Values this chapter turns on
- energy gain needed over the pre-2025 Code levels
- 13%
- energy gain needed over the pre-2025 Code levels
- min timer on public corridor motion sensors
- 15 min
- min timer on public corridor motion sensors
- items to meet for occupancy before completion
- 17 conditions
- items to meet for occupancy before completion
- max aggregate area of a permit-exempt tent
- 60 m²
- max aggregate area of a permit-exempt tent
The last section of the syllabus pulls together three things a Part 3 designer or examiner meets on every project: the energy and water rules of Part 12, the compliance alternatives of Part 11 for existing buildings, and the Division C administration around design, permits, occupancy, notices, alternative solutions and Minister's rulings. Sentence 12.2.1.2.(3) and Section 12.3. are excluded, so this chapter skips the house rules.
Energy efficiency, CO2e and peak demand (SB-10)
Part 12 is about resource conservation and environmental integrity (OBC Div. B 12.1.1.2.OBC Div. B 12.1.1.2. Application(1) This Part applies to resource conservation and environmental integrity in the design and construction of buildings.). For a Part 3 building, three separate design checks apply:
| Requirement | Article | How you comply |
|---|---|---|
| Energy efficiency | 12.2.1.2.OBC Div. B 12.2.1.2. Energy Efficiency Design(1) Reserved. (2) Except as provided in Sentence (3) and Sentence (4), the energy efficiency of all buildings shall (a) be designed to exceed by not less than 13% the energy efficiency levels required by Sentence 12.2.1.1.(2) of O. Reg. 332/12 (Building Code) as it read on December 31, 2024, or (b) conform to Division… | Beat the old O. Reg. 332/12 levels (as of December 31, 2024) by at least 13%, or meet SB-10 Division 1 and Division 3 or 5 |
| CO2e emissions | 12.2.2.1.OBC Div. B 12.2.2.1. Carbon Dioxide Equivalents(1) Except as provided in Sentence (2), all buildings shall be designed to conform to the CO₂e emission requirements set out in MMA Supplementary Standard SB-10, “Energy Efficiency Requirements.” (2) This Article does not apply to (a) a building or part of a building of residential occupancy that is within the scope… | Meet the CO2e emission requirements in SB-10 |
| Peak electric demand | 12.2.3.1.OBC Div. B 12.2.3.1. Peak Electric Demand(1) Except as provided in Sentence (2), all buildings shall be designed to conform to the peak electric demand requirements set out in MMA Supplementary Standard SB-10, “Energy Efficiency Requirements.” (2) This Article does not apply to (a) a building or part of a building of residential occupancy that is within the… | Meet the peak electric demand requirements in SB-10 |
All three exempt farm buildings, buildings that use neither electrical power nor fossil fuel, and seasonal recreational buildings under 9.37. or 9.39. The CO2e and peak demand articles also exempt Part 9 residential buildings occupied through the winter. Carbon dioxide equivalent compares greenhouse gases by their global warming potential (definitionOBC Div. A 1.4.1.2.(1) Carbon dioxide equivalentCarbon dioxide equivalent means a measure used to compare the impact of various greenhouse gases based on their global warming potential.).
Motion sensors may control minimum required lighting, but not in an exit, not in a corridor serving patients or residents in Group B, Division 2 or 3, and never for emergency lighting (12.2.4.1.OBC Div. B 12.2.4.1. Motion Sensors(1) Lighting installed to provide the minimum illumination levels required by this Code may be controlled by motion sensors except where the lighting (a) is installed in an exit, (b) is installed in a corridor serving patients or residents in a Group B, Division 2 or Division 3 occupancy, or (c) is required to conform…). In public corridors, the sensors need fail-safe switch controllers and timers of at least 15 minutes.
Water efficiency
Every building must meet the water efficiency requirements of Subsection 7.6.4. (12.4.1.1.OBC Div. B 12.4.1.1. Plumbing Systems(1) All buildings shall conform to the water efficiency requirements of Subsection 7.6.4.). The details sit in Part 7; Part 12 only points there.
Renovation compliance alternatives
Part 11 gives tables of compliance alternatives (C.A.s) for existing buildings: Table 11.5.1.1.-A for assembly, -B for care, care and treatment or detention, -C for residential, -D/E for business and mercantile, and -F for industrial (11.5.1.1.OBC Div. B 11.5.1.1. Compliance Alternatives(1) A compliance alternative shown in Table 11.5.1.1.-A, 11.5.1.1.-B, 11.5.1.1.-C, 11.5.1.1.-D/E or 11.5.1.1.-F may be substituted for a requirement contained in Part 3, 4, 6 or 8 where the chief building official is satisfied that compliance with the requirement is impracticable because, (a) of structural or…).
| Substituting for a requirement in | Condition |
|---|---|
| Part 3, 4, 6 or 8 | The chief building official must be satisfied that compliance is impracticable because of structural or construction difficulties, or harm to a heritage building |
| Part 9 or 12 | No need to prove impracticability |
For example, item A9 of Table 11.5.1.1.-AOBC Div. B Table 11.5.1.1-A. Compliance Alternatives for Assembly Occupancies — Forming Part of Article 11.5.1.1.Table 11.5.1.1.-A Compliance Alternatives for Assembly Occupancies — Forming Part of Article 11.5.1.1. C.A. Number | Division B Requirements | Compliance Alternative A1 | 3.1.4.7. | Existing heavy timber construction acceptable where construction is within 90% of member sizes listed in Part 3. A2 | 3.1.5.2. to… accepts existing 45 mm solid core wood doors in place of the 20 min door assemblies described in 3.1.8.12.(1).
