built to CAN/CSA-Z241 is deemed to comply (9.39.2.1.OBC Div. B 9.39.2.1. General(1) Except as provided in Subsection 9.39.3., a manufactured building used or intended to be used as a seasonal recreational building of residential occupancy is deemed to comply with this Code if it is designed and constructed in conformance with CAN/CSA-Z241 Series, "Park model trailers.").
- A Part 9 change of use under 9.41.1.1. triggers upgrades that include Section 9.31. plumbing (9.41.2.1.OBC Div. B 9.41.2.1. Change of Use and Compensating Construction(1) Where proposed construction will result in a change of use described in Clauses 9.40.1.1.(1)(a) to (f), additional construction shall be required in order that the building or part of a building subject to the change of use conforms to the requirements of Subsections 9.5.1. and 9.5.3. to 9.5.10., Section 9.6.…).
Common traps
- Confusing the 45°C to 60°C service hot water range with the 49°C fixture limit.
- Drilling a hole one-third of joist depth. Holes are one-quarter; notches are one-third.
- Assuming combustible DWV may sit on one side of a horizontal fire separation in any house. That is only for buildings with two dwelling units.
Chapter review
Chapter at a glance
One line per section: the idea to carry into the exam. Then the answers that most often catch candidates out.
- Plumbing facilities, water supply and service water heating (9.31.)
Section 9.31. applies to plumbing facilities and systems within dwelling units, and any plumbing or sewage system work must conform to Part 7. Metal pipe in contact with cinders…
- Space for fixtures and bathroom glass
Every dwelling unit needs an enclosed space big enough for a water closet, lavatory and bathtub or shower stall.
- Fire separations, exits and fire blocks
Penetrations of a fire separation are generally sealed by a firestop with an F rating at least equal to the required fire-resistance rating, tightly fitted for steel, ferrous…
- Foundation drainage, sumps and surface drainage
Surface drainage must be directed away from a water supply well or leaching bed, and a catch basin is needed where driveway runoff could collect or enter a garage.
- Notching and drilling of framing (9.23.5.)
Worked example: a 235 mm deep floor joist may take a hole of up to 235 / 4 = 58.75 mm, so an NPS 2 drain with an outside diameter of about 60 mm will not fit without reinforcing…
Usual exam traps
- Confusing the 45°C to 60°C service hot water range with the 49°C fixture limit.
- Drilling a hole one-third of joist depth. Holes are one-quarter; notches are one-third.
- Assuming combustible DWV may sit on one side of a horizontal fire separation in any house. That is only for buildings with two dwelling units.
Practice this chapter
Questions on Part 9 plumbing facilities and related Part 9 items, in the exam format, every answer explained and cited to its article. Sign in to start; a free account gets the free questions.
Code cited in this chapter
Based on the official 2024 Building Code Compendium on ontario.ca.
© King's Printer for Ontario, 2024. Reproduced with permission.
OBC Div. B 9.31.1.1. Application
Open OBC Div. B 9.31.1.1. in the code viewer(1)This Section applies to the plumbing facilities and plumbing systems within dwelling units.
(2)In occupancies other than dwelling units, plumbing facilities, grab bars, floor drains, and floor and wall finishes around urinals shall conform to Subsection 3.7.4. (See also Section 3.8. regarding barrier-free plumbing facilities.)
(3)Medical gas piping systems shall conform to Subsection 3.7.5.
OBC Div. B 9.31.2.1. General
Open OBC Div. B 9.31.2.1. in the code viewer(1)The construction, extension, alteration, renewal or repair of plumbing systems and sewage disposal systems shall conform to Part 7.
OBC Div. B 9.31.2.2. Corrosion Protection
Open OBC Div. B 9.31.2.2. in the code viewer(1)Metal pipes in contact with cinders or other corrosive material shall be protected by a heavy coating of bitumen or other corrosion protection.
OBC Div. B 9.31.3.1. Required Water Supply
Open OBC Div. B 9.31.3.1. in the code viewer(1)Every dwelling unit shall be supplied with a water distribution system where a drinking water system is available.
OBC Div. B 9.31.3.2. Required Connections
Open OBC Div. B 9.31.3.2. in the code viewer(1)Where a water distribution system is available, piping for hot and cold water shall be connected to every kitchen sink, lavatory, bathtub, shower, slop sink and laundry area.