Permits, occupancy and notices
Design by an architect or engineer. Div. C 1.2.1.2.OBC Div. C 1.2.1.2. Design by Architect or Professional Engineer(1) A foundation of a building shall be designed by a professional engineer where, (a) the foundation is to be constructed below the level of the footings of an adjacent building and within the angle of repose of the soil, as drawn from the bottom of the footings, or (b) underpinning of a foundation is to be… requires a professional engineer for underpinning, foundations below an adjacent footing within the angle of repose, sprinkler protected glazed wall assemblies, shelf and rack storage systems, and tent framing over 225 m². Larger signs (projecting over 115 kg, or a roof sign face over 10 m²) need an architect or engineer.
Permit exemptions (C 1.3.1.1.OBC Div. C 1.3.1.1. Requirement for Permits(1) A person is exempt from the requirement to obtain a permit under section 8 of the Act, (a) for the demolition of a farm building located on a farm, (b) subject to Sentence (2), for the construction or demolition of a building in territory without municipal organization, or (c) for the construction of a Class 1…) include demolishing a farm building on a farm, a Class 1 sewage system, tents of 60 m² or less in aggregate that are unattached and more than 3 m from other structures, and sheds of 15 m² or less meeting the listed conditions.
Change of use permits (C 1.3.1.4.OBC Div. C 1.3.1.4. Permits Under Section 10 of the Act(1) Except as provided in Sentence (2), the following changes in use of a building or part of a building constitute an increase in hazard for the purposes of section 10 of the Act and require a permit under section 10 of the Act: (a) a change of the major occupancy of all or part of a building that is designated with…) are needed when the change is marked "Y" in Table 1.3.1.4., or in listed cases such as converting a farm building to a non-farm occupancy or to G-1, or changing a building to a post-disaster building or a retirement home.
Conditional permits cannot be issued until listed applicable laws (conservation authority, heritage, environmental assessment and others) are met, and the permit must state that it is conditional (C 1.3.1.5.OBC Div. C 1.3.1.5. Conditional Permits(1) The chief building official shall not issue a conditional permit for any stage of construction under subsection 8(3) of the Act unless compliance with the following applicable laws has been achieved in respect of the proposed building or construction: (a) section 3 of the Building Transit Faster Act, 2020 with…).
On site. The permit is posted in a conspicuous place (C 1.3.2.1.OBC Div. C 1.3.2.1. Permit Posting(1) Where a permit has been issued pursuant to the Act, the person to whom it is issued shall have the permit or a copy of it posted at all times during construction or demolition in a conspicuous place on the property in respect of which the permit was issued.), and the site keeps certified drawings, any Building Materials Evaluation Commission authorizations and any Minister's rulings (C 1.3.2.2.OBC Div. C 1.3.2.2. Documentation on Site(1) The person in charge of the construction of the building shall keep and maintain on the site of the construction, (a) at least one copy of drawings and specifications certified by the chief building official or a person designated by the chief building official to be a copy of those submitted with the application…).
Occupancy before completion. The chief building official issues an occupancy permit when the 17 conditions in Sentence 1.3.3.1.(3) are met, for example structure and enclosing walls complete to the roof, fire separations and exits complete, and standpipe, sprinkler and fire alarm systems operational (C 1.3.3.1.OBC Div. C 1.3.3.1. Occupancy Permit — General(1) Except as permitted in Sentence 1.3.3.2.(1), a person may occupy or permit to be occupied any building or part of it that has not been fully completed at the date of occupation where the chief building official or a person designated by the chief building official has issued a permit authorizing occupation of the…). Whoever occupies early must notify the chief building official on completion (C 1.3.3.3.OBC Div. C 1.3.3.3. Notification(1) Where a person has occupied or permitted the occupancy of a building under Article 1.3.3.1. or 1.3.3.2., such person shall notify the chief building official forthwith upon completion of the building.).
Prescribed notices (C 1.3.5.1.OBC Div. C 1.3.5.1. Prescribed Notices(1) This Article sets out the notices that are required under section 10.2 of the Act. (2) The person to whom a permit under section 8 of the Act is issued shall notify the chief building official or, where a registered code agency is appointed under the Act in respect of the construction to which the notice relates…) go to the chief building official, or the registered code agency if one is appointed. For a Part 3 building the framing notice is "substantial completion of structural framing and roughing-in" of HVAC and air-contaminant extraction equipment, which differs from the Part 9 wording about ductwork and piping. There are also notices for air barrier systems, fire separations and fire protection systems, and fire access routes.
As constructed plans may be required by the chief building official where the principal authority has passed a by-law under clause 7(1)(g) of the Act (C 1.3.6.1.OBC Div. C 1.3.6.1. Application(1) Where a by-law, resolution or regulation has been made by a principal authority under clause 7(1)(g) of the Act, the chief building official may require that as constructed plans for the whole of, or any part or system of, a building or any class of buildings be provided by the persons responsible for the…).
Alternative solutions and rulings
Whoever proposes an alternative solution documents it for the chief building official or registered code agency: the objectives, functional statements and acceptable solutions involved, and evidence (past performance, tests or other evaluation) that it meets the required performance level (C 2.1.1.1.OBC Div. C 2.1.1.1. Documentation(1) The person proposing the use of an alternative solution shall provide documentation to the chief building official or registered code agency that, (a) identifies applicable objectives, functional statements and acceptable solutions, and (b) establishes on the basis of past performance, tests described in Article…). Where no published test exists, tests must simulate or exceed service conditions, or compare with an accepted material (C 2.1.1.2.OBC Div. C 2.1.1.2. Tests(1) Where no published test method to establish the suitability of an alternative solution proposed under Article 2.1.1.1. exists, then the tests used for the purposes of that Article shall be designed to simulate or exceed anticipated service conditions or shall be designed to compare the performance of the material…).
A Minister's ruling approving an alternative material, system or design must be consistent with a Building Code Commission decision, an approval across another whole province or territory, or a CCBFC-approved revision of the National Building or Plumbing Code (C 2.4.2.1.OBC Div. C 2.4.2.1. Criteria(1) Sentence (2) sets out criteria to be followed by the Minister when making a ruling under clause 29(1)(c) of the Act to approve the use of an alternative material, system or building design. (2) The Minister’s approval of the use of an alternative material, system or building design referred to in Sentence (1) may…). Minister's interpretations are posted on the Building Code website and given in writing on request (C 2.4.3.1.OBC Div. C 2.4.3.1. Interpretations By Minister(1) Every interpretation issued by the Minister under section 28.1 of the Act shall be made available to the public, (a) by posting the interpretation on the Building Code website, and (b) by providing a written copy of the interpretation on receipt of a request for it.).
Common traps
- Thinking SB-10 energy compliance also covers CO2e and peak demand. They are three articles.
- Using a Part 11 C.A. for a Part 3 requirement without the chief building official's impracticability finding.
- Using the Part 9 framing notice wording for a Part 3 building.
- Sending notices to the chief building official when a registered code agency was appointed.
- Allowing motion sensors in exits or on emergency lighting.
Chapter review
Chapter at a glance
One line per section: the idea to carry into the exam. Then the answers that most often catch candidates out.
- Energy efficiency, CO2e and peak demand (SB-10)
Part 12 is about resource conservation and environmental integrity.
- Water efficiency
Every building must meet the water efficiency requirements of Subsection 7.6.4.. The details sit in Part 7; Part 12 only points there.
- Renovation compliance alternatives
Part 11 gives tables of compliance alternatives (C.A.s) for existing buildings: Table 11.5.1.1.-A for assembly, -B for care, care and treatment or detention, -C for residential…
- Permits, occupancy and notices
Design by an architect or engineer.
- Alternative solutions and rulings
Whoever proposes an alternative solution documents it for the chief building official or registered code agency: the objectives, functional statements and acceptable solutions…
Usual exam traps
- Thinking SB-10 energy compliance also covers CO2e and peak demand. They are three articles.
- Using a Part 11 C.A. for a Part 3 requirement without the chief building official's impracticability finding.
- Using the Part 9 framing notice wording for a Part 3 building.
- Sending notices to the chief building official when a registered code agency was appointed.
- Allowing motion sensors in exits or on emergency lighting.
Practice this chapter
Questions on Energy, renovation and Division C administration, in the exam format, every answer explained and cited to its article. Sign in to start; a free account gets the free questions.
Code cited in this chapter
Based on the official 2024 Building Code Compendium on ontario.ca.
© King's Printer for Ontario, 2024. Reproduced with permission.
OBC Div. B 12.1.1.2. Application
Open OBC Div. B 12.1.1.2. in the code viewer(1)This Part applies to resource conservation and environmental integrity in the design and construction of buildings.
OBC Div. B 12.2.1.2. Energy Efficiency Design
Open OBC Div. B 12.2.1.2. in the code viewer(1)Reserved.
(2)Except as provided in Sentence (3) and Sentence (4), the energy efficiency of all buildings shall
(a)be designed to exceed by not less than 13% the energy efficiency levels required by Sentence 12.2.1.1.(2) of O. Reg. 332/12 (Building Code) as it read on December 31, 2024, or
(b)conform to Division 1 and Division 3 or 5 of MMA Supplementary Standard SB-10, “Energy Efficiency Requirements.”
(3)Except as provided in Sentence (4), the energy efficiency of a building or part of a building of residential occupancy that is within the scope of Part 9 and is intended for occupancy on a continuing basis during the winter months shall
(a)be designed to exceed by not less than 15% the energy efficiency levels required by Sentence 12.2.1.1.(3) of O. Reg. 332/12 (Building Code) as it read on December 31, 2024, or
(b)conform to Chapters 1 and 3 of MMA Supplementary Standard SB-12, “Energy Efficiency for Housing.”
(4)This Article does not apply to
(a)a farm building,
(b)a building that does not use electrical power or fossil fuel, or
(c)a seasonal recreational building described in Section 9.37. or 9.39.
OBC Div. B 12.2.2.1. Carbon Dioxide Equivalents
Open OBC Div. B 12.2.2.1. in the code viewer(1)Except as provided in Sentence (2), all buildings shall be designed to conform to the CO₂e emission requirements set out in MMA Supplementary Standard SB-10, “Energy Efficiency Requirements.”
(2)This Article does not apply to
(a)a building or part of a building of residential occupancy that is within the scope of Part 9 and is intended for occupancy on a continuing basis during the winter months,
(b)a farm building,
(c)a building that does not use electrical power or fossil fuel, or
(d)a seasonal recreational building described in Section 9.37. or 9.39.
OBC Div. B 12.2.3.1. Peak Electric Demand
Open OBC Div. B 12.2.3.1. in the code viewer(1)Except as provided in Sentence (2), all buildings shall be designed to conform to the peak electric demand requirements set out in MMA Supplementary Standard SB-10, “Energy Efficiency Requirements.”
(2)This Article does not apply to
(a)a building or part of a building of residential occupancy that is within the scope of Part 9 and is intended for occupancy on a continuing basis during the winter months,
(b)a farm building,
(c)a building that does not use electrical power or fossil fuel, or
(d)a seasonal recreational building described in Section 9.37. or 9.39.
OBC Div. A 1.4.1.2.(1) Carbon dioxide equivalent
Open OBC Div. A 1.4.1.2.(1) in the code viewerCarbon dioxide equivalent means a measure used to compare the impact of various greenhouse gases based on their global warming potential.
OBC Div. B 12.2.4.1. Motion Sensors
Open OBC Div. B 12.2.4.1. in the code viewer(1)Lighting installed to provide the minimum illumination levels required by this Code may be controlled by motion sensors except where the lighting
(a)is installed in an exit,
(b)is installed in a corridor serving patients or residents in a Group B, Division 2 or Division 3 occupancy, or
(c)is required to conform to Sentence 3.2.7.1.(10).
(2)Where motion sensors are used to control minimum lighting in a public corridor or corridor providing access to exit for the public, the motion sensors shall be installed with switch controllers equipped for fail-safe operation and illumination timers set for a minimum 15-minute duration.
(3)A motion sensor shall not be used to control emergency lighting.