(2)Piping for cold water shall be run to every water closet.
OBC Div. B 9.31.4.1. Required Fixtures
Open OBC Div. B 9.31.4.1. in the code viewer(1)A kitchen sink, lavatory, bathtub or shower, and water closet shall be provided for every dwelling unit where a water distribution system is available.
OBC Div. B 9.31.4.1A. Laundry Fixtures
Open OBC Div. B 9.31.4.1A. in the code viewer(1)Laundry facilities or a space for laundry facilities shall be provided in every dwelling unit or grouped elsewhere in the building in a location conveniently accessible to occupants of every dwelling unit.
OBC Div. B 9.31.4.2. Hot Water Supply
Open OBC Div. B 9.31.4.2. in the code viewer(1)Where a water distribution system is available a hot water supply shall be provided in every dwelling unit.
(2)A water distribution system supplying hot water to plumbing fixtures shall conform to the requirements in Subsection 7.2.10.
Show all 40 articles
OBC Div. B 9.31.4.3. Floor Drains
Open OBC Div. B 9.31.4.3. in the code viewer(1)Where gravity drainage to a sewer, drainage ditch or dry well is possible, a floor drain shall be installed in a basement forming part of a dwelling unit.
OBC Div. B 9.31.6.1. Hot Water Supply
Open OBC Div. B 9.31.6.1. in the code viewer(1)Where hot water is required to be supplied in accordance with Article 9.31.4.2., equipment shall
(a)provide an adequate supply of hot water, and
(b)be installed in conformance with Part 7.
OBC Div. B 9.31.6.1A. Hot Water Temperature
Open OBC Div. B 9.31.6.1A. in the code viewer(1)Where a hot water supply is required by Article 9.31.4.3., equipment shall be installed to provide to every dwelling unit an adequate supply of service hot water with a temperature range from 45°C to 60°C.
(2)An electric storage-type service water heater shall have a minimum set storage temperature of 60°C.
OBC Div. B 9.31.6.2. Equipment and Installation
Open OBC Div. B 9.31.6.2. in the code viewer(1)Every service water heater and its installation shall conform to Part 7.
(2)Reserved
(3)Where the building is in a location where the spectral response acceleration, S_a(0.2) , is greater than 0.55, service water heaters shall be secured to the structure to resist overturning. (See Note A-9.31.6.2.(3))
OBC Div. B 9.31.6.3. Corrosion-Resistant Coating
Open OBC Div. B 9.31.6.3. in the code viewer(1)Where storage tanks for service water heaters are of steel, they shall be coated with zinc, vitreous enamel (glass lined), hydraulic cement or other corrosion-resistant material.
OBC Div. B 9.31.6.4. Fuel-Burning Heaters
Open OBC Div. B 9.31.6.4. in the code viewer(1)Fuel-burning service water heaters shall be connected to a chimney flue conforming to Section 9.21.
OBC Div. B 9.31.6.5. Heating Coils
Open OBC Div. B 9.31.6.5. in the code viewer(1)Heating coils of service water heaters shall not be installed in a flue or in the combustion chamber of a boiler or furnace heating a building.
OBC Div. B 9.5.3F.1. Space to Accommodate Fixtures
Open OBC Div. B 9.5.3F.1. in the code viewer(1)In every dwelling unit an enclosed space of sufficient size shall be provided to accommodate a water closet, lavatory and bathtub or shower stall.
OBC Div. B 9.6.1.4. Types of Glass and Protection of Glass
Open OBC Div. B 9.6.1.4. in the code viewer(1)Glass sidelights greater than 500 mm wide that could be mistaken for doors, glass in storm doors and glass in sliding doors within or at every entrance to a dwelling unit and in public areas shall be
(a)safety glazing of the tempered or laminated type conforming to CAN/CGSB-12.1, "Safety Glazing," or
(b)wired glass conforming to CAN/CGSB-12.11-M, "Wired Safety Glass."
(2)Except as provided in Sentence (4), glass in entrance doors to dwelling units and in public areas, other than the entrance doors described in Sentence (1), shall be safety glazing or wired glass of the type described in Sentence (1) where the glass area exceeds 0.5m^2 and extends to less than 900 mm from the bottom of the door.