OBC Div. B 12.4.1.1. Plumbing Systems
Open OBC Div. B 12.4.1.1. in the code viewer(1)All buildings shall conform to the water efficiency requirements of Subsection 7.6.4.
OBC Div. B 11.5.1.1. Compliance Alternatives
Open OBC Div. B 11.5.1.1. in the code viewer(1)A compliance alternative shown in Table 11.5.1.1.-A, 11.5.1.1.-B, 11.5.1.1.-C, 11.5.1.1.-D/E or 11.5.1.1.-F may be substituted for a requirement contained in Part 3, 4, 6 or 8 where the chief building official is satisfied that compliance with the requirement is impracticable because,
(a)of structural or construction difficulties, or
(b)it is detrimental to the preservation of a heritage building.
(2)A compliance alternative shown in Table 11.5.1.1.-A, 11.5.1.1.-B, 11.5.1.1.-C, 11.5.1.1.-D/E or 11.5.1.1.-F may be substituted for a requirement contained in Part 9 or 12 without satisfying the chief building official that compliance with the requirement is impracticable.
Show all 23 articles
OBC Div. B Table 11.5.1.1-A. Compliance Alternatives for Assembly Occupancies — Forming Part of Article 11.5.1.1.
Open OBC Div. B Table 11.5.1.1-A. in the code viewerTable 11.5.1.1.-A Compliance Alternatives for Assembly Occupancies — Forming Part of Article 11.5.1.1. C.A. Number | Division B Requirements | Compliance Alternative A1 | 3.1.4.7. | Existing heavy timber construction acceptable where construction is within 90% of member sizes listed in Part 3. A2 | 3.1.5.2. to 3.1.5.4.; 3.1.5.8. | Existing acceptable. A3 | 3.1.5.9. to 3.1.5.12. | Except for exposed foamed plastics, existing acceptable. To match existing, materials may be added from on or off site. A4 | 3.1.5.18. to 3.1.5.20.; 3.1.5.25. | Existing acceptable. A5 | 3.1.7.1. | Fire-resistance ratings may also be used where they are based on: (1) HUD Rehabilitation Guidelines, “Guideline on Fire Ratings of Archaic Materials and Assemblies”. (2) DBR Technical Paper No. 194, “Fire Endurance of Protected Steel Columns and Beams”. (3) DBR Technical Paper No. 207, “Fire Endurance of Unit Masonry Walls”. (4) DBR Technical Paper No. 222, “Fire Endurance of Light-Framed and Miscellaneous Assemblies”. A6 | 3.1.7.5.(3) | Existing assemblies required to be of noncombustible construction may be supported by combustible construction having at least the same fire-resistance rating as that supported. A7 | 3.1.8.5.(2) | (a) Existing functional and sound doors in existing buildings that are either hollow metal or kalamein and containing wired glass at least 6 mm thick and conforming to Sentence 3.1.8.16.(2) are permitted in lieu of doors not required to exceed 45 min, (b) all existing functional and sound hollow metal or kalamein doors which carry existing 1.5 h labels are acceptable in lieu of current 1.5 h labels and may contain wired glass panels not exceeding 0.0645 m², at least 6 mm thick and conforming to Sentence 3.1.8.16.(2), and (c) every fire door, window assembly or glass block used as a closure in a required Fire separation shall be installed in conformance with good engineering practice. A8 | 3.1.8.7., 3.1.8.8. and 3.1.8.10. | Fire dampers or fire stop flaps are not required to be installed in existing ducts at penetrations of existing Fire separations. A9 | 3.1.8.12.(1) | Existing 45 mm solid core wood doors acceptable. A10 | 3.1.8.13.(1) | Existing functionally operable self-closing devices acceptable. A11 | 3.1.8.15. | Existing functionally operable latching devices, excluding draw bolts, are acceptable. A12 | 3.1.8.16. | Existing transoms or sidelights located in required Fire separations may be retained if wired glass at least 6 mm thick is securely fixed to a steel frame with steel stops. Operable transoms shall be fixed closed. A13 | 3.1.8.17. to 3.1.8.19. | Existing acceptable. A14 | 3.1.11. | Where the concealed space is being materially altered, smoke or heat detection in that space in lieu of fire blocks and tied into fire alarm system is acceptable. A15 | 3.1.13.10. | Existing acceptable. A16 | 3.2.3. | Existing windows. (a) Existing windows in walls may be relocated to another part of the wall, provided the existing opening is blocked up to provide the same fire rating for the wall, and the projection of the new opening, at a right angle to the property line onto another building, lies not closer than 300 mm from a window in such other building, where the “opposite” window is less than 2,400 mm from the opposite new opening, and (b) except relocation of units, shall be restricted to the same fire compartment and shall conform to the requirements of Article 3.2.3.14. or 9.10.12.3. where applicable, or (c) where a building does not satisfy the requirements of Subsection 3.2.3. for the amount of openings facing a yard or space that does not have sufficient limiting distance, such existing openings are allowed to be relocated provided: (i) such openings are not increased in size and they are protected with wired glass in steel frames conforming to Sentence 3.1.8.16.(2), or (ii) the building is sprinklered. A17 | 3.2.3.6.(3) | Existing roof soffit projections acceptable. A18 | 3.2.4. | (a) Existing fire alarm system may remain except that Article 3.2.4.5. does not apply where the fire safety plan (as described in the Fire Code made under the Fire Protection and Prevention Act, 1997) for the building addresses the intent of Subsection 3.2.4. (i.e. “stage” system, electrical supervision, detection as required, Fire Department connection and emergency power supply), and (b) extension of an existing system must ensure continuity and compatibility, and integrity of the system. A19 | 3.2.4.9.(2)(e) | Does not apply to existing installations in buildings. A20 | 3.2.4.10.(5)(c) | Does not apply to existing installations in buildings. A21 | 3.2.5.3.(1) and (2) | Existing acceptable. A22 | 3.2.5.4. to 3.2.5.6. | Existing acceptable provided the building is sprinklered. A23 | 3.2.5.7. | Does not apply, except where a change in major occupancy occurs from a lesser hazard index. A24 | 3.2.5.8. to 3.2.5.11. | Does not apply to buildings 6 storeys and less. Does not apply to sprinklered buildings. A25 | 3.2.5.12. | Existing sprinkler systems in existing buildings that do not conform to NFPA 13 may be altered, added to, or extended from the existing system without complying with NFPA 13, provided the system is operational and adequate with respect to coverage, water supply and controls, and provided the system is evaluated by a qualified designer. A26 | 3.3.1.5. | One egress door is allowed where the occupant load is not greater than 100 persons, provided floor area is sprinklered and travel distance does not exceed 25 m. A27 | 3.3.1.9. | Existing width of public corridors of not less than 914 mm is acceptable. A28 | 3.3.1.9.(6) | An existing dead-end corridor is permitted where the occupant load is not greater than 20 persons, provided travel distance is not greater than 6 m plus corridor width to exit choice” point. A29 | 3.3.1.11.; 3.3.1.12. | Existing door swings may remain in heritage buildings, existing or being restored, with no change in major occupancy and with occupant load no greater than 100. A30 | 3.3.1.13. | Existing doors may remain in a heritage building, existing or being restored, with no change in major occupancy. A31 | 3.3.1.20. | Existing stained, etched, bevelled, leaded or figured glass acceptable. A32 | 3.3.5.4.(1); 3.3.5.7.(1), (3) and (4) | Need not comply where a gasketed door and self closer are provided in the existing Fire separation. A33 | 3.4.1.5.(1) | Existing acceptable. A34 | 3.4.1.5.(2) | Existing acceptable provided the existing guard is not less than 914 mm. A35 | 3.4.1.8. | Existing stained, etched, bevelled, leaded or figured glass acceptable. A36 | 3.4.2.5.(1) | Existing travel distance acceptable where floor area is sprinklered and where there is no change in major occupancy. A37 | 3.4.3.2.(5) | Need not comply where there is no increase in occupant load. A38 | 3.4.3.2.(8) | Existing width of exits acceptable provided the occupant load is not more than 15% above the exit capacity. A39 | 3.4.3.3. | Existing acceptable. A40 | 3.4.3.4. | Existing headroom clearance of not less than 1,980 mm is acceptable. A41 | 3.4.4.4.(8) | Existing washrooms opening directly into an exit stairwell shall be separated from the exit stairwell by a 45 min closure. A42 | 3.4.5.1.(2) and (9) | Existing illuminated legible exit signs are acceptable. A43 | 3.4.6.2. | Existing acceptable, if visually apparent. A44 | 3.4.6.3. | Existing acceptable. A45 | 3.4.6.4. | Existing acceptable. A46 | 3.4.6.5.(3) to (13) | Existing acceptable. A47 | 3.4.6.6.(2) to (5) | Existing acceptable. A48 | 3.4.6.7.(1) | Existing acceptable. A49 | 3.4.6.8. | Existing acceptable. A50 | 3.4.6.9. | Existing acceptable. A51 | 3.4.6.11.(1) to (4) and (6) | Existing acceptable. A52 | 3.4.6.12. | Existing acceptable in public heritage buildings or a change in occupancy with no increase in occupant load. A53 | 3.4.6.16.(2) to (4) | Existing functionally operable panic hardware acceptable. A54 | 3.4.7.2. | Combustible fire escapes which are protected from fire in accordance with Sentence 3.2.3.14.(2) are permitted or may be reconstructed or recreated (as in the case of a heritage building). A55 | 3.5.1. | Existing acceptable. A56 | 3.6.2.1.(7) | Existing Fire separation of not less than 30 min is acceptable. A57 | 3.6.2.2. | Existing acceptable where explosion-resistant construction or venting is provided. A58 | 3.6.2.6. | Existing acceptable. A59 | 3.6.2.7.(1) | 2 h Fire separation acceptable. A60 | 3.6.3.1.(1) to (5) | 45 min Fire separation acceptable. A61 | 3.6.3.3.(1) to (5) and (8) | Existing acceptable. A62 | 3.6.3.3.(9) | 1 h acceptable if sprinklered. A63 | 3.6.3.3.(10) | Existing acceptable. A64 | 3.6.3.4. | Existing acceptable. A65 | 3.6.4. | Existing acceptable. A66 | 3.7.1.3.(3) | 2.1 m is acceptable. A67 | 3.7.2.1.(3) | The minimum glass areas may be reduced by 50%. A68 | 3.7.4. | Where the occupant load is increased by more than 15% above the capacity of the existing facilities, facilities to be added to accommodate the increase. A69 | 3.8.1.2. | Existing accessible entrance acceptable. (See C.A. A75) Existing curb ramp conforming to Sentence 3.8.3.2.(3) is acceptable. Existing principal entrance acceptable, provided at least one barrier-free entrance is available. A70 | 3.8.1.3.(1) | Existing unobstructed width of 920 mm minimum is acceptable. A71 | 3.8.1.3.(4) | Existing unobstructed space not less than 1,500 mm in width and 1,500 mm in length located not more than 30 m apart is acceptable. A72 | 3.8.3.2.(3)(b) | Existing curb ramp acceptable, provided width not less than 1,200 mm. A73 | 3.8.3.3.(1) | Existing doorway acceptable, provided not less than 800 mm wide. A74 | 3.8.3.3.(11)(a) | Existing distance acceptable, provided not less than 1,200 mm plus the width of any door that swings into the space in the path of travel. A75 | 3.8.3.4.(1)(a) | Existing ramp acceptable, provided not less than 870 mm between handrails. A76 | 3.8.3.8.(5) | Existing grab bar is acceptable. A77 | 3.8.3.12. | Existing universal washroom acceptable. A78 | 3.8.3.13.(2)(g) | Existing grab bar is acceptable. A79 | 3.8.3.16. | Existing drinking fountain conforming to Clauses 3.8.3.16.(2)(a) and (b) acceptable. A80 | 3.6.3.16A. | Existing water bottle filling stations are acceptable. A81 | 3.11.3.1.(9) | Existing clear width acceptable, provided not less than 900 mm. A82 | 3.11.3.1.(14) | Existing painted line acceptable. A83 | 4.1.8. | The requirements under this Subsection do not apply. A84 | 6.3.1.1.(2) | Required outdoor air rates may be provided by mechanical, natural or combination of natural and mechanical means. A85 | 8.2.1.4. | Existing clearances acceptable where A86 | 8.2.1.4. | Existing clearances are acceptable where a replacement sewage system requires lesser clearances than those required in Part 8 for the existing sewage system.