(3)Except as provided in Sentence (4), transparent panels that could be mistaken as a means of egress shall be protected by barriers or railings.
(4)Sliding glass partitions that separate a public corridor from an adjacent occupancy and that are open during normal working hours need not conform to Sentences (2), (3) and (5), except that such partitions shall be suitably marked to indicate their existence and position.
(5)Except as provided in Sentence (4), every glass or transparent door accessible to the public shall be equipped with hardware, bars or other permanent fixtures designed so that the existence and position of such doors is readily apparent.
(6)Glazing used for a shower or bathtub enclosure shall conform to Class A of CAN/CGSB-12.1, "Safety Glazing."
OBC Div. B 9.10.9.6. General Requirements for Penetrations of Fire Separations
Open OBC Div. B 9.10.9.6. in the code viewer(1)Except as required by Sentence (2) and Articles 9.10.9.7. and 9.10.9.8. and as permitted by Article 9.10.9.9., penetrations of a required fire separation or a membrane forming part of an assembly required to be a fire separation shall be
(a)sealed by a firestop that, when subjected to the fire test method in CAN/ULC-S115, "Standard Method of Fire Tests of Firestop Systems," has an F rating not less than the required fire-resistance rating for the fire separation,
(b)tightly fitted or cast in place, provided the penetrating item is made of steel, ferrous, copper, concrete or masonry, or
(c)sealed to maintain the integrity of the fire separation. (See Note A-9.10.9.6.(1))
(2)Penetrations of a firewall shall be sealed at the penetration by a firestop that, when subjected to the fire test method in "CAN/ULC-S115, "Standard Method of Fire Tests of Firestop Systems," has an FT rating not less than the fire-resistance rating for the fire separation.
OBC Div. B 9.10.9.7. Piping Penetrations
Open OBC Div. B 9.10.9.7. in the code viewer(1)Except as provided in Sentences (2) and (5), piping for drain, waste, vent and central vacuum systems that is not located in a vertical shaft is permitted to penetrate a fire separation required to have a fire-resistance rating or a membrane that forms part of an assembly required to have a fire-resistance rating, provided the penetration is protected in accordance with Clause 9.10.9.6.(1)(a) or (b).
(2)Drain piping leading directly from a water closet through a concrete floor slab is permitted to penetrate a horizontal fire separation or a membrane that contributes to the required fire-resistance rating of a horizontal fire separation, provided
(a)the piping is noncombustible and the penetration is protected in accordance with Sentence 9.10.9.6.(1), or
(b)the piping is combustible and the penetration is sealed by a firestop conforming to Clause 9.10.9.6.(1)(a).
(3)Combustibledrain, waste and vent piping is permitted on one side of a vertical fire separation, provided it is not located in a vertical shaft.
(4)In buildings containing two dwelling units only, combustible drain, waste and vent piping is permitted on one side of a horizontal fire separation.
(5)Water distribution piping is permitted to partly or wholly penetrate a fire separation required to have a fire-resistance rating, provided
(a)the piping is noncombustible and the penetration is protected in accordance with Sentence 9.10.9.6.(1), or
(b)the piping is combustible and is not located in a vertical shaft, and the penetration is sealed by a firestop conforming to Clause 9.10.9.6.(1)(a).
OBC Div. B 9.10.16.4. Penetration of Fire Blocks
Open OBC Div. B 9.10.16.4. in the code viewer(1)Where fire blocks are pierced by pipes, ducts or other elements, the effectiveness of the fire blocks shall be maintained around such elements.
OBC Div. B 9.9.4.2. Fire Separation for Exits
Open OBC Div. B 9.9.4.2. in the code viewer(1)Except as provided in Sentence (5) and Article 9.9.8.5., every exit other than an exit doorway shall be separated from each adjacent floor area or from another exit by a fire separation having a fire-resistance rating not less than that required for the floor assembly above the floor area.
(2)Where there is no floor assembly above, the fire-resistance rating required in Sentence (1) shall not be less than that required by Subsection 9.10.8. for the floor assembly below, but in no case shall the fire-resistance rating be less than 45 min.