OBC Div. C 1.2.1.2. Design by Architect or Professional Engineer
Open OBC Div. C 1.2.1.2. in the code viewer(1)A foundation of a building shall be designed by a professional engineer where,
(a)the foundation is to be constructed below the level of the footings of an adjacent building and within the angle of repose of the soil, as drawn from the bottom of the footings, or
(b)underpinning of a foundation is to be undertaken.
(2)A sprinkler protected glazed wall assembly described in Article 3.1.8.20. of Division B shall be designed by a professional engineer.
(3)A shelf and rack storage system described in Section 3.16. of Division B shall be designed by a professional engineer.
(4)The time-based egress analysis for a shelf and rack storage system described in Sentence 3.16.1.7.(7) of Division B shall be prepared or provided by an architect or a professional engineer or a combination of both.
(5)The supporting framing structure and anchorage system for a tent occupying an area greater than 225 m² shall be designed by a professional engineer.
(6)A sign structure attached in any manner to a building shall be designed by an architect or a professional engineer or a combination of both where it is,
(a)a projecting sign that weighs more than 115 kg, or
(b)a roof sign that has any face that is more than 10 m².
(7)A projecting sign attached in any manner to a parapet wall shall be designed by an architect or a professional engineer or a combination of both.
OBC Div. C 1.3.1.1. Requirement for Permits
Open OBC Div. C 1.3.1.1. in the code viewer(1)A person is exempt from the requirement to obtain a permit under section 8 of the Act,
(a)for the demolition of a farm building located on a farm,
(b)subject to Sentence (2), for the construction or demolition of a building in territory without municipal organization, or
(c)for the construction of a Class 1 sewage system.
(2)The exemption in Clause (1)(b) from the requirement to obtain a permit does not apply to the construction of a sewage system in territory without municipal organization.
(3)The application for a permit respecting the demolition of a building to which Sentence 1.2.2.3.(1) applies shall include descriptions of the structural design characteristics of the building and the method of demolition of the building.
(4)No person shall commence demolition of a building or any part of a building before the building has been vacated by the occupants except where the safety of the occupants is not affected.
(5)A tent or group of tents is exempt from the requirement to obtain a permit under section 8 of the Act and is exempt from compliance with the Code provided that the tent or group of tents are,
(a)not more than 60 m² in aggregate ground area,
(b)not attached to a building, and
(c)constructed more than 3 m from other structures.
(6)A shed is exempt from the requirement to obtain a permit under section 8 of the Act and is exempt from compliance with this Code, provided that the shed,
(a)is not more than 15 m² in gross area,
(b)is not more than one storey in building height,
(c)is not attached to a building or any other structure,
(d)is used only for storage purposes ancillary to a principal building on the lot, and
(e)does not have plumbing.
(7)A demountable stage or demountable support structure not regulated by Section 3.17. of Division B is exempt from the requirement to obtain a permit under section 8 of the Act and is exempt from compliance with this Code.
OBC Div. C 1.3.1.4. Permits Under Section 10 of the Act
Open OBC Div. C 1.3.1.4. in the code viewer(1)Except as provided in Sentence (2), the following changes in use of a building or part of a building constitute an increase in hazard for the purposes of section 10 of the Act and require a permit under section 10 of the Act:
(a)a change of the major occupancy of all or part of a building that is designated with a “Y” in Table 1.3.1.4. takes place,
(b)a suite of a Group C major occupancy is converted into more than one suite of Group C major occupancy,
(c)a suite or part of a suite of a Group A, Division 2 or a Group A, Division 4 major occupancy is converted to a gaming premises,
(d)a farm building or part of a farm building is changed to another major occupancy other than a Group G major occupancy,
(e)a farm building or part of a farm building is changed to a Group G, Division 1 major occupancy.
(f)a building or part of a building is changed to a post-disaster building,
(g)a building or part of a building is changed to a retirement home, or
(h)the use of a building or part of a building is changed and the previous major occupancy of the building or part of the building cannot be determined.
(2)A person is exempt from the requirement to obtain a permit under section 10 of the Act where the change in use of the building or part of the building will result from proposed construction and a permit under section 8 of the Act has been issued in respect of such construction.
(3)A person is exempt from the requirement to obtain a permit under section 10 of the Act for the change of use of a building in unorganized territory.