(3)A fire separation common to 2 exits shall be smoke-tight and not be pierced by doorways, duct work, piping or any other opening that may affect the continuity of the separation.
(4)A fire separation that separates an exit from the remainder of the building shall have no openings except those for electrical wiring, noncombustible conduit and noncombustible piping that serve only the exit, and for standpipes, sprinkler piping, exit doorways and wired glass and glass block permitted in Article 9.9.4.3.
(5)The requirements in Sentence (1) do not apply to an exterior exit passageway provided the passageway has at least 50% of its exterior sides open to the outdoors and is served by an exit stair at each end of the passageway.
OBC Div. B 9.9.5.9. Ancillary Rooms
Open OBC Div. B 9.9.5.9. in the code viewer(1)Except in houses with a secondary suite, ancillary rooms such as storage rooms, washrooms, toilet rooms, laundry rooms and service rooms shall not open directly into an exit.
OBC Div. B 9.14.3.2. Minimum Size
Open OBC Div. B 9.14.3.2. in the code viewer(1)Drain tile or pipe used for foundation drainage shall be not less than 100 mm in diam.
OBC Div. B 9.14.3.3. Installation
Open OBC Div. B 9.14.3.3. in the code viewer(1)Drain tile or pipe shall be laid on undisturbed or well-compacted soil so that the top of the tile or pipe is below the bottom of the floor slab or the ground cover of the crawl space.
(2)Drain tile or pipe with but joints shall be laid with 6 mm to 10 mm open joints.
(3)The top half of joints referred to in Sentence (2) shall be covered with sheathing paper, 0.10 mm polyethylene or No. 15 asphalt or tar-saturated felt.
(4)The top and sides of drain pipe or tile shall be covered with not less than 150 mm of crushed stone or other coarse clean granular material containing not more than 10% of material that will pass a 4 mm sieve.
OBC Div. B 9.14.5.1. Drainage Disposal
Open OBC Div. B 9.14.5.1. in the code viewer(1)Foundation drains shall drain to a sewer, drainage ditch or dry well.
OBC Div. B 9.14.5.2. Sump Pits
Open OBC Div. B 9.14.5.2. in the code viewer(1)Where a sump pit is provided it shall be
(a)not less than 750 mm deep,
(b)not less than 0.25 m² in area, and
(c)provided with a cover.
(2)Covers for sump pits shall be designed
(a)to resist removal by children, and
(b)to be airtight in accordance with Sentence 9.25.3.3.(7)
(3)Where gravity drainage is not practical, an automatic sump pump shall be provided to discharge the water from the sump pit described in Sentence (1) into a sewer, drainage ditch or dry well.
OBC Div. B 9.14.5.3. Dry Wells
Open OBC Div. B 9.14.5.3. in the code viewer(1)Dry wells may be used only when located in areas where the natural groundwater level is below the bottom of the dry well.
(2)Dry wells shall be not less than 5 m from the building foundation and located so that drainage is away from the building.
OBC Div. B 9.14.6.2. Drainage away from Wells or Septic Disposal Beds
Open OBC Div. B 9.14.6.2. in the code viewer(1)Surface drainage shall be directed away from the location of a water supply well or leaching bed.
OBC Div. B 9.14.6.4. Catch Basin
Open OBC Div. B 9.14.6.4. in the code viewer(1)Where runoff water from a driveway is likely to accumulate or enter a garage, a catch basin shall be installed to provide adequate drainage.
OBC Div. B 9.23.5.1. Holes Drilled in Framing Members
Open OBC Div. B 9.23.5.1. in the code viewer(1)Holes drilled in roof, floor or ceiling framing members shall be not larger than one-quarter the depth of the member and shall be located not less than 50 mm from the edges, unless the depth of the member is increased by the size of the hole.
OBC Div. B 9.23.5.2. Notching of Framing Members
Open OBC Div. B 9.23.5.2. in the code viewer(1)Floor, roof and ceiling framing members are permitted to be notched provided the notch is located on the top of the member within half the joist depth from the edge of bearing and is not deeper than one-third the joist depth, unless the depth of the member is increased by the size of the notch.