OBC Div. C 1.3.1.5. Conditional Permits
Open OBC Div. C 1.3.1.5. in the code viewer(1)The chief building official shall not issue a conditional permit for any stage of construction under subsection 8(3) of the Act unless compliance with the following applicable laws has been achieved in respect of the proposed building or construction:
(a)section 3 of the Building Transit Faster Act, 2020 with respect to the issuance of a permit under that section,
(b)section 28 of the Conservation Authorities Act with respect to the prohibition of development activities,
(c)sections 28.1, 28.1.1 and 28.1.2 of the Conservation Authorities Act with respect to a permit issued for the construction of a building or structure or for any change to a building or structure that would increase its size, alter its use or increase the number of dwelling units,
(d)regulations made by a conservation authority under clause 28(1)(c) of the Conservation Authorities Act as it read immediately before its repeal by section 25 of Schedule 4 to the Building Better Communities and Conserving Watersheds Act, 2017, with respect to permission of the authority for the construction of a building or structure if, in the opinion of the authority, the control of flooding, erosion, dynamic beaches or pollution or the conservation of land may be affected by the development,
(e)section 17.2 of the Environmental Assessment Act with respect to the approval of the Minister or the Ontario Land Tribunal to proceed with a project,
(f)subsection 24(3) of the Niagara Escarpment Planning and Development Act,
(g)subsection 27(9) of the Ontario Heritage Act,
(h)subsection 30(2) of the Ontario Heritage Act with respect to a consent of the council of a municipality to the alteration or demolition of a building where the council of the municipality has given a notice of intent to designate the building under subsection 29(3) of that Act,
(i)section 33 of the Ontario Heritage Act with respect to the consent of the council of a municipality for the alteration of property,
(j)section 34 of the Ontario Heritage Act with respect to the consent of the council of a municipality for the demolition of a building,
(k)section 34.5 of the Ontario Heritage Act with respect to the consent of the Minister to the alteration or demolition of a designated building,
(l)subsection 34.7(2) of the Ontario Heritage Act with respect to a consent of the Minister to the alteration or demolition of a building where the Minister has given a notice of intent to designate the building under section 34.6 of that Act,
(m)by-laws made under section 40.1 of the Ontario Heritage Act,
(n)section 42 of the Ontario Heritage Act with respect to the permit given by the council of a municipality for the erection, alteration or demolition of a building,
(o)section 17.4 of the Ontario New Home Warranties Plan Act with respect to the provision of a confirmation by the Registrar for the construction of a residential condominium conversion project.
(2)For the purposes of issuing a conditional permit under subsection 8(3) of the Act, a person is exempt from the requirement in clause 8(3)(a) of the Act of compliance with by-laws passed under sections 34 and 38 of the Planning Act where,
(a)a committee of adjustment has made a decision under section 45 of the Planning Act authorizing one or more minor variances from the provisions of any by-laws made under sections 34 and 38 of that Act,
(b)such minor variance or variances result in the achievement of full compliance with such by-laws, and
(c)no person informed the committee of adjustment of objections to the minor variances either in writing or in person at the hearing of the application.
(3)For the purposes of issuing a conditional permit under subsection 8(3) of the Act, a person is exempt from the requirement in clause 8(3)(a) of the Act of compliance with by-laws passed under sections 34 and 38 of the Planning Act where the construction in respect of which the conditional permit is issued is required in order to comply with an order issued under subsection 21(1) of the Fire Protection and Prevention Act, 1997 or under subsection 15.9(4) of the Act.
(4)A permit issued under subsection 8(3) of the Act shall indicate its conditional nature.
OBC Div. C 1.3.2.1. Permit Posting
Open OBC Div. C 1.3.2.1. in the code viewer(1)Where a permit has been issued pursuant to the Act, the person to whom it is issued shall have the permit or a copy of it posted at all times during construction or demolition in a conspicuous place on the property in respect of which the permit was issued.
OBC Div. C 1.3.2.2. Documentation on Site
Open OBC Div. C 1.3.2.2. in the code viewer(1)The person in charge of the construction of the building shall keep and maintain on the site of the construction,
(a)at least one copy of drawings and specifications certified by the chief building official or a person designated by the chief building official to be a copy of those submitted with the application for the permit to construct the building, together with changes that are authorized by the chief building official or a person designated by the chief building official,
(b)copies of authorizations of the Building Materials Evaluation Commission on the basis of which the permit was issued, and
(c)copies of rulings of the Minister, made under clause 29(1)(a) or (c) of the Act, on the basis of which the permit was issued.
OBC Div. C 1.3.3.1. Occupancy Permit — General
Open OBC Div. C 1.3.3.1. in the code viewer(1)Except as permitted in Sentence 1.3.3.2.(1), a person may occupy or permit to be occupied any building or part of it that has not been fully completed at the date of occupation where the chief building official or a person designated by the chief building official has issued a permit authorizing occupation of the building or part of it prior to its completion in accordance with Sentence (3).
(2)Sentence (1) does not apply in respect of the occupancy of a building to which Article 1.3.3.4., 1.3.3.5. or 1.3.3.7. applies or a building or part of it to which Article 1.3.3.8. applies.
(3)The chief building official or a person designated by the chief building official shall issue a permit authorizing occupation of a building, where,
(a)the structure of the building or part of it is completed to the roof,
(b)the enclosing walls of the building or part of them are completed to the roof,
(c)the walls enclosing the space to be occupied are completed, including balcony guards,
(d)all required fire separations and closures are completed on all storeys to be occupied,
(e)all required exits are completed, including all fire separations, doors, door hardware, self-closing devices, guards and handrails, from the uppermost floor to be occupied down to grade level and below if an exit connects with lower storeys,
(f)all shafts including closures are completed to the floor-ceiling assembly above the storey to be occupied and have a temporary fire separation at such assembly,
(g)measures have been taken to prevent access to parts of the building and site that are incomplete or still under construction,
(h)floors, halls, lobbies and required means of egress are free of loose materials and other hazards,
(i)if service rooms should be in operation, required fire separations and closures are completed,
(j)all building drains, building sewers, water systems, drainage systems and venting systems are complete and tested as operational for the storeys to be occupied,
(k)required lighting, heating and electrical supply are provided for the suites, rooms and common areas to be occupied,
(l)required lighting in corridors, stairways and exits is completed and operational up to and including all storeys to be occupied,
(m)required standpipe, sprinkler and fire alarm systems are complete and operational up to and including all storeys to be occupied, together with required pumper connections for such standpipes and sprinklers,
(n)required fire extinguishers have been installed on all storeys to be occupied,
(o)main garbage rooms, chutes and ancillary services are completed to all storeys to be occupied,
(p)required firefighting access routes have been provided and are accessible, and
(q)the sewage system has been completed and is operational.
(4)Where a registered code agency has been appointed to perform the functions described in clause 4.1(4)(b) or (c) of the Act in respect of the construction of the building, the chief building official or a person designated by the chief building official shall issue the permit referred to in Sentence (3) after receipt of a certificate for the occupancy of a building not fully completed issued by the registered code agency in respect of the building.
(5)Where applicable, the chief building official or a person designated by the chief building official shall not issue a permit authorizing occupation of the building or part of it, unless compliance with section 168.3.1 of the Environmental Protection Act has been achieved.
OBC Div. C 1.3.3.3. Notification
Open OBC Div. C 1.3.3.3. in the code viewer(1)Where a person has occupied or permitted the occupancy of a building under Article 1.3.3.1. or 1.3.3.2., such person shall notify the chief building official forthwith upon completion of the building.
OBC Div. C 1.3.5.1. Prescribed Notices
Open OBC Div. C 1.3.5.1. in the code viewer(1)This Article sets out the notices that are required under section 10.2 of the Act.
(2)The person to whom a permit under section 8 of the Act is issued shall notify the chief building official or, where a registered code agency is appointed under the Act in respect of the construction to which the notice relates, the registered code agency of,
(a)readiness to construct footings,
(b)substantial completion of footings and foundations prior to commencement of backfilling,
(c)substantial completion of structural framing and ductwork and piping for heating and air-conditioning systems, if the building is within the scope of Part 9 of Division B,
(d)substantial completion of structural framing and roughing-in of heating, ventilation, air-conditioning and air-contaminant extraction equipment, if the building is not a building to which Clause (c) applies,
(e)substantial completion of insulation and vapour barriers,
(f)substantial completion of air barrier systems,
(g)substantial completion of all required fire separations and closures and all fire protection systems including standpipe, sprinkler, fire alarm and emergency lighting systems,
(h)substantial completion of fire access routes,
(i)readiness for inspection and testing of,
(i)building sewers and building drains,
(ii)water service pipes,
(iii)fire service mains,
(iv)drainage systems and venting systems,
(v)the water distribution system, and
(vi)plumbing fixtures and plumbing appliances,
(j)readiness for inspection of suction and gravity outlets, covers and suction piping serving outlets of an outdoor pool described in Clause 1.3.1.1.(1)(j) of Division A, a public pool or a public spa,
(k)substantial completion of the circulation / recirculation system of an outdoor pool described in Clause 1.3.1.1.(1)(j) of Division A, a public pool or public spa and substantial completion of the pool before it is first filled with water,
(l)readiness to construct the sewage system,
(m)substantial completion of the installation of the sewage system before the commencement of backfilling,
(n)substantial completion of installation of plumbing not located in a structure, before the commencement of backfilling,
(o)completion of construction and installation of components required to permit the issue of an occupancy permit under Sentence 1.3.3.1.(3) or to permit occupancy under Sentence 1.3.3.2.(1), if the building or part of the building to be occupied is not fully completed, and
(p)completion of construction and installation of components required to permit the issue of an occupancy permit under Sentence 1.3.3.4.(4), 1.3.3.5.(3) or 1.3.3.7.(8).
(q)completion of construction and installation of components required to permit the issue of an occupancy permit under Sentence 1.3.3.8.(2).
OBC Div. C 1.3.6.1. Application
Open OBC Div. C 1.3.6.1. in the code viewer(1)Where a by-law, resolution or regulation has been made by a principal authority under clause 7(1)(g) of the Act, the chief building official may require that as constructed plans for the whole of, or any part or system of, a building or any class of buildings be provided by the persons responsible for the construction.
OBC Div. C 2.1.1.1. Documentation
Open OBC Div. C 2.1.1.1. in the code viewer(1)The person proposing the use of an alternative solution shall provide documentation to the chief building official or registered code agency that,
(a)identifies applicable objectives, functional statements and acceptable solutions, and
(b)establishes on the basis of past performance, tests described in Article 2.1.1.2. or other evaluation that the proposed alternative solution will achieve the level of performance required under Article 1.2.1.1. of Division A.
(2)The documentation described in Sentence (1) shall include information about relevant assumptions, limiting or restricting factors, testing procedures, studies or building performance parameters, including any commissioning, operational and maintenance requirements.
OBC Div. C 2.1.1.2. Tests
Open OBC Div. C 2.1.1.2. in the code viewer(1)Where no published test method to establish the suitability of an alternative solution proposed under Article 2.1.1.1. exists, then the tests used for the purposes of that Article shall be designed to simulate or exceed anticipated service conditions or shall be designed to compare the performance of the material or system with a similar material or system that is known to be acceptable.
(2)The results of tests or evaluations based on test standards, other than as described in this Code, may be used for the purposes of Sentence (1), if the alternate test standards provide comparable results.
OBC Div. C 2.4.2.1. Criteria
Open OBC Div. C 2.4.2.1. in the code viewer(1)Sentence (2) sets out criteria to be followed by the Minister when making a ruling under clause 29(1)(c) of the Act to approve the use of an alternative material, system or building design.
(2)The Minister’s approval of the use of an alternative material, system or building design referred to in Sentence (1) may be granted only if the approval is consistent with,
(a)a decision of the Building Code Commission in respect of a dispute described in clause 24(1)(a) of the Act,
(b)an approval of the use of the material, system or building design in the whole of another province or territory in accordance with the law of that province or territory, or
(c)a revision of the NRCC-CONST-56435E 2020, “National Building Code of Canada”, or the NRCC-CONST-56436E 2020, “National Plumbing Code of Canada”, that has been approved by the Canadian Commission on Building and Fire Codes.
OBC Div. C 2.4.3.1. Interpretations By Minister
Open OBC Div. C 2.4.3.1. in the code viewer(1)Every interpretation issued by the Minister under section 28.1 of the Act shall be made available to the public,
(a)by posting the interpretation on the Building Code website, and
(b)by providing a written copy of the interpretation on receipt of a request for it.