OBC Div. B 9.23.5.3. Wall Studs
Open OBC Div. B 9.23.5.3. in the code viewer(1)Wall studs shall not be notched, drilled or otherwise damaged so that the undamaged portion of the stud is less than two-thirds the depth of the stud if the stud is loadbearing or 40 mm if the stud is non-loadbearing, unless the weakened studs are suitably reinforced.
OBC Div. B 9.23.5.4. Top Plates
Open OBC Div. B 9.23.5.4. in the code viewer(1)Top plates in walls shall not be notched, drilled or otherwise weakened to reduce the undamaged width to less than 50 mm unless the weakened plates are suitably reinforced.
OBC Div. B 9.23.5.5. Roof Trusses
Open OBC Div. B 9.23.5.5. in the code viewer(1)Roof truss members shall not be notched, drilled or otherwise weakened unless such notching or drilling is allowed for in the design of the truss.
OBC Div. B 9.26.18.1. Roof Drains
Open OBC Div. B 9.26.18.1. in the code viewer(1)When roof drains are provided they shall conform to Part 7.
OBC Div. B 9.27.4.1. Required Sealants
Open OBC Div. B 9.27.4.1. in the code viewer(1)Sealant shall be provided where required to prevent the entry of water into the structure.
(2)Sealant shall be provided between masonry, siding or stucco and the adjacent door and window frames or trim, including sills unless such locations are completely protected from the entry of rain.
(3)Sealant shall be provided at vertical joints between different cladding materials unless the joint is suitably lapped or flashed to prevent the entry of rain. (See Articles 9.7.6.2., 9.20.13.12. and 9.28.1.5.)
OBC Div. B 9.1.1.9. Site Assembled and Factory-Built Buildings
Open OBC Div. B 9.1.1.9. in the code viewer(1)Except as provided in Sentence (2) and in Sentence 12.2.1.2.(2), a manufactured building is deemed to comply with this Code if it is designed and constructed in compliance with,
(a)CSA Z240.2.1, "Structural requirements for manufactured homes," if the building is constructed in sections not wider than 4.88 m, or
(b)CSA A277, "Procedure for certification of prefabricated buildings, modules, and panels."
(2)The requirements of this Code shall apply to,
(a)building components designed and constructed outside the place of manufacture, and
(b)site installation of such buildings.
OBC Div. B 9.37.2.1. Exclusions
Open OBC Div. B 9.37.2.1. in the code viewer(1)Except as provided in Subsection 9.10.15. and Articles 9.37.2.4. and 9.37.3.1., buildings used or intended to be used as seasonal recreational buildings need not comply with Sections 9.5. to 9.7. and 9.9. to 9.11.
(2)Flooring need not comply with Section 9.30., but tight-fitting floors shall be provided to support the live and dead loads.
(3)Except as provided in Sentence (4), thermal insulation, vapour barrier, air barrier construction, interior finishes, plumbing, heating, mechanical ventilation, air-conditioning and electrical facilities, need not be provided, but where any of these are provided, they shall comply with the requirements of this Part.
(4)Where heating and air-conditioning are provided, Article 9.33.3.1. need not be complied with.
OBC Div. B 9.39.2.1. General
Open OBC Div. B 9.39.2.1. in the code viewer(1)Except as provided in Subsection 9.39.3., a manufactured building used or intended to be used as a seasonal recreational building of residential occupancy is deemed to comply with this Code if it is designed and constructed in conformance with CAN/CSA-Z241 Series, "Park model trailers."
OBC Div. B 9.41.2.1. Change of Use and Compensating Construction
Open OBC Div. B 9.41.2.1. in the code viewer(1)Where proposed construction will result in a change of use described in Clauses 9.40.1.1.(1)(a) to (f), additional construction shall be required in order that the building or part of a building subject to the change of use conforms to the requirements of Subsections 9.5.1. and 9.5.3. to 9.5.10., Section 9.6., Article 9.7.2.3. Sentences 9.7.5.1.(2) and 9.7.6.2.(1) and (3), Articles 9.8.8.1. and 9.9.10.1., Subsection 9.10.17. and Sections 9.31., 9.32. and 9.34. as they apply to the new major occupancy that the building or part of a building is to support.
(2)For the purposes of this Article, existing buildings shall be classified as to their construction and occupancy as provided for in Sentence 11.2.1.1.(1